Texas Water Development Board
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- SFY 2028 Project Information Forms expected due early March 2027 (SFY 2027 deadline was Mar 6, 2026). Solicitation opens each December; PIFs accepted anytime after, but late ones miss the initial list.
- Funding
- Up to $575M in SFY 2027, incl. $67M principal forgiveness. Disadvantaged: 70% forgiveness. Small/rural disadvantaged: up to $1.5M forgiveness plus 0% loan. Very disadvantaged (income under 50% of state): 100%. Very small systems (1,000 people or fewer): up to $500K. Urgent need: up to $500K ($800K if disadvantaged). First-time service: up to $200K. Green: 15% of green costs. Caps: $10M forgiveness and $76M loan per project. Loans 35–40% below market rate; 1.75% origination fee.
- Who
- Cities, counties, districts, river authorities and other public bodies with sewage authority; designated management agencies; tribes; private entities for nonpoint source and estuary projects only
- Pays for
- Wastewater treatment, collection, reuse, stormwater and subsurface drainage, nonpoint source control, estuary management, green projects and related planning and design.
Disadvantaged status needs service-area income at or below 75% of the state median and a household cost factor of at least 1% (2% for water and sewer). It is set from the PIF and worksheets filed by the deadline. Applications are by invitation only, from the priority list.
How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies.
Texas Water Development Board
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- SFY 2028 Project Information Forms expected due early March 2027 (SFY 2027 deadline was Mar 6, 2026). Solicitation opens each December; PIFs accepted anytime after, but late ones miss the initial list.
- Funding
- At least $490.6M in SFY 2027, incl. $109.6M principal forgiveness. Disadvantaged: 70% forgiveness. Small/rural disadvantaged: up to $1.5M plus 0% loan. Very disadvantaged: 100%. Very small systems: up to $500K. Urgent need: up to $800K. First-time service: up to $200K. Green: 15% of green costs. Caps: $10M forgiveness and $57M loan per project. Loans 30–35% below market rate; 2.0% origination fee.
- Who
- Public and privately owned community water systems, nonprofit water supply corporations and nonprofit non-community public water systems
- Pays for
- Fixing water quality, capacity, pressure or water loss problems; upgrading or replacing systems; consolidation; buying capacity or systems; source water protection; green projects.
Lead service line and emerging contaminant money is offered under separate plans with their own forms. Use the system's full population and connections on the PIF, not the project area's.
How NEER helps: Water system models; lead service line material prediction.
Texas Water Development Board
Next cycle
LoanGrant (51% principal forgiveness)Drinking water
- Next date
- SFY 2027 PIFs were due Aug 14, 2026. Later PIFs go to the bottom of the list. SFY 2027 is the last year of IIJA lead line funding.
- Funding
- 51% principal forgiveness and 49% loan. Inventory loans at 0%; other loans at the DWSRF reduced rate; 2.0% origination fee.
- Who
- DWSRF-eligible water systems whose project area meets the program's own disadvantaged criteria
- Pays for
- Service line inventories, planning, design and replacement of lead service lines.
PIFs for this program go by email as one PDF, not through the online loan system.
How NEER helps: Lead service line material prediction and inventory support.
Texas Water Development Board
Opening soon
Grant (100% principal forgiveness)Drinking waterWastewater (sewer)
- Next date
- SFY 2027 solicitation, the final year of the program, opens December 2026
- Funding
- SFY 2026 round: about $55.6M (drinking water) and $9.3M (clean water), all as 100% principal forgiveness. SFY 2027 amounts not yet posted.
- Who
- Drinking water: community water systems, nonprofit non-community systems, state agencies. Clean water: the same entities eligible for the Clean Water SRF.
- Pays for
- Projects that address emerging contaminants such as PFAS in drinking water or wastewater.
Last cycle's PIFs were emailed as Word documents, not filed in the online loan system. Terms shown are from SFY 2026; confirm in the SFY 2027 plan.
How NEER helps: Treatment alternatives and source studies for PFAS.
Texas Water Development Board
Opening soon
GrantLoanMatch helpStormwater & flood
- Next date
- 2026–27 abridged application window opens after the final plan; TWDB lists the date as TBD
- Funding
- At least $312.4M for 2026–27. Studies (FME) and strategies (FMS): 100% grant if area income is at or below 125% of the state median, otherwise 90%. Projects (FMP): 25% grant, or 75% if area income is at or below 85%, plus 5% rural and 5% nature-based, up to 85%. 0% loans for the rest. Per-application caps: FME and FMS $5M grant and $5M loan; FMP $15M grant and $30M loan.
- Who
- Cities, counties and water districts or authorities. Other political subdivisions and nonprofit water supply corporations can apply for studies only.
- Pays for
- Flood studies, projects and strategies recommended in the regional and state flood plans: drainage, detention, levees, buyouts, warning systems, gauges and federal match.
Only a whole study or project from the regional flood plan is eligible, with its plan ID. No entity can be funded for more than two abridged applications in one category. A benefit-cost analysis is no longer required with the abridged application.
How NEER helps: H&H models for flood management evaluations and project benefits.
Texas Water Development Board
Opening soon
LoanDrinking water
- Next date
- 2027 cycle not yet posted. The 2026 cycle took abridged applications Dec 16, 2025 to Feb 2, 2026.
- Funding
- Low-interest loans (2026 cycle: up to 25% rate subsidy on 20-year tax-exempt loans, up to 50% for rural and agricultural), deferred loans up to 8 years, or board participation up to 80% of project cost
- Who
- Political subdivisions and nonprofit water supply corporations with a project in the state water plan
- Pays for
- Water management strategies with a capital cost recommended in the state water plan: conservation, reuse, desalination, pipelines, reservoirs and well fields.
Subsidy levels are set each spring when the Board ranks projects.
How NEER helps: Water supply and distribution modeling for project planning.
Texas Water Development Board
Check agency
GrantLoanDrinking waterWastewater (sewer)
- Next date
- No open cycle posted; the last plan covered 2024–25. Check the agency.
- Funding
- 70% grant and 30% loan; loans up to 20 years
- Who
- Cities, counties, water districts, nonprofit water supply corporations and other political subdivisions serving distressed areas
- Pays for
- Water and sewer service for residential areas that lack it or whose systems don't meet state standards.
The area's median household income must be at or below 75% of the state's, and it must have been an established residential subdivision by June 1, 2005. The city or county must adopt and enforce Model Subdivision Rules before applying. Grants above 50% need a public health nuisance finding from DSHS.
How NEER helps: Engineering for water and sewer extensions.
Texas Water Development Board
Next cycle
GrantDrinking water
- Next date
- Applications closed Jul 30, 2026. Board considers extra-large and large awards Dec 3; others at a later meeting. Funds must go out by Aug 31, 2027.
- Funding
- $1.038B in one-time 100% grants
- Who
- Cities, counties and other governmental entities. Water supply corporations and investor-owned utilities are not eligible.
- Pays for
- Water supply and water infrastructure, incl. water loss, TCEQ violations and system upgrades. Wastewater, drainage, flood control and non-potable reuse are not eligible.
Applicants needed current audits, water use surveys, water loss audits and conservation plans, with no waivers.
How NEER helps: Water system models and water loss analysis.
Texas Water Development Board
Open now
GrantDrinking water
- Next date
- Jan 13, 2027, 11:59 p.m. CST, through the online loan application system
- Funding
- Up to $50M in one-time 100% grants from the Texas Water Fund
- Who
- Water supply corporations serving existing residential customers. Those serving mainly commercial or industrial customers are not eligible.
- Pays for
- Water infrastructure for water supply, conservation and water loss.
File the income worksheet, then the online application (labeled RWAF), then the completion form.
How NEER helps: Water loss analysis and system models to define the project.
Texas Water Development Board
Opening soon
LoanGrantDrinking water
- Next date
- Prop 4 money expected to reach TWDB programs in fall 2029
- Funding
- Prop 4 (approved Nov 4, 2025): $1B a year for 20 years from the 2028–29 biennium, half for new water supplies and half for aging infrastructure
- Who
- Applicants of the TWDB program each dollar moves through
- Pays for
- The fund can't lend or grant directly. TWDB moves its money into existing programs and the New Water Supply for Texas Fund.
Current Texas Water Fund money is going out through programs such as the Water Supply Corporations Grant.
How NEER helps: Water supply and infrastructure planning studies.
Texas Water Development Board
Next cycle
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Last posted deadline was Sep 30, 2026. Check the agency for the next one.
- Funding
- Loans at about TWDB's cost of funds; no federal requirements
- Who
- Political subdivisions at tax-exempt rates; nonprofit water supply corporations at taxable rates
- Pays for
- Water supply, wastewater and flood control projects, incl. several in one loan.
Start with a pre-application meeting with TWDB's regional team. Water supply projects must match the state water plan.
How NEER helps: Engineering and planning studies.
Texas Water Development Board
Rolling
Grant (contracted services, not cash)Drinking waterWastewater (sewer)
- Next date
- WUTAP: apply anytime. AMPSS: check the agency for the next PIF date.
- Funding
- WUTAP: up to $150K in services. AMPSS: up to $100K per project, no match.
- Who
- WUTAP: any Texas water or wastewater system that plans to seek TWDB funding. AMPSS: 5,000 connections or fewer, or 10,000 people or fewer outside larger cities.
- Pays for
- WUTAP: conservation plans, PIF and application help, rate studies. AMPSS: asset management plan, O&M manual and training.
AMPSS systems commit about 80 hours of staff time.
How NEER helps: Asset inventories and condition data that feed the plan.
Texas Water Development Board
Open now
GrantStormwater & flood
- Next date
- Swift Current: Dec 16, 2026. FMA: Jan 11, 2027 to TWDB in FEMA GO.
- Funding
- Passes through FEMA funds; $30M Swift Current for Texas
- Who
- Cities, counties and special districts, applying for NFIP-insured properties. Owners can't apply directly.
- Pays for
- Mitigation of repetitive and severe repetitive loss properties and other flood projects under FEMA FMA.
In Texas, FMA goes to TWDB, not TDEM. Swift Current gives priority to communities hit by the July 2025 and 2026 floods. TWDB staff help with benefit-cost analysis.
How NEER helps: Flood models and depth data for benefit-cost analysis.
Texas Division of Emergency Management
Check agency
GrantStormwater & flood
- Next date
- No open period listed as of Nov 2026. Applications open when a disaster or FEMA round makes funds available.
- Funding
- Passes through FEMA funds
- Who
- Texas jurisdictions with a FEMA-approved local hazard mitigation plan
- Pays for
- Flood and other hazard mitigation projects after federal disasters (HMGP) and in national rounds (BRIC).
DR-4879 covers the July 2025 Hill Country floods. A major disaster declaration for the July 2026 floods was approved Sep 3, 2026; Texas's request for statewide HMGP was still pending on Sep 25, 2026. Work with your TDEM Regional Section Chief and apply in TDEM's grants system.
How NEER helps: Hazard mitigation plan action items backed by flood models.
Texas Department of Agriculture
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2027–28 Community Applications closed Nov 19, 2026. Invited communities hear about Dec 15, 2026, then file project info by Feb 1, 2027 and full applications by Jun 1, 2027.
- Funding
- Up to $750K; no minimum match, but match earns points
- Who
- Non-entitlement cities under 50,000 and mostly rural counties; at least 51% low-to-moderate income beneficiaries
- Pays for
- Water, sewer, street and drainage improvements in residential areas.
Funds compete separately in each of 24 planning regions. Scoring: regional priorities 50, match 50, previous funding 60, poverty 20, past performance 20. Applications are taken every other year.
How NEER helps: Drainage and utility studies to define the project.
Texas General Land Office
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Mitigation Reallocation Program call closed Nov 18, 2026. 2024 Disasters Local Communities Program closed Mar 23, 2026.
- Funding
- Local Communities Program: $97,033,950 for 2024 disasters, at least 80% to the 27 most impacted counties. Reallocation Program: unused CDBG-MIT funds; amount not posted.
- Who
- LCP: cities, counties and tribes in 92 eligible counties (2024 storms DR-4781 and Hurricane Beryl DR-4798). MRP: local governments, tribes and special districts such as MUDs and drainage districts in mitigation-eligible counties.
- Pays for
- Flood and drainage, water, wastewater and street improvements.
GLO posts calls with short windows, about a month each. Watch recovery.texas.gov for the next one.
How NEER helps: Drainage studies and project benefit data.
Texas Commission on Environmental Quality
Next cycle
GrantStormwater & flood
- Next date
- Next request for applications expected summer 2027
- Funding
- Reimburses 60% of project cost; 40% match, in-kind allowed
- Who
- Cities, counties, special districts, state agencies, universities, nonprofits and federal agencies
- Pays for
- Watershed protection plans, low impact development, stormwater retrofits, riparian restoration and septic repair.
Work required by an MS4 permit is not eligible. At least half the money goes to EPA-accepted watershed protection plans.
How NEER helps: Watershed and stormwater load modeling.