Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 16, 2026

Missouri water infrastructure funding

Federal, state and local grants and loans that communities in Missouri can use for drinking water, wastewater and stormwater projects.

15Grant programs
4Loan programs
13Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 15Loans 4Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  2. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  3. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  4. Mar 1, 2027
    Deadline
    Missouri SRF applications for first preferenceClean water and drinking water loans and grants, Integrated Management Plan grant.Clean Water SRF loans and grants
  5. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  6. ~Mid-2027estimate
    Expected
    HMGP applications for Missouri’s 2026 disastersUsually due within 12 months of each declaration. Confirm with SEMA.Hazard Mitigation Grant Program (HMGP)
  7. ~Jun–Aug 2027estimate
    Expected
    Missouri FY2028 SRF plan public commentCheck that your project is on the priority list.Drinking Water SRF, incl. lead service lines
  8. ~Jul 2027estimate
    Expected
    Missouri CDBG competitive cycle closesThe FY2026 cycle closed July 31.CDBG Competitive Cycle (general infrastructure)

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Missouri: Apply through SEMA. Send a Notice of Interest now; FMA NOIs are accepted anytime and kept on file for two years.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Missouri: Missouri had flood-related major disaster declarations in 2026. Ask SEMA whether Swift Current was triggered for your county.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Missouri: Missouri had major disaster declarations for storms and flooding in April, June and July 2026 (HMGP was under review for some).

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Missouri: Ask MoDNR how and when it will distribute Missouri’s allotment.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Missouri: Through the MoDNR drinking water program.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

In Missouri: Missouri projects go through the joint Missouri Water & Wastewater Review Committee (USDA, MoDNR and CDBG).

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

In Missouri: Kansas City-area requests go to the Kansas City District.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Missouri Missouri DNR, Economic Development and SEMA.

Clean Water SRF loans and grants

Missouri DNR, Financial Assistance Center
Open now
LoanGrantWastewater (sewer)Stormwater & flood
Next date
Mar 1, 2027 for first preference in the FY2028 plan; accepted anytime after
Funding
Affordability grant up to $2M (max 60% of request); equivalency grant; 100% emerging contaminant and regionalization grants; 0% planning and design loans up to 5 years
Who
Political subdivisions; private and nonprofit entities for stormwater and nonpoint source projects
Pays for
Wastewater and stormwater construction, planning and design.

Grant applicants need a complete facility plan and debt instrument documentation by March 1. Terms shown are from the FFY2026 plan; confirm in the current plan.

How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies.

Drinking Water SRF, incl. lead service lines

Missouri DNR, Financial Assistance Center
Open now
LoanGrantDrinking water
Next date
Mar 1, 2027 for first preference; accepted anytime after
Funding
Affordability or regional connection grant up to $2.5M (max 75%); emerging contaminant grant up to $10M; 0% lead line loans with partial grant, 100% grant for disadvantaged systems
Who
Local governments, nonprofit wholesale or regional suppliers, investor-owned utilities
Pays for
Treatment, storage, mains, lead service line replacement and related work, PFAS treatment.

Late applications are funded only if money remains, so March 1 matters.

How NEER helps: Lead service line material prediction; water system models.

GrantWastewater (sewer)Drinking water
Next date
Engineering report grants: anytime, first come. Integrated Management Plan grant: Mar 1, 2027.
Funding
Clean water report up to $50K ($62.5K disadvantaged); drinking water report up to $30K ($37.5K); integrated plan up to $80K–$100K. 20% match.
Who
Clean water report: 10,000 or fewer people. Drinking water report: 3,300 or fewer. Integrated plan: 20,000 or fewer.
Pays for
The planning study that a small community needs before it can apply for SRF construction money.

Fastest way to fund the study that unlocks a larger loan and grant.

How NEER helps: Engineering reports and integrated plans.

CDBG Water/Wastewater

Missouri Department of Economic Development
Rolling
GrantDrinking waterWastewater (sewer)
Next date
Year-round, by invitation after joint review
Funding
Up to $750K
Who
Non-entitlement cities and counties; at least 51% low-to-moderate income beneficiaries
Pays for
Construction for public drinking water and wastewater systems.

Start with a preliminary proposal and engineering report to the Missouri Water & Wastewater Review Committee.

How NEER helps: Engineering report support.

CDBG Competitive Cycle (general infrastructure)

Missouri Department of Economic Development
Next cycle
GrantStormwater & flood
Next date
FY2026 cycle closed Jul 31, 2026; next cycle expected mid-2027
Funding
CDBG construction budget up to $500K or $5,000 per benefiting household
Who
Non-entitlement cities and counties
Pays for
General infrastructure such as streets and drainage. Water and wastewater go to CDBG Water/Wastewater.

Missouri also runs CDBG Mitigation (CDBG-MIT) for disaster-affected communities.

How NEER helps: Drainage studies to define the project.

SEMA hazard mitigation intake (FMA, BRIC, HMGP)

Missouri State Emergency Management Agency
Open now
GrantStormwater & flood
Next date
FMA Notice of Interest: anytime, kept on file two years
Funding
Passes through FEMA funds
Who
Missouri jurisdictions with an adopted local hazard mitigation plan
Pays for
SEMA scores Notices of Interest, then helps selected jurisdictions build FEMA applications.

SEMA’s NOI instructions require the project to be an action item in the adopted county hazard mitigation plan. Amend the plan through your regional planning commission if needed.

How NEER helps: Hazard mitigation plan action items backed by flood models.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Missouri CWSRF FFY2026 Intended Use Plan
  21. Missouri DWSRF FFY2026 Intended Use Plan
  22. Missouri CDBG Water/Wastewater (GrantExec summary)
  23. Missouri DED CDBG Competitive Cycle
  24. SEMA Notice of Interest instructions