Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Rhode Island water infrastructure funding

Federal, state and local grants and loans that communities in Rhode Island can use for drinking water, wastewater and stormwater projects.

23Grant programs
6Loan programs
17Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 23Loans 6Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  2. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  3. Early 2027
    Watch
    State CDBG competitive awards expectedAwards from the round that closed Nov 10, 2026, for the 33 non-entitlement municipalities.State CDBG annual competitive round (public facilities and infrastructure)
  4. ~Mid Feb 2027estimate
    Expected
    RIDOH opens the SFY2028 DWSRF Project Priority ListLast year's letter went out Feb 18, 2026. Systems already on the list but not yet funded must apply again.Drinking Water SRF, incl. lead service lines and PFAS
  5. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  6. Feb 26, 2027
    Watch
    FEMA FMA deadline; ask RIEMA about Rhode Island intakeNo RIEMA FY2026 FMA intake date could be confirmed. RIEMA's deadline will be earlier than FEMA's.RIEMA hazard mitigation intake (FMA, HMGP, BRIC)
  7. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  8. ~Mar 19, 2027estimate
    Expected
    SFY2028 DWSRF Project Priority List applications due to RIDOHLast year's were due Mar 20, 2026. Only projects starting construction within two years should apply.Drinking Water SRF, incl. lead service lines and PFAS
  9. ~Late Mar 2027estimate
    Expected
    SFY2028 CWSRF Project Priority List requests due to RIDEMLast year's were due Fri, Mar 27, 2026 at 5 p.m. Includes stormwater, septic and sewer tie-in program renewals.Clean Water SRF loans and principal forgiveness
  10. ~Early Apr 2027estimate
    Expected
    SNEP Watershed Implementation Grants letters of intentThe 2026 RFP came out Feb 24, 2026, with letters of intent due Apr 3, 2026.SNEP Watershed Implementation Grants (SWIG)
  11. ~Early Jun 2027estimate
    Expected
    Draft SFY2028 DWSRF Intended Use Plan out for 30-day commentThe SFY2027 draft was noticed Jun 5, 2026. Check your project's rank and forgiveness.Drinking Water SRF, incl. lead service lines and PFAS
  12. ~Sep 1, 2027estimate
    Expected
    CWSRF priority date for principal forgivenessFor SFY2027, financial applications to RIIB by Sep 1, 2026 got first call on forgiveness. Confirm the SFY2028 date in the next plan.Clean Water SRF loans and principal forgiveness
  13. ~Early Oct 2027estimate
    Expected
    Narragansett Bay Estuary Program design and permitting proposalsThe 2026 round was posted Jul 20 with proposals due Oct 2, 2026.Narragansett Bay Estuary Program design, engineering and permitting grants

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Rhode Island: Apply through RIEMA, which sends sub-applications to FEMA by Feb 26, 2027. RIEMA's own FY2026 intake date could not be confirmed; ask early.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Rhode Island: Swift Current needs a flood-related major disaster declaration. Rhode Island's most recent is DR-4766 (Jan 2024 storms and flooding, declared Mar 20, 2024). Ask RIEMA whether Rhode Island qualifies.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Rhode Island: DR-4753, DR-4765 and DR-4766 (storms and flooding in Sep 2023, Dec 2023 and Jan 2024) included hazard mitigation. OpenFEMA shows no Rhode Island major disaster since Mar 2024. Ask RIEMA what HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Rhode Island: Apply through RIEMA. RIEMA's pages could not be read when checked; ask RIEMA about timing for the next round.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Rhode Island: Run alongside the DWSRF. The SFY2027 plan pairs $2.15M in EC-SDC money with Kingston Water District's PFAS treatment project.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Rhode Island The Rhode Island Infrastructure Bank (RIIB) runs both SRFs, with RIDEM ranking clean water projects and RIDOH ranking drinking water projects, and also runs the Municipal Resilience Program, Stormwater Project Accelerator, septic and sewer tie-in loans and the Municipal Infrastructure Grant Program; RIDEM gives bond-funded watershed, nonpoint source and climate resilience grants; the Department of Housing runs state CDBG; RIEMA handles FEMA hazard mitigation.

Clean Water SRF loans and principal forgiveness

Rhode Island Infrastructure Bank, with RIDEM Office of Water Resources
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
SFY2027 plan runs Jul 1, 2026 to Jun 30, 2027; financial applications go to RIIB. SFY2027 list requests closed Mar 27, 2026, and the forgiveness priority date was Sep 1, 2026. SFY2028 list requests expected around late March 2027.
Funding
SFY2027: about $115.6M in expected loans, including $100M to the Narragansett Bay Commission. Rate is 1/3 off the borrower's market rate, terms up to 30 years, 1.0% origination fee and 0.3% yearly service fee. Forgiveness: 40% of project cost for Tier 1, 20% for Tier 2, and 25% of green project cost for any public entity, by list rank. Facility plan loans up to $150,000 for up to 3 years.
Who
Municipalities, sewer authorities and other public entities; nonprofits and others for nonpoint source and estuary projects
Pays for
Treatment upgrades, sewer, pump station and plant rehabilitation, CSO and SSO abatement, I/I, resilience upgrades, sewer extensions to failing septic areas, facility plans, stormwater projects that address a documented water quality problem, municipal stormwater plans, street sweepers and vactor trucks, green infrastructure and PFAS projects.

A project must be on RIDEM's Project Priority List for the year, and RIDEM asks only for projects ready within 18 months. Tier 1 entities include Central Falls and Woonsocket; Tier 2 includes Providence, Pawtucket, East Providence and the Narragansett Bay Commission. Drainage projects alone are not eligible. SFY2027 is the last year of extra IIJA money.

How NEER helps: Facility plans, I/I and CSO studies built on calibrated sewer models; municipal stormwater management plans.

Drinking Water SRF, incl. lead service lines and PFAS

Rhode Island Infrastructure Bank, with RIDOH Center for Drinking Water Quality
Open now
LoanGrant (principal forgiveness)Drinking water
Next date
SFY2027 plan runs Jul 1, 2026 to Jun 30, 2027; financial applications go to RIIB. SFY2027 list applications closed Mar 20, 2026. SFY2028 list applications expected about mid-February to mid-March 2027.
Funding
FFY2026 grants: $3.84M base, $24.9M IIJA general, $27.5M lead line plus $11.3M reallotted, $7.64M emerging contaminants. About $111.7M in loans expected in SFY2027. Rate is 25% off the borrower's market rate, up to 20 years. Forgiveness: 40% of project cost for Tier 1, 20% for Tier 2; up to $100,000 for systems under 10,000 users, $200,000 for school systems. Lead line loans at 0%; 49% of lead line money goes to disadvantaged systems as forgiveness. All $6.8M of emerging contaminant money as forgiveness.
Who
Public and private community water systems and non-transient non-community schools in Rhode Island
Pays for
Treatment, storage, mains, emergency generators, public and private side lead service line replacement, and PFAS and other emerging contaminant projects. Planning and design loans since SFY2026.

Apply to the list every year until funded, and only for construction starting within two years. Being on the list is not a loan application. Forgiveness needs a bid project and borrowing authority. SFY2027 is the fifth and final year of IIJA money. Emergency projects can be funded off the list.

How NEER helps: Lead service line material prediction; water system models for main replacement and PFAS treatment alternatives.

Wastewater Treatment Facility Resilience Fund

RIDEM, with the Rhode Island Infrastructure Bank
Check agency
GrantMatch helpWastewater (sewer)
Next date
No open round posted. Check the agency.
Funding
About $5M from a state bond. 50% matching grant up to $250,000 for projects under $500,000; up to $1.25M for larger projects.
Who
Municipal and quasi-state wastewater entities
Pays for
Protecting wastewater collection and treatment infrastructure from natural hazards such as inundation.

Projects over $500,000 must finance the match through the CWSRF. RIDEM is running 13 grants, and Bristol and Westerly grants were in development in mid-2026.

How NEER helps: Flood exposure and resilience studies for plants and pump stations.

Community Septic System Loan Program and Sewer Tie-In Loan Fund

Rhode Island Infrastructure Bank, with RIDEM and RIHousing
Rolling
LoanWastewater (sewer)
Next date
No deadline. The town's program must be on the CWSRF list each time it renews.
Funding
Septic: homeowners pay 1% a year with a $300 fee, up to 10 years. Sewer tie-in: 0% loans of $10,000 or more, 5 years; towns borrow at 0% with no fees.
Who
Towns that opt in; septic loans need a RIDEM-approved On-Site Wastewater Management Plan. Homeowners apply through their town.
Pays for
Repair or replacement of failing septic systems and cesspools, and connection of homes to public sewers.

Nineteen communities used the septic program in mid-2026. Sewer tie-in towns include Coventry, East Providence, New Shoreham, North Smithfield, Tiverton, Warwick and Westerly.

How NEER helps: Sewer extension studies for areas with failing septic systems.

Municipal Resilience Program (MRP) Action Grants

Rhode Island Infrastructure Bank
Rolling
GrantStormwater & flood
Next date
Rolling, reviewed quarterly; decision about eight weeks after submission
Funding
25% local cost share. RIIB reported $7.6M in MRP Action Grants in fiscal 2025.
Who
Resilient Rhody Municipalities that finished the MRP workshop. Listed as currently eligible: Exeter, Foster, North Smithfield and Scituate.
Pays for
Design, engineering and construction of resilience projects identified in the town's workshop, often stormwater and flood work. Studies and plans are not eligible.

Check with RIIB whether your town is still eligible before you prepare an application. Past rounds funded stormwater systems, green infrastructure and pump station floodproofing.

How NEER helps: Stormwater and flood models that turn workshop priorities into design-ready projects.

Opening soon
GrantStormwater & flood
Next date
Voters approved the 2026 green bond (Question 5) on Nov 3, 2026. No round announced. Check the agency.
Funding
$25M in the 2026 bond. RIIB reported $2M from the fund in fiscal 2025.
Who
Local governments
Pays for
Making infrastructure, coastal habitats and river and stream floodplains more resilient, with priority for stormwater abatement and public safety and for leveraging other money.

The bond text names no agency; RIIB reported the fund's earlier money. Have shovel-ready stormwater and flood projects scoped for the first round.

How NEER helps: Flood and stormwater models to rank and size projects.

Stormwater Project Accelerator (bridge loans)

Rhode Island Infrastructure Bank
Rolling
LoanStormwater & flood
Next date
No deadline; terms set case by case
Funding
0% interest; 1.5% fee on the total loan
Who
Municipalities, nonprofits and utilities with a signed state or local reimbursement grant agreement
Pays for
Up-front money for green infrastructure, nature-based and stormwater BMP projects that a reimbursement grant will later pay for.

Useful when a RIDEM or other reimbursement grant would otherwise force the town to carry the full cost until payment.

How NEER helps: Stormwater models and BMP sizing for the grant-funded project.

GrantStormwater & flood
Next date
The Nov 3, 2026 green bond includes $7M for this purpose. No new round posted. Check the agency.
Funding
2024 round: $3M from the 2022 bond, grants generally $25,000 to $400,000, up to 50% of cost (75% at RIDEM's discretion).
Who
Local, state and regional government agencies, tribes and 501(c)(3) nonprofits such as watershed councils (2024 round)
Pays for
Nonpoint source and stormwater pollution control, riparian buffer and aquatic habitat restoration, and flood prevention and mitigation, with emphasis on green infrastructure.

Grants pay by reimbursement; RIIB's Stormwater Project Accelerator can bridge the cash. Terms shown are from the 2024 round.

How NEER helps: Stormwater and flood models that show the water quality and flood benefit.

Next cycle
GrantStormwater & flood
Next date
2026 round closed Nov 16, 2026 (extended). Next round not announced.
Funding
About $750,000 in EPA Section 319 money; generally $25,000 to $250,000. Non-federal match of 40% of total project cost.
Who
Governments, public schools, universities and nonprofits
Pays for
Green stormwater infrastructure, riparian buffers, stream connectivity, onsite wastewater fixes, local ordinance updates and other work in targeted watersheds.

Projects should implement a watershed-based plan. Applications go through the state's eCivis grant system. Details here are from a secondary grant listing; confirm with RIDEM.

How NEER helps: Watershed and stormwater models for load reduction estimates.

GrantStormwater & flood
Next date
2026 round closed May 29, 2026. No later round announced.
Funding
$2M from the 2024 green bond; up to $350,000 per proposal; 25% match
Who
Governmental and nonprofit entities that control the site or partner with the owner
Pays for
Nature-based solutions and removal, relocation or redesign of infrastructure to make coastal areas and river and stream floodplains more resilient.

Engineering, permitting and construction are eligible. Pre-award costs are not, unless approved within 90 days of application approval.

How NEER helps: Floodplain and coastal flood models to design and justify the project.

State CDBG annual competitive round (public facilities and infrastructure)

Rhode Island Department of Housing, Office of Housing and Community Development
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 round closed Nov 10, 2026. Awards expected early 2027. Next round expected to open around September 2027.
Funding
At least 30% of the state allocation goes to the competitive round; about $1.64M or more based on a $5.76M allocation
Who
The 33 Rhode Island municipalities that don't get CDBG directly from HUD (not Cranston, East Providence, Pawtucket, Providence, Warwick or Woonsocket)
Pays for
Public facilities and improvements, planning and public services that mainly benefit low- and moderate-income people. Water, sewer and street projects are the top public facility priorities.

Towns must hold two public hearings and get council authorization before the deadline, so start in early fall. Round details are from a secondary grant listing of the 2026 workshop; confirm with the Department of Housing.

How NEER helps: Engineering studies that define the water, sewer or drainage project.

Municipal Infrastructure Grant Program

Rhode Island Infrastructure Bank
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
RIIB issues requests for proposals from time to time; none posted when checked
Funding
Check the agency
Who
Cities and towns, agencies they designate, or two or more towns together
Pays for
Predevelopment (such as engineering) or construction for publicly owned land or infrastructure that supports housing, jobs or community development.

The program page does not name water or stormwater projects; ask RIIB whether a utility project fits before applying.

How NEER helps: Engineering studies for infrastructure that unlocks housing.

RIEMA hazard mitigation intake (FMA, HMGP, BRIC)

Rhode Island Emergency Management Agency (RIEMA)
Check agency
GrantStormwater & flood
Next date
FY2026 FMA is due to FEMA Feb 26, 2027; RIEMA's own deadline comes earlier. Check the agency.
Funding
Passes through FEMA funds
Who
Rhode Island municipalities and other sub-applicants with a FEMA-approved hazard mitigation plan
Pays for
Drainage improvements, building acquisitions and elevations, and other flood mitigation projects sent to FEMA through RIEMA.

RIEMA's website blocked automated reading, so intake dates could not be confirmed. Recent major disasters with hazard mitigation: DR-4753 (Sep 2023 storms and flooding, declared Jan 7, 2024, Providence County), DR-4765 (Dec 2023 storm and flooding, declared Mar 20, 2024, Kent, Providence and Washington counties) and DR-4766 (Jan 2024 storms and flooding, declared Mar 20, 2024, Kent, Newport, Providence and Washington counties). OpenFEMA shows none since.

How NEER helps: Hazard mitigation plan actions and benefit-cost analysis backed by flood models.

Local and regional County and regional cost-share programs.

Rolling
Grant (free private-side replacement for eligible owners, not a cash grant)Drinking water
Next date
No deadline; eligibility depends on the property's location and available funding
Funding
Private side free for eligible owners; public side at no cost to owners. December 2025 request to borrow $26.2M from the DWSRF, with up to $12.8M (49%) as forgiveness.
Who
Providence Water customers with lead service lines
Pays for
Replacement of public and private side lead service lines. Providence Water counts about 6,300 public side and 22,000 private side lead lines.

Providence Water uses the DWSRF loan for the public side and the forgiveness for the private side, and aims to replace all its lead lines in about eight years if money allows. Check Providence Water's lead map for current eligibility.

How NEER helps: Lead service line material prediction for unverified lines.

Next cycle
GrantStormwater & flood
Next date
2026 round closed Oct 2, 2026; awards expected Oct 30, 2026. Next round expected around July 2027.
Funding
About $880,000 in IIJA money through EPA (2026 round)
Who
Check the agency; the 2026 page does not list eligible applicants
Pays for
Design, engineering and permitting for water quality and habitat restoration projects that advance the 2026 CCMP and at least one other local, state or regional plan.

Covers the pre-construction steps that larger grants often don't pay for. Watersheds reach into Massachusetts and Connecticut.

How NEER helps: Stormwater and water quality models to support design and permitting.

SNEP Watershed Implementation Grants (SWIG)

Restore America's Estuaries, with EPA's Southeast New England Program
Next cycle
GrantStormwater & flood
Next date
2026 round closed (letters of intent Apr 3, full proposals Jun 19, 2026). 2027 letters of intent expected around early April 2027.
Funding
2026: typically $50,000 to $150,000, max $250,000; 10 to 15 awards. 33% non-federal match.
Who
State, county and local governments and their subdivisions, and other eligible organizations, for work in the SNEP region
Pays for
Watershed and coastal restoration, nature-based solutions in small cities, nutrient reduction, stormwater and sustainable clean water financing.

Two steps: an open letter of intent, then an invited full proposal. 2026 projects had to be ready to start on award (Sep 1, 2026).

How NEER helps: Stormwater and nutrient load models for the proposal.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. RIIB and RIDEM, CWSRF Intended Use Plan SFY2027 (final, with attachments, June 2026)
  21. RIDEM, Project Solicitation for the SFY2027 CWSRF Project Priority List (deadline Mar 27, 2026)
  22. RIIB, Clean Water State Revolving Fund
  23. RIIB and RIDOH, DWSRF Intended Use Plan SFY2027 (final)
  24. RIDOH, DWSRF Project Priority List SFY2027 Applications letter (Feb 18, 2026)
  25. RI.gov press release, Public notice of proposed SFY2027 DWSRF Intended Use Plan (Jun 5, 2026)
  26. RIIB, Drinking Water State Revolving Fund
  27. RIIB, Sewer Tie-In Loan Fund
  28. RIIB, Municipal Resilience Program
  29. Providence Business News, R.I. Infrastructure Bank reports $202M in statewide investments for fiscal 2025 (Oct 20, 2025)
  30. Providence Business News, R.I. Infrastructure Bank awards $4.9M for municipal climate resiliency projects (Apr 18, 2022)
  31. RI General Assembly, 2026 Public Law ch. 084, Article 5 (bond questions, incl. Question 5 Green Economy Bonds)
  32. Turnto10, Rhode Island voters reject statewide bonds for first time in 20 years (Nov 4, 2026; Questions 1, 2 and 5 passed)
  33. RIIB, Stormwater Project Accelerator
  34. RIDEM, 2024 Bay and Watershed Restoration Fund Grants RFP (Dec 12, 2023)
  35. Atom Grants (secondary listing), RIDEM Nonpoint Source Implementation Grants: Targeted Watersheds
  36. RIDEM, Climate Resilience Fund RFP (Apr 15, 2026)
  37. RI Department of Housing, PY2026 Annual Action Plan, draft (Apr 16, 2026)
  38. GrantedAI (secondary listing of the 2026 CDBG Annual Competitive Application workshop), Rhode Island Department of Housing CDBG Competitive
  39. RIIB, Municipal Infrastructure Grant Program
  40. OpenFEMA, Disaster Declarations Summaries for Rhode Island
  41. FEMA Advisory, FEMA Announces $400 Million Funding Opportunity to Reduce Flood Risk (Oct 22, 2026)
  42. Providence Water, Application for authority to borrow up to $26.2M from the DWSRF (filed with RI Division of Public Utilities, Dec 5, 2025)
  43. Providence Business News, R.I. Infrastructure Bank closes on $26.3M loan to Providence Water for lead service line replacement program (May 5, 2025)
  44. Narragansett Bay Estuary Program, 2026 Water Quality and Habitat RFP
  45. Restore America's Estuaries, 2026 SNEP Watershed Implementation Grants RFP (extended May 2026)