Rhode Island Infrastructure Bank, with RIDEM Office of Water Resources
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- SFY2027 plan runs Jul 1, 2026 to Jun 30, 2027; financial applications go to RIIB. SFY2027 list requests closed Mar 27, 2026, and the forgiveness priority date was Sep 1, 2026. SFY2028 list requests expected around late March 2027.
- Funding
- SFY2027: about $115.6M in expected loans, including $100M to the Narragansett Bay Commission. Rate is 1/3 off the borrower's market rate, terms up to 30 years, 1.0% origination fee and 0.3% yearly service fee. Forgiveness: 40% of project cost for Tier 1, 20% for Tier 2, and 25% of green project cost for any public entity, by list rank. Facility plan loans up to $150,000 for up to 3 years.
- Who
- Municipalities, sewer authorities and other public entities; nonprofits and others for nonpoint source and estuary projects
- Pays for
- Treatment upgrades, sewer, pump station and plant rehabilitation, CSO and SSO abatement, I/I, resilience upgrades, sewer extensions to failing septic areas, facility plans, stormwater projects that address a documented water quality problem, municipal stormwater plans, street sweepers and vactor trucks, green infrastructure and PFAS projects.
A project must be on RIDEM's Project Priority List for the year, and RIDEM asks only for projects ready within 18 months. Tier 1 entities include Central Falls and Woonsocket; Tier 2 includes Providence, Pawtucket, East Providence and the Narragansett Bay Commission. Drainage projects alone are not eligible. SFY2027 is the last year of extra IIJA money.
How NEER helps: Facility plans, I/I and CSO studies built on calibrated sewer models; municipal stormwater management plans.
Rhode Island Infrastructure Bank, with RIDOH Center for Drinking Water Quality
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- SFY2027 plan runs Jul 1, 2026 to Jun 30, 2027; financial applications go to RIIB. SFY2027 list applications closed Mar 20, 2026. SFY2028 list applications expected about mid-February to mid-March 2027.
- Funding
- FFY2026 grants: $3.84M base, $24.9M IIJA general, $27.5M lead line plus $11.3M reallotted, $7.64M emerging contaminants. About $111.7M in loans expected in SFY2027. Rate is 25% off the borrower's market rate, up to 20 years. Forgiveness: 40% of project cost for Tier 1, 20% for Tier 2; up to $100,000 for systems under 10,000 users, $200,000 for school systems. Lead line loans at 0%; 49% of lead line money goes to disadvantaged systems as forgiveness. All $6.8M of emerging contaminant money as forgiveness.
- Who
- Public and private community water systems and non-transient non-community schools in Rhode Island
- Pays for
- Treatment, storage, mains, emergency generators, public and private side lead service line replacement, and PFAS and other emerging contaminant projects. Planning and design loans since SFY2026.
Apply to the list every year until funded, and only for construction starting within two years. Being on the list is not a loan application. Forgiveness needs a bid project and borrowing authority. SFY2027 is the fifth and final year of IIJA money. Emergency projects can be funded off the list.
How NEER helps: Lead service line material prediction; water system models for main replacement and PFAS treatment alternatives.
RIDEM, with the Rhode Island Infrastructure Bank
Check agency
GrantMatch helpWastewater (sewer)
- Next date
- No open round posted. Check the agency.
- Funding
- About $5M from a state bond. 50% matching grant up to $250,000 for projects under $500,000; up to $1.25M for larger projects.
- Who
- Municipal and quasi-state wastewater entities
- Pays for
- Protecting wastewater collection and treatment infrastructure from natural hazards such as inundation.
Projects over $500,000 must finance the match through the CWSRF. RIDEM is running 13 grants, and Bristol and Westerly grants were in development in mid-2026.
How NEER helps: Flood exposure and resilience studies for plants and pump stations.
Rhode Island Infrastructure Bank, with RIDEM and RIHousing
Rolling
LoanWastewater (sewer)
- Next date
- No deadline. The town's program must be on the CWSRF list each time it renews.
- Funding
- Septic: homeowners pay 1% a year with a $300 fee, up to 10 years. Sewer tie-in: 0% loans of $10,000 or more, 5 years; towns borrow at 0% with no fees.
- Who
- Towns that opt in; septic loans need a RIDEM-approved On-Site Wastewater Management Plan. Homeowners apply through their town.
- Pays for
- Repair or replacement of failing septic systems and cesspools, and connection of homes to public sewers.
Nineteen communities used the septic program in mid-2026. Sewer tie-in towns include Coventry, East Providence, New Shoreham, North Smithfield, Tiverton, Warwick and Westerly.
How NEER helps: Sewer extension studies for areas with failing septic systems.
Rhode Island Infrastructure Bank
Rolling
GrantStormwater & flood
- Next date
- Rolling, reviewed quarterly; decision about eight weeks after submission
- Funding
- 25% local cost share. RIIB reported $7.6M in MRP Action Grants in fiscal 2025.
- Who
- Resilient Rhody Municipalities that finished the MRP workshop. Listed as currently eligible: Exeter, Foster, North Smithfield and Scituate.
- Pays for
- Design, engineering and construction of resilience projects identified in the town's workshop, often stormwater and flood work. Studies and plans are not eligible.
Check with RIIB whether your town is still eligible before you prepare an application. Past rounds funded stormwater systems, green infrastructure and pump station floodproofing.
How NEER helps: Stormwater and flood models that turn workshop priorities into design-ready projects.
Rhode Island Infrastructure Bank
Opening soon
GrantStormwater & flood
- Next date
- Voters approved the 2026 green bond (Question 5) on Nov 3, 2026. No round announced. Check the agency.
- Funding
- $25M in the 2026 bond. RIIB reported $2M from the fund in fiscal 2025.
- Who
- Local governments
- Pays for
- Making infrastructure, coastal habitats and river and stream floodplains more resilient, with priority for stormwater abatement and public safety and for leveraging other money.
The bond text names no agency; RIIB reported the fund's earlier money. Have shovel-ready stormwater and flood projects scoped for the first round.
How NEER helps: Flood and stormwater models to rank and size projects.
Rhode Island Infrastructure Bank
Rolling
LoanStormwater & flood
- Next date
- No deadline; terms set case by case
- Funding
- 0% interest; 1.5% fee on the total loan
- Who
- Municipalities, nonprofits and utilities with a signed state or local reimbursement grant agreement
- Pays for
- Up-front money for green infrastructure, nature-based and stormwater BMP projects that a reimbursement grant will later pay for.
Useful when a RIDEM or other reimbursement grant would otherwise force the town to carry the full cost until payment.
How NEER helps: Stormwater models and BMP sizing for the grant-funded project.
GrantStormwater & flood
- Next date
- The Nov 3, 2026 green bond includes $7M for this purpose. No new round posted. Check the agency.
- Funding
- 2024 round: $3M from the 2022 bond, grants generally $25,000 to $400,000, up to 50% of cost (75% at RIDEM's discretion).
- Who
- Local, state and regional government agencies, tribes and 501(c)(3) nonprofits such as watershed councils (2024 round)
- Pays for
- Nonpoint source and stormwater pollution control, riparian buffer and aquatic habitat restoration, and flood prevention and mitigation, with emphasis on green infrastructure.
Grants pay by reimbursement; RIIB's Stormwater Project Accelerator can bridge the cash. Terms shown are from the 2024 round.
How NEER helps: Stormwater and flood models that show the water quality and flood benefit.
RIDEM Office of Water Resources
Next cycle
GrantStormwater & flood
- Next date
- 2026 round closed Nov 16, 2026 (extended). Next round not announced.
- Funding
- About $750,000 in EPA Section 319 money; generally $25,000 to $250,000. Non-federal match of 40% of total project cost.
- Who
- Governments, public schools, universities and nonprofits
- Pays for
- Green stormwater infrastructure, riparian buffers, stream connectivity, onsite wastewater fixes, local ordinance updates and other work in targeted watersheds.
Projects should implement a watershed-based plan. Applications go through the state's eCivis grant system. Details here are from a secondary grant listing; confirm with RIDEM.
How NEER helps: Watershed and stormwater models for load reduction estimates.
GrantStormwater & flood
- Next date
- 2026 round closed May 29, 2026. No later round announced.
- Funding
- $2M from the 2024 green bond; up to $350,000 per proposal; 25% match
- Who
- Governmental and nonprofit entities that control the site or partner with the owner
- Pays for
- Nature-based solutions and removal, relocation or redesign of infrastructure to make coastal areas and river and stream floodplains more resilient.
Engineering, permitting and construction are eligible. Pre-award costs are not, unless approved within 90 days of application approval.
How NEER helps: Floodplain and coastal flood models to design and justify the project.
Rhode Island Department of Housing, Office of Housing and Community Development
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026 round closed Nov 10, 2026. Awards expected early 2027. Next round expected to open around September 2027.
- Funding
- At least 30% of the state allocation goes to the competitive round; about $1.64M or more based on a $5.76M allocation
- Who
- The 33 Rhode Island municipalities that don't get CDBG directly from HUD (not Cranston, East Providence, Pawtucket, Providence, Warwick or Woonsocket)
- Pays for
- Public facilities and improvements, planning and public services that mainly benefit low- and moderate-income people. Water, sewer and street projects are the top public facility priorities.
Towns must hold two public hearings and get council authorization before the deadline, so start in early fall. Round details are from a secondary grant listing of the 2026 workshop; confirm with the Department of Housing.
How NEER helps: Engineering studies that define the water, sewer or drainage project.
Rhode Island Infrastructure Bank
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- RIIB issues requests for proposals from time to time; none posted when checked
- Funding
- Check the agency
- Who
- Cities and towns, agencies they designate, or two or more towns together
- Pays for
- Predevelopment (such as engineering) or construction for publicly owned land or infrastructure that supports housing, jobs or community development.
The program page does not name water or stormwater projects; ask RIIB whether a utility project fits before applying.
How NEER helps: Engineering studies for infrastructure that unlocks housing.
Rhode Island Emergency Management Agency (RIEMA)
Check agency
GrantStormwater & flood
- Next date
- FY2026 FMA is due to FEMA Feb 26, 2027; RIEMA's own deadline comes earlier. Check the agency.
- Funding
- Passes through FEMA funds
- Who
- Rhode Island municipalities and other sub-applicants with a FEMA-approved hazard mitigation plan
- Pays for
- Drainage improvements, building acquisitions and elevations, and other flood mitigation projects sent to FEMA through RIEMA.
RIEMA's website blocked automated reading, so intake dates could not be confirmed. Recent major disasters with hazard mitigation: DR-4753 (Sep 2023 storms and flooding, declared Jan 7, 2024, Providence County), DR-4765 (Dec 2023 storm and flooding, declared Mar 20, 2024, Kent, Providence and Washington counties) and DR-4766 (Jan 2024 storms and flooding, declared Mar 20, 2024, Kent, Newport, Providence and Washington counties). OpenFEMA shows none since.
How NEER helps: Hazard mitigation plan actions and benefit-cost analysis backed by flood models.