North Dakota DEQ, Division of Municipal Facilities, with the Public Finance Authority
Open now
LoanGrant (loan forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- 2027 project questionnaires closed Oct 30, 2026. Public hearing on the 2027 plan Jan 7, 2027. Loans go first come, first served to listed projects; others can be added by amendment.
- Funding
- 1.5% plus a 0.5% fee (2.0%) on the first $20M; the part above $20M at 75% of the market rate (4.00% in the 2026 plan). Up to 30 years after completion. The 2026 plan offered up to 75% loan forgiveness by rank; 2027 forgiveness is limited to what the FY2027 base grant requires.
- Who
- Cities, counties, townships, water resource districts, recreation service districts and other political subdivisions
- Pays for
- Wastewater treatment, sewers, I/I and CSO correction, stormwater pipes, storage and green infrastructure, street sweepers, water meters and reuse, landfill and nonpoint source work, and refinancing.
Forgiveness ranks on affordability (MHI, user charge over MHI, unemployment, population trend), water quality, compliance, readiness and green components. Readiness points come from an approved PAR grant, a facility plan or PER, and approved plans. Forgiveness plus other grants can't exceed 90% of cost. The 2027 questionnaires also feed EPA's Clean Watersheds Needs Survey.
How NEER helps: Facility plans and PERs built on calibrated sewer models; I/I and stormwater studies.
North Dakota DEQ, Division of Municipal Facilities, with the Public Finance Authority
Open now
LoanGrant (loan forgiveness)Drinking water
- Next date
- Draft 2027 plan posted Nov 13, 2026. Hearing Dec 2, 2026; written comments through Dec 18. 2027 questionnaires closed Oct 2, 2026.
- Funding
- 1.5% plus a 0.5% fee; BIL lead line work pays only the fee. The part above $20M at 75% of the market rate (4.0%). Draft 2027: lead line forgiveness up to 66% (75% combined), borrowing capped at the lesser of $3M or the listed amount; about $29.4M in lead money and $10.2M in emerging contaminant money for projects; disadvantaged forgiveness of 12 to 13% of the base grant.
- Who
- Community water systems, public and private, and nonprofit noncommunity systems. Not federal or for-profit noncommunity systems.
- Pays for
- Treatment, wells, storage, mains, consolidation, full lead service line replacement and PFAS and other emerging contaminant projects.
Disadvantaged means 5 or more of 20 affordability points (user charge over MHI, households under 200% of poverty, unemployment, education); a system can submit one census tract. BIL emerging contaminant forgiveness is fully obligated, and PFAS now scores in the general water quality category. DEQ expects more lead money in 2027 from other states' returned funds but hasn't counted it.
How NEER helps: Lead service line material prediction; water system models for master plans and PFAS alternatives.
North Dakota DEQ, Division of Municipal Facilities
Rolling
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- First come, first served. DWSRF sends applications to systems in its plans.
- Funding
- 80% of a project engineering report, up to $15,000. Drinking water also pays 100% of work to identify buried infrastructure, up to $50,000. Clean water may add approved sewer televising costs.
- Who
- Wastewater, stormwater and water systems that plan to seek an SRF loan for the study's recommendations
- Pays for
- The project-specific engineering report that makes a project ready for an SRF loan.
An approved PAR and a submitted PAR report both add readiness points on the Clean Water ranking.
How NEER helps: Engineering reports, sewer and water models, and buried infrastructure inventories.
North Dakota Department of Water Resources and State Water Commission
Rolling
GrantMatch helpDrinking waterStormwater & flood
- Next date
- Apply anytime in WebGrants (FIND). Complete applications are due 45 days before a Commission meeting: Jan 25, 2027 for Mar 11; Mar 22 for May 6; Jun 28 for Aug 12; Aug 30 for Oct 14; Oct 26 for Dec 10, 2027.
- Funding
- Rural and regional water up to 75%; municipal water supply up to 60%; flood protection, levee accreditation and water retention up to 60%; rural flood control 45% to 60%; bank stabilization and snagging up to 50%. Pre-construction at the project's rate. Main Street Initiative adds 10%, up to $250,000.
- Who
- Local sponsors such as cities, water resource districts and rural water systems
- Pays for
- Water supply expansion and improvement, regional connections, community flood protection, levee accreditation, water retention and drains. Wastewater treatment, stormwater inside city limits and meter replacement are not eligible.
Submit the project to the biennial Water Development Plan; projects left out can be held until listed ones are acted on, unless an emergency. Water supply needs a life cycle cost analysis, and flood or conveyance projects of $200,000 or more need the economic analysis worksheet. Work before approval isn't eligible. A Mar 31, 2026 study for the Commission forecasts a $1.3B shortfall over 14 years and suggests options such as 25% cost-share for replacement projects; the posted policy is still the May 2025 version.
How NEER helps: Flood risk and hydraulic models, economic analyses and water system studies for the application.
North Dakota Department of Water Resources and Garrison Diversion Conservancy District
Check agency
GrantDrinking water
- Next date
- No deadline posted. Money depends on yearly federal appropriations.
- Funding
- Up to 75% in the Commission's cost-share summary. $200M for state MR&I projects authorized in 2000.
- Who
- Municipal, rural and regional water systems
- Pays for
- New wells, pipelines, storage, treatment plants and rural or regional water systems.
Apply to DWR through WebGrants and send a copy to Garrison Diversion. Include a preliminary engineering report, the current rate schedule and other funding sought.
How NEER helps: Water system models and preliminary engineering reports.
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Not accepting applications. Check the agency.
- Funding
- 2.00% fixed, up to 30 years or the project's useful life. Up to $20M outstanding combined with the Legacy Infrastructure Loan Fund.
- Who
- Political subdivisions, the Garrison Diversion Conservancy District and the Lake Agassiz Water Authority
- Pays for
- Water and wastewater plants, sewer and water lines and lift stations, stormwater including curb and gutter, water storage, and roads and other public infrastructure.
Gap funding: applicants must try other state and federal sources first. Water projects need DWR review, and the Commission's policy requires its approval before applying to BND.
How NEER helps: Capital plans and models that size the project.
Department of Water Resources and State Water Commission, with the Bank of North Dakota
Check agency
LoanDrinking waterStormwater & flood
- Next date
- No deadline posted. Apply to DWR in WebGrants (FIND); the Commission approves.
- Funding
- Same rate as the SRFs. Term set by DWR, no longer than the project's useful life; maximum set by the Commission.
- Who
- Sponsors of water supply, flood protection and other water projects; projects not eligible for the SRFs get priority
- Pays for
- Loans for the local share of water supply, flood protection and water management projects.
Include a BND letter on debt service capacity and the project's economic impact with the request.
How NEER helps: Flood and water supply studies behind the request.
North Dakota Department of Commerce, Division of Community Services
Next cycle
GrantDrinking waterWastewater (sewer)
- Next date
- FY2026 pre-applications closed Jul 24, 2026. Next round expected late May to July 2027; dates are posted on the Commerce site.
- Funding
- $75,000 to $1M per project. The FY2026 round had about $4.0M statewide for all categories.
- Who
- Cities and counties outside the entitlement cities (Fargo, Bismarck, Grand Forks, Minot); the project area must be at least 51% low and moderate income
- Pays for
- Public facilities, with water and sewer work that threatens health and safety as the first priority.
The pre-application needs a preliminary engineering report showing rates with no, half and full CDBG funding. Income surveys were due May 7, 2026 for the last round. A committee including DEQ, the Water Commission, USDA Rural Development and BND scores applications; the average must reach 200.
How NEER helps: Preliminary engineering reports for water and sewer projects.
North Dakota Department of Emergency Services
Check agency
GrantStormwater & flood
- Next date
- No FY2026 FMA state deadline posted; check the agency. FY2024–25 BRIC applications closed Jun 12, 2026. HMGP periods are announced after a declaration that includes it.
- Funding
- Passes through FEMA funds, usually a 75% federal share
- Who
- Jurisdictions with a FEMA-approved multi-hazard mitigation plan
- Pays for
- Home acquisitions, road and bridge protection, stormwater work (culverts, diversions, flap gates, floodgates, detention basins) and mitigation planning.
OpenFEMA shows no HMGP on North Dakota's last three declarations (DR-4888, DR-4895 and DR-4934, public assistance only); DR-4852 (Oct 2024 wildfires) included it. Recent examples: an Oct 8, 2026 FEMA notice proposes BRIC money for Lincoln to replace flood-prone wastewater lagoons, and an Oct 16, 2026 notice covers a DR-4852 HMGP safe room in Lisbon.
How NEER helps: Flood models and benefit-cost inputs for mitigation applications.
Office of State Treasurer
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Formula payments, no application. Use reports for cities of 1,000 or more are due Nov 30 of even years.
- Funding
- Up to $40M per biennium to cities, by population, growth and taxable valuation
- Who
- Cities in non-oil-producing counties
- Pays for
- Capital construction of water and wastewater plants, sewer and water lines, water storage, stormwater, roads and other essential infrastructure.
Not for debt payments or routine maintenance. A late or wrong report makes the city ineligible for two years.
How NEER helps: Capital plans that show where the formula money goes.