Vermont water infrastructure funding

Federal, state and local grants and loans that communities in Vermont can use for drinking water, wastewater and stormwater projects.

22Grant programs
7Loan programs
20Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 22Loans 7Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 7, 2026
    Watch
    Basin 5 design, construction and O&M applications for December councilCCRPC lists Dec 7 for design, construction and O&M applications and Dec 11 for project development; the Basin 5 Water Quality Council meets Dec 17. Email by 5 PM and confirm with CCRPC.Basin 5 Clean Water Service Provider grants
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. Mid-Dec 2026
    Deadline
    Bond Bank winter pool loan applicationsApplications due mid-December for closing on or about Feb 28, 2027.Bond Bank pooled loans
  4. Dec 2026
    Watch
    Lake Champlain Basin Program 2027 clean water awardsApplicants to the 2027 round are notified in December; workplans are due about a month later.Lake Champlain Basin Program clean water grants
  5. ~Mid-Dec 2026estimate
    Expected
    SRF Project Priority List call for FFY2027Based on last cycles: DEC asked for priority list applications on Dec 16, 2024. Covers Clean Water and Drinking Water SRF construction loans and Pollution Control grants.Clean Water SRF loans and loan forgiveness
  6. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  7. ~Mid-Feb 2027estimate
    Expected
    SRF Project Priority List applications dueLast cycle's comparable date was Feb 14, 2025. Needed for any Clean Water or Drinking Water SRF construction loan or Pollution Control grant.Drinking Water SRF, incl. lead service lines and PFAS
  8. ~Mid-Feb 2027estimate
    Expected
    Clean Water SRF and Pollution Control grant priority list applications dueLast cycle's comparable date was Feb 14, 2025. Apply every year you'll need construction money.Clean Water SRF loans and loan forgiveness
  9. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  10. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  11. Mid-May 2027
    Deadline
    Bond Bank summer pool loan applicationsApplications due mid-May for closing on or about Jul 31, 2027.Bond Bank pooled loans
  12. ~Early Jul 2027estimate
    Expected
    Draft SRF Intended Use Plans for commentThe FFY2025 drafts came out Jul 2, 2025, with a hearing Aug 1 and comments to Aug 8. Check that your project made the priority list and see its forgiveness.Clean Water SRF loans and loan forgiveness
  13. ~Late Jul 2027estimate
    Expected
    Lake Champlain Basin Program clean water RFP (2028 round)The 2027 RFP was released Jul 30, 2026 with proposals due Sep 29, 2026.Lake Champlain Basin Program clean water grants

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Vermont: Apply through Vermont Emergency Management (DPS.HazardMitigation@vermont.gov). No VEM intake date for FY2026 FMA was found when checked; ask well before FEMA's Feb 26, 2027 deadline.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Vermont: Swift Current needs a flood-related major disaster declaration. Vermont's most recent are DR-4810 (Jul 9–11, 2024 flooding, declared Aug 20, 2024) and DR-4826 (Jul 29–31, 2024, declared Sep 26, 2024). The July 10, 2025 flooding was not declared. Ask VEM whether Vermont qualifies.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Vermont: Hazard mitigation was declared in all 14 counties for DR-4720 (July 2023 floods) and in eight counties for DR-4810 (July 2024 floods). FEMA approved $33.2M for buyouts from these floods in Sept 2026. FEMA denied a declaration for the July 10, 2025 flooding. Ask VEM what HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Vermont: VEM took Notices of Interest for the FY2024–25 round by Apr 17, 2026, with state applications due May 15, 2026. Vermont had $2M set aside for scoping and infrastructure and $1M for building codes.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Vermont: Vermont's FFY2025 Clean Water SRF plan says any OSG grant goes to CSO abatement in rural and financially distressed communities, selected outside the plan. See Vermont's Clean Water SRF entry.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Vermont DEC's Water Investment Division runs both SRFs with the Vermont Bond Bank, plus Pollution Control grants and the Clean Water Initiative Program (Clean Water Service Provider formula grants, non-regulatory and three-acre grants); the Bond Bank also makes pooled municipal loans; ACCD's Vermont Community Development Program runs CDBG and CDBG-DR; Vermont Emergency Management handles hazard mitigation; the Lake Champlain Basin Program and regional Clean Water Service Providers such as CCRPC fund basin projects.

Clean Water SRF loans and loan forgiveness

Vermont DEC, Water Investment Division, with the Vermont Bond Bank
Rolling
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Planning and design loans accepted on a rolling basis while funds last. Construction loans need a Project Priority List application each year: the next call is expected around mid-December 2026, due around mid-February 2027.
Funding
FFY2025 plan: municipal construction loans at 0% interest with a 2% yearly admin fee (2.75% for private borrowers). Planning forgiveness 50% up to $100,000 per project. Construction forgiveness 50% up to $1M per project for communities meeting affordability criteria; 100% for emerging contaminant projects. $5M planning loan put-aside. Floodplain buyout forgiveness up to $100,000 ($250,000 in manufactured home communities), $500,000 total.
Who
Municipalities; private entities for some clean water projects. Only municipal applicants could get forgiveness under the FFY2025 plan.
Pays for
Wastewater treatment, collection systems, CSO separation, stormwater, flood resiliency work tied to a structural facility, groundwater protection and natural resources projects, from planning through construction.

Apply to the priority list every year you'll need construction money. Forgiveness is first come, first served and is reserved only once a complete application, QBS certification and draft engineering agreement are in. The FFY2025 plan bypassed projects that missed readiness dates (final design application by Nov 1, bond vote warned by Jan 31, voter approval by May 1, construction application by Jun 30). Terms shown are from the FFY2025 draft plan; check the agency for the FFY2026 plan.

How NEER helps: Planning studies and preliminary engineering reports built on calibrated sewer models; CSO and I/I studies.

Drinking Water SRF, incl. lead service lines and PFAS

Vermont DEC, Water Investment Division and Drinking Water and Groundwater Protection Division, with the Vermont Bond Bank
Rolling
LoanGrant (principal forgiveness)Drinking water
Next date
Planning loans accepted on a rolling basis while funds last. Construction loans need a Project Priority List application: next call expected around mid-December 2026, due around mid-February 2027.
Funding
FFY2025 plan: about $33.9M in forgiveness. Loans at 0% interest with a 0–2.75% admin fee. Disadvantaged communities: up to 50% forgiveness and terms up to 40 years. Lead service lines: about $9.3M forgiveness, 50% for disadvantaged construction projects; 100% up to $100,000 for planning and design where local MHI is at or below 125% of state MHI. Emerging contaminants: 100% forgiveness, capped at $5M per loan. General planning: 25% forgiveness up to $100,000 per step.
Who
Municipal and private public water systems
Pays for
Sources, treatment, storage and pipes; full lead service line replacement and inventories; PFAS treatment; planning, design and asset management plans.

Disadvantaged means MHI below the state average with user rates over 1% of MHI, or MHI at or above the state average with rates over 2.5% (24 V.S.A. § 4752). Lead line money exceeded demand, so the FFY2025 plan took lead line priority list applications at any time. Vermont deferred its FFY2025 lead line grant because earlier funds remained. Terms shown are from the FFY2025 draft plan; check the agency for the FFY2026 plan.

How NEER helps: Lead service line material prediction; water system models for planning and PFAS alternatives.

Municipal Pollution Control Grants and planning advances

Vermont DEC, Water Infrastructure Financing Program
Rolling
GrantWastewater (sewer)Stormwater & flood
Next date
Ranked from the same Project Priority List as the Clean Water SRF. Next priority list call expected around mid-December 2026.
Funding
Up to 35% of eligible cost. $4M for SFY2026. For SFY2027 the Clean Water Board's draft budget lists $4M and the Governor's March 2026 budget adjustment asked for $3.92M more. SFY2026 reserved $200,000 for Regional Planning Advances and $0 for Engineering Planning Advances.
Who
Municipalities
Pays for
Wastewater treatment plants, collection systems and municipal stormwater projects.

Most projects won't get a grant because the money is limited; the gap is usually covered with an SRF loan. Grant amounts are estimates until final design approval.

How NEER helps: Planning studies and models that support the priority list application.

MS4 stormwater grants through the Clean Water SRF

Vermont DEC, Clean Water SRF Program
Check agency
Grant (principal forgiveness)LoanStormwater & flood
Next date
Paired with Clean Water SRF loans. Check the agency for how much remains.
Funding
Up to $4M in Lake Champlain Basin Program funds; forgives up to 80% of SRF loan principal per loan step, per project
Who
Communities regulated under the MS4 General Permit
Pays for
Design and construction of stormwater practices in Flow Restoration Plans and Phosphorus Control Plans.

Construction projects must rank as fundable on the priority list. Introduced in the FFY2025 Clean Water SRF plan.

How NEER helps: Stormwater models and Flow Restoration Plan design support.

Water Quality Restoration Formula Grants (Clean Water Service Providers)

Vermont DEC, Clean Water Initiative Program, through regional Clean Water Service Providers
Rolling
GrantStormwater & flood
Next date
Each basin's Clean Water Service Provider and Basin Water Quality Council take applications on their own schedule.
Funding
$7.21M statewide in the SFY2027 draft Clean Water Budget, for projects and O&M
Who
Municipalities and organizations in the Lake Champlain and Lake Memphremagog basins, through the basin's Clean Water Service Provider
Pays for
Non-regulatory projects that measurably cut phosphorus: small stormwater practices, floodplain and wetland restoration, river corridor work and their upkeep.

Work required by a permit is not eligible, but work beyond the permit can be. These grants are created by Act 76 of 2019 and are a top-tier Clean Water Board priority.

How NEER helps: Stormwater and phosphorus load studies to identify and size projects.

Check agency
GrantStormwater & flood
Next date
Check the agency for current rounds.
Funding
$5M in the SFY2027 draft Clean Water Budget
Who
Statewide; check the agency for eligible applicants
Pays for
Finding, designing, building and maintaining natural resource and stormwater projects, including dam removals and river corridor easements. Projects must meet at least one of five goals, such as restoring degraded waters or creating resilient watersheds and communities.

Unlike the formula grants, this money is not limited to the Lake Champlain and Memphremagog basins.

How NEER helps: Flood and stormwater models that show the water quality and resilience benefit.

Three-Acre Stormwater Permit financial assistance

Vermont DEC, Clean Water Initiative Program and Clean Water SRF
Check agency
GrantLoanStormwater & flood
Next date
ARPA-funded rounds are closed. Check the agency for SFY2027 rounds.
Funding
$3.38M in the SFY2027 draft Clean Water Budget for three-acre permitting and construction. ARPA put $45.8M into three-acre sites. The FFY2025 Clean Water SRF plan reserves up to $1M for a linked deposit to finance three-acre projects.
Who
Municipally owned, municipally adopted or co-permitted, and private three-acre sites in the Lake Champlain and Lake Memphremagog basins
Pays for
Design, permit coverage and construction of stormwater practices required by General Permit 3-9050.

The municipal three-acre and MS4 line has no SFY2027 money. ARPA three-acre money was fully obligated by the end of 2024. The SRF linked deposit is mainly for businesses and residential associations and comes only after eligible municipal projects are funded.

How NEER helps: Stormwater design and modeling for three-acre sites.

GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
All money was obligated by Dec 31, 2024. No new rounds.
Funding
About $192M for water and sewer, including $36.2M for Village Water/Wastewater and $30M for CSO elimination
Who
Municipalities already awarded
Pays for
New village drinking water and community wastewater systems, CSO elimination, three-acre stormwater, small rural systems, pretreatment and homeowner septic and well repairs.

Eight village projects were still advancing in May 2025, including Highgate, Montgomery, Wolcott, Waitsfield, Burke and Killington. DEC may move rescinded village grants to the readiest projects with the most housing potential.

How NEER helps: Village wastewater and water system planning for projects moving to SRF funding.

Bond Bank pooled loans

Vermont Bond Bank
Open now
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Winter pool: applications mid-December 2026, closing about Feb 28, 2027. Summer pool: applications mid-May 2027, closing about Jul 31.
Funding
Up to 100% of project cost, up to 30 years, market rates based on the Bond Bank's AA+ rating. No application or closing fees.
Who
Cities, towns, villages, school districts and other districts
Pays for
Capital projects and equipment that Vermont law lets the borrower finance.

Up to 5 years of interest-only payments can be requested. The Bond Bank also underwrites SRF loans after DEC approves them.

How NEER helps: Capital plans and models that size the project before borrowing.

Vermont Community Development Program (CDBG)

Agency of Commerce and Community Development, Department of Housing and Community Development
Rolling
GrantDrinking waterWastewater (sewer)
Next date
Applications accepted year-round and decided at VCDP Board meetings
Funding
Implementation grants $50,000 to $1M; planning grants $3,000 to $60,000; 10% match. Vermont's 2025 CDBG allocation was $7.49M.
Who
Vermont municipalities; nonprofits and businesses as partners
Pays for
Water, sewer and other infrastructure that serves housing or economic development and mostly benefits low- and moderate-income people.

Ranges are from the July 2023 program guide; check the agency for current limits. Talk to a VCDP specialist early, since benefit to low- and moderate-income people must be documented.

How NEER helps: Engineering and planning studies for the planning grant.

CDBG Disaster Recovery (July 2023 floods)

Agency of Commerce and Community Development, Vermont Community Development Program
Rolling
GrantMatch helpDrinking waterWastewater (sewer)Stormwater & flood
Next date
Rolling. A pre-application in GEARS comes first; submit before the board meeting you want.
Funding
Implementation grants $500,000 to $10M for housing and infrastructure; mitigation set-aside of $4.9M (awards $500,000 to $4.9M) with no tie-back needed
Who
Local governments, state agencies, nonprofits and developers in Washington, Lamoille, Orleans, Caledonia, Rutland, Windsor and Windham counties
Pays for
Repairing and upgrading water, wastewater, stormwater, culverts and bridges damaged in DR-4720, and mitigation such as floodplain restoration and flood storage.

Can be used as the non-federal match for other federal grants, such as HMGP. At least 70% must benefit low- and moderate-income households. All money must be spent within 6 years of the August 2025 HUD agreement.

How NEER helps: Flood models and damage documentation that show tie-back and mitigation benefit.

VEM hazard mitigation intake (HMGP, BRIC, FMA, state resilience funds)

Vermont Emergency Management, Hazard Mitigation Section
Check agency
GrantStormwater & flood
Next date
BRIC FY2024–25 intake closed (Notice of Interest Apr 17, 2026; state application May 15, 2026). No FY2026 FMA intake date found; check the agency.
Funding
Passes through FEMA funds. BRIC FY2024–25 had $2M set aside for Vermont scoping and infrastructure projects and $1M for building codes; 75% federal, 90% for economically disadvantaged rural communities.
Who
Municipalities, regional planning commissions and state agencies with an approved local hazard mitigation plan
Pays for
Flood mitigation such as culvert upsizing, floodplain restoration, utility and municipal floodproofing, buyouts and project scoping.

Projects that still need an alternatives analysis should ask for scoping money first. In Sept 2026 FEMA approved $33.2M for at least 90 buyouts from the 2023 and 2024 floods, described as the final large round of buyout money for them. FEMA denied a declaration for the July 10, 2025 flooding, and denied the appeal Feb 7, 2026. The state's Flood Resilient Communities Fund was ARPA-funded; the related Community Resilience and Disaster Mitigation Grant Program gave out all $3.5M for home elevations in 2024.

How NEER helps: Benefit-cost analysis and flood models for scoping and FEMA applications.

Local and regional County and regional cost-share programs.

Lake Champlain Basin Program clean water grants

Patrick Leahy Lake Champlain Basin Program, with NEIWPCC
Next cycle
GrantStormwater & floodWastewater (sewer)
Next date
2027 round closed Sep 29, 2026; awards in December 2026. Next RFP expected around late July 2027.
Funding
About $865,000 in the 2027 round. Implementation up to $50,000 (small) or $50,001–$200,000 (large); planning up to $100,000.
Who
Municipalities, organizations and others in the basin; for-profit companies only for large implementation and planning grants
Pays for
Stormwater and green infrastructure, CSO reduction, streambank work and engineering plans for future water quality projects.

One proposal per entity per category. Late or incomplete proposals are not considered. Work can't start until the NEIWPCC agreement is signed.

How NEER helps: Stormwater and CSO studies for planning grants.

Basin 5 Clean Water Service Provider grants

Chittenden County Regional Planning Commission (CCRPC)
Rolling
GrantStormwater & flood
Next date
Applications are considered at monthly Basin 5 Water Quality Council meetings; December 2026 dates are listed. 2027 dates not posted.
Funding
Project development up to $40,000; assessment tasks up to $10,000. Design, construction and O&M generally capped at $60,000 per kilogram of phosphorus reduced over 15 years.
Who
Municipalities and organizations; applicants must prequalify
Pays for
Non-regulatory phosphorus projects: small stormwater practices, floodplain and wetland restoration, and O&M for older projects.

Projects required by a permit are not eligible. Email applications to CCRPC by 5 PM.

How NEER helps: Phosphorus load estimates and stormwater design for applications.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Vermont DEC: Clean Water SRF Draft Intended Use Plan for FFY2025 (Jul 2, 2025), copy on the UNM SWEFC SRF Switchboard
  21. UNM SWEFC SRF Switchboard: Vermont State Revolving Fund resources
  22. Vermont DEC: Annual Report on the Vermont EPA Pollution Control Revolving Fund (Jan 15, 2026), legislative report
  23. Vermont DEC: Proposed SFY26-27 Capital Budget Adjustment Policy Items, House Corrections and Institutions testimony (Mar 19, 2026)
  24. Vermont Bond Bank: State Revolving Funds
  25. Vermont DEC: Drinking Water SRF Draft Intended Use Plan for FFY2025 (Jul 2, 2025), copy on the UNM SWEFC SRF Switchboard
  26. Vermont DEC: Vermont Clean Water Fund and Board, House Appropriations testimony with SFY27 draft Clean Water Budget (Apr 15, 2026)
  27. CCRPC: Northern Lake Champlain Clean Water Service Provider (Basin 5)
  28. Vermont DEC: Overview of ARPA Water Infrastructure Initiatives, House Appropriations testimony (May 20, 2025)
  29. Vermont Bond Bank: Pooled Loan Program
  30. ACCD: Vermont Community Development Program Guide (July 2023)
  31. State of Vermont: HUD Consolidated Plan 2025-2029, Draft Annual Action Plan 2026 Update (Mar 16, 2026)
  32. ACCD: VCDP CDBG-DR Program Guide (June 2026)
  33. Vermont Emergency Management: BRIC FY24 & FY25 Funding Notice email (Mar 31, 2026), copy in Town of Richmond Selectboard packet
  34. Vermont Emergency Management: Community Resilience and Disaster Mitigation Grant Program report to the legislature (Nov 10, 2025)
  35. OpenFEMA: Disaster Declarations Summaries for Vermont since 2023
  36. Vermont Public: FEMA approves 90 property buyouts after Vermont's major floods (Sep 16, 2026)
  37. VTDigger: FEMA denies disaster aid for 2025 flooding, leaving NEK towns scrambling (Feb 9, 2026)
  38. Lake Champlain Basin Program: 2027 Clean Water Planning and Implementation Projects RFP (Jul 30, 2026)
  39. Govly listing of CCRPC Ongoing Call for Applications for Clean Water Projects (Vermont Business Registry bid 58668)