Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Nevada water infrastructure funding

Federal, state and local grants and loans that communities in Nevada can use for drinking water, wastewater and stormwater projects.

19Grant programs
4Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 19Loans 4Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 2, 2026
    Watch
    Board for Financing Water Projects adopts the Drinking Water priority listAlso on the agenda: DWSRF and capital improvement grant projects for Gabbs, Moapa Valley, Virgin Valley and others, and a revised 2027 meeting schedule.Drinking Water SRF, incl. lead service lines and emerging contaminants
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  4. Jan 2027 (expected)estimate
    Expected
    Truckee River Fund winter cycle opensCycles open in January and June. About $400K per cycle; 25% match.Truckee River Fund grants
  5. Jan 4, 2027
    Deadline
    Nevada capital improvement grant and DWSRF applications due for the February board meetingFor the Feb 17, 2027 Board for Financing Water Projects meeting. The board reviews a revised 2027 schedule on Dec 2, 2026, so confirm.Capital Improvements Grant Program (AB 198) for water systems
  6. Jan 8, 2027
    Deadline
    Nevada FMA Notice of Interest due to NV OEMFY2026 Flood Mitigation Assistance. A Notice of Interest is required to be invited into FEMA GO.NV OEM hazard mitigation intake (FMA, BRIC, HMGP)
  7. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  8. Jan 29, 2027
    Deadline
    Nevada FMA subapplications due in FEMA GONV OEM internal deadline, 5:00 p.m. PT. OEM's web page also lists Jan 23, so submit by the earlier date.NV OEM hazard mitigation intake (FMA, BRIC, HMGP)
  9. Feb 9, 2027
    Watch
    Nevada Hazard Mitigation Working Group ranks FMA subapplicationsSubapplicants present their projects. NV OEM submits to FEMA by Feb 23, 2027.NV OEM hazard mitigation intake (FMA, BRIC, HMGP)
  10. Mid-Feb 2027 (expected)estimate
    Expected
    Nevada rural CDBG applications dueLast cycle's applications were due Feb 20, 2026. Only projects found eligible in October can apply.Rural CDBG (water, sewer and storm systems)
  11. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  12. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  13. Apr 2, 2027
    Deadline
    Nevada capital improvement grant and DWSRF applications due for the May board meetingFor the May 19, 2027 meeting. Subject to the revised 2027 schedule.Capital Improvements Grant Program (AB 198) for water systems
  14. May 5, 2027
    Watch
    Board for Financing Water Projects workshopThe May and November 2026 workshops covered the SRF priority lists and grant scale. Check the agenda when posted.Drinking Water SRF, incl. lead service lines and emerging contaminants
  15. Jun 2027 (expected)estimate
    Expected
    Clark County flood district adopts FY2028 Ten-Year Construction ProgramThe FY2027 program was adopted Jun 11, 2026.Regional Flood Control District Ten-Year Construction Program
  16. Jul 2, 2027
    Deadline
    Nevada capital improvement grant and DWSRF applications due for the August board meetingFor the Aug 17, 2027 meeting. Subject to the revised 2027 schedule.Capital Improvements Grant Program (AB 198) for water systems
  17. Early Aug 2027 (expected)estimate
    Expected
    NDEP 319(h) nonpoint source grant round opensThe 2026 round opened Aug 5, 2026 and closed in October.319(h) Nonpoint Source grants
  18. Oct 1, 2027
    Deadline
    Nevada capital improvement grant and DWSRF applications due for the November board meetingFor the Nov 17, 2027 meeting. Subject to the revised 2027 schedule.Capital Improvements Grant Program (AB 198) for water systems
  19. Mid-Oct 2027 (expected)estimate
    Expected
    Nevada rural CDBG project eligibility dueProject ideas go into ZoomGrants for eligibility review; last year's date was Oct 17. Public meetings come first.Rural CDBG (water, sewer and storm systems)

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Nevada: Apply through NV OEM. Notice of Interest due Jan 8, 2027; subapplications in FEMA GO by Jan 29, 2027. The Nevada Hazard Mitigation Working Group ranks them Feb 9, 2027, and OEM submits by Feb 23, 2027.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Nevada: FEMA's data shows no Nevada major disaster declarations since January 2024. Ask NV OEM before planning on Swift Current.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Nevada: Apply through NV OEM. FEMA's data shows no Nevada major disaster declarations since January 2024. HMGP Post-Fire was authorized with fire declarations in Washoe and Douglas counties in 2024 and 2025; the 2026 Washoe fire declarations did not include it.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Nevada: NV OEM ran the FY2024–25 round: pre-applications were due May 8, 2026, subapplications Jul 6, 2026, and the working group ranked them Jul 14, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Nevada: NDEP uses Nevada's $9.46M grant for PFAS sampling, lab capacity, training and contracted help for small and disadvantaged systems, not an open application. Ask NDEP.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In Nevada: Nevada is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

Nevada Nevada Division of Environmental Protection, Office of Financial Assistance (both SRFs, the Capital Improvements Grant Program and 319(h) nonpoint source grants, with the Board for Financing Water Projects), the Governor's Office of Economic Development (rural CDBG), the Nevada Office of Emergency Management (FMA, BRIC, HMGP), and in the Las Vegas area the Clark County Regional Flood Control District.

Clean Water SRF loans and principal forgiveness

Nevada Division of Environmental Protection, Office of Financial Assistance
Rolling
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
New projects were taken Sep 1 to Oct 9, 2026 for the list effective November 2026, which is final after public comment. Projects must be on the priority list to be funded. SFY2027 plan not posted yet; check the agency.
Funding
SFY2026 plan: $16.8M in federal grants, with $7.8M as principal forgiveness ($6.3M for communities meeting affordability criteria). Forgiveness capped at $2.5M per construction project from the base grant; no cap for emerging contaminants. Traditional loans can get up to 1.5% forgiven. Planning and design loans cover up to 80% of report costs. Rates 50% to 59% of the Bond Buyer 20 index, up to 30 years.
Who
Publicly and privately owned systems. Forgiveness needs at least 50 points on NDEP's affordability scale (income, poverty, population change, unemployment, rates).
Pays for
Wastewater treatment, sewer rehabilitation, reclaimed water, gray and green stormwater infrastructure, nonpoint source work, and planning and design that lead to a capital project.

The November 2026 draft list has 100 projects, 73 of them meeting affordability criteria. Green projects earn 5 extra points, and affordability adds 25. NDEP can bypass projects that are not ready to proceed. The fund can't pay for master plans that don't lead to a capital project.

How NEER helps: Preliminary engineering reports built on calibrated sewer and stormwater models.

Drinking Water SRF, incl. lead service lines and emerging contaminants

Nevada Division of Environmental Protection, Office of Financial Assistance, with the Board for Financing Water Projects
Rolling
LoanGrant (principal forgiveness)Drinking water
Next date
New projects were taken Sep 1 to Oct 9, 2026. The board adopts the November 2026 priority list on Dec 2, 2026 and approves loans at quarterly meetings; next application deadline Jan 4, 2027. SFY2027 plan not posted yet; check the agency.
Funding
SFY2026 plan: $37.8M in federal grants, including $14.6M in forgiveness for disadvantaged communities and $7.9M for emerging contaminants. Forgiveness caps: $2.5M per acute or chronic health project; $1.5M per system for rehabilitation ($2.5M if fully funding depreciation or consolidating); no cap for emerging contaminant construction. Nevada's $27.5M FFY2026 lead service line grant was not in the SFY2026 plan. Up to 30 years, or 40 for subsidy communities.
Who
Publicly and privately owned public water systems. Disadvantaged status needs at least 50 points on NDEP's scale; lead line and emerging contaminant projects earn 50 points toward it.
Pays for
Treatment, storage, transmission and distribution, consolidation, meters, planning, emerging contaminants such as PFAS, and full lead or galvanized service line replacement, public and private sides.

The November 2026 draft list has 200 projects; 166 are disadvantaged and 171 serve fewer than 10,000 people. Rates are 50% to 59% of the Bond Buyer 20 index. Fees are 0.5% at closing plus a yearly service fee, waived for disadvantaged communities. Nevada also uses its EC-SDC grant for PFAS sampling, lab capacity and contracted help for small systems.

How NEER helps: Lead service line material prediction; water system models for PERs and PFAS alternatives.

Capital Improvements Grant Program (AB 198) for water systems

Board for Financing Water Projects, staffed by NDEP's Office of Financial Assistance
Rolling
GrantDrinking water
Next date
Board meets quarterly. Application deadlines: Jan 4, 2027 (Feb 17 meeting), Apr 2 (May 19), Jul 2 (Aug 17) and Oct 1, 2027 (Nov 17). A revised 2027 schedule is on the Dec 2, 2026 agenda.
Funding
Grant share equals points on the board's scale, up to 85%; under 25 points gets no grant (scale effective May 20, 2026). The applicant covers the rest.
Who
Cities, counties, unincorporated towns, water authorities and conservation, irrigation and water districts whose system existed before 1995 and is public or nonprofit. Priority to systems serving fewer than 6,000 people.
Pays for
Treatment, wells, storage tanks, line replacement, dead-end connections, meters, hydrants and irrigation efficiency projects needed to meet drinking water standards. PERs, design and land can be covered as part of a funded project. Growth-only capacity is not eligible.

Get on the Drinking Water SRF priority list first, then apply in NIFS; the board approves a Letter of Intent before the full grant. Points reward asset management plans, an adopted sufficient rate and small size, and are cut when a capital replacement fund isn't committed or vacation homes are over 30% of connections. Often paired with a DWSRF loan.

How NEER helps: Preliminary engineering reports and water system models for asset management plans.

Rural CDBG (water, sewer and storm systems)

Governor's Office of Economic Development, Rural Community Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Project eligibility for the current cycle was due in mid-October 2026. Applications expected mid-February 2027, with awards starting Jul 1, 2027. Next eligibility round expected mid-October 2027.
Funding
No set minimum or maximum. The state's yearly HUD allocation has been about $2.8M. 2026 awards: $3.1M to 7 projects, incl. $603,750 for Ely's wastewater plant, $750,000 for Fallon's Serpa lift station, $500,000 for Lovelock sewers and $513,120 for the Tuscarora water tank.
Who
The 26 eligible rural cities and counties (non-entitlement). Water and sewer projects need at least 51% low- and moderate-income benefit.
Pays for
Water supply and distribution, sanitary sewer upgrades, water treatment, storm systems, and water and sewer feasibility studies.

It takes a year: three public meetings, eligibility in ZoomGrants by mid-October, then the application by mid-February. Grant administrators and recipients must attend GOED's application training. Planning grants should lead to a project.

How NEER helps: Water and sewer feasibility studies that support the application.

319(h) Nonpoint Source grants

NDEP, Bureau of Water Quality Planning
Next cycle
GrantStormwater & flood
Next date
2026 round closed in October 2026. Next round expected around August 2027.
Funding
2026 round: up to $900K total, from about $25K to $500K per project. Watershed-based plans up to $80K. Implementation projects need a 50% non-federal match.
Who
Federal, state, local and tribal governments, public agencies, nonprofits and public schools
Pays for
Projects that cut nonpoint source pollution and lead toward removing waters from the impaired list, plus watershed-based plans.

The 2026 notice gives both Oct 9 and Oct 16 as the deadline. Ask NDEP early if your implementation request is over $200K to $300K.

How NEER helps: Watershed and stormwater models for watershed-based plans and load reductions.

NV OEM hazard mitigation intake (FMA, BRIC, HMGP)

Nevada Office of Emergency Management / Homeland Security, with the Nevada Hazard Mitigation Working Group
Open now
GrantStormwater & flood
Next date
FY2026 FMA: Notice of Interest due Jan 8, 2027; subapplications due in FEMA GO Jan 29, 2027 (OEM's web page also shows Jan 23)
Funding
Passes through FEMA funds. FY2026 FMA: localized flood risk reduction projects up to $25M federal; project scoping up to $500K.
Who
Nevada local governments and tribes that participate in the NFIP and have a FEMA-approved hazard mitigation plan
Pays for
OEM reviews Notices of Interest, invites viable projects to build subapplications in FEMA GO, and the working group ranks them before OEM submits to FEMA.

Subapplicants present their projects to the working group, which ranked FMA on Feb 9, 2027 per OEM's schedule. FEMA now favors FMA projects with a benefit-cost ratio of 4.0 or more. For BRIC FY2024–25, OEM took pre-applications by May 8, 2026 and the group ranked them on Jul 14, 2026; TRFMA's Vista Narrows project went to the national competition. FEMA's data shows no Nevada major disaster declarations since January 2024, so HMGP has come only as post-fire funds after fire declarations in Washoe and Douglas counties in 2024 and 2025. Several county plans (Elko; Humboldt, Pershing and Lander) expire in October 2026.

How NEER helps: Benefit-cost analysis and flood models for FMA and BRIC project scoping.

Local and regional County and regional cost-share programs.

Regional Flood Control District Ten-Year Construction Program

Clark County Regional Flood Control District
Check agency
GrantStormwater & flood
Next date
FY2027 to FY2036 program adopted Jun 11, 2026. Next update expected June 2027.
Funding
About $1.07B over ten years from a quarter-cent sales tax and planned bonds. FY2026–27 capital budget $500.1M. Local Drainage Program: $3.28M for FY2027.
Who
Clark County and its cities, as lead entities for Master Plan facilities in their hydrographic areas
Pays for
Design and construction of regional detention basins, channels and storm drains in the adopted flood control Master Plans; local drainage projects under a separate program.

Projects must be in the Master Plan and on the program; lead entities score their own projects. Entity Advance Funding lets a city or county build early and be repaid, up to a $40M cap, for projects in the first three years of the program. No local drainage requests were made in FY2026.

How NEER helps: Master plan hydrology and storm drain models for project design.

Regional Flood Control District Maintenance Work Program

Clark County Regional Flood Control District
Check agency
GrantStormwater & flood
Next date
Set yearly with the district budget
Funding
FY2027 approved budget $23M; about $245.9M projected over ten years
Who
Clark County and its cities that maintain Master Plan flood control facilities
Pays for
Inspection and maintenance of about 722 miles of channels and storm drains and 113 detention basins.

Work must follow the district's Operations and Maintenance Manual.

How NEER helps: Condition and capacity analysis of drainage facilities.

Truckee River Fund grants

Truckee Meadows Water Authority, through the Community Foundation of Northern Nevada
Opening soon
GrantStormwater & floodDrinking water
Next date
Cycles open in January and June. Last RFP was due Jul 24, 2026. Next expected to open January 2027.
Funding
About $400K per cycle; grants usually $5K to $100K. 25% match (cash below the Vista gage).
Who
Governmental entities, 501(c)(3) nonprofits and nonprofit schools
Pays for
Projects that protect Truckee River water quality, including local stormwater improvements, creek rehabilitation and erosion control.

Stormwater projects near TMWA's water intakes and canals get priority. Projects must start within 180 days of award, and grants pay on reimbursement.

How NEER helps: Stormwater models that show the water quality benefit.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. NDEP: State Revolving Loan Fund (IUPs, priority lists, NIFS pre-applications)
  23. Nevada CWSRF Intended Use Plan SFY2026
  24. NDEP: State Revolving Fund Priority List is Open (Sep 1 to Oct 9, 2026)
  25. NDEP: CWSRF and DWSRF Priority List Public Workshop, Nov 10, 2026 (slides)
  26. Nevada DWSRF Intended Use Plan SFY2026
  27. NDEP: Board for Financing Water Projects meeting agendas, minutes and application deadlines
  28. NDEP: Emerging Contaminants in Small or Disadvantaged Communities Grant workplan, years 1 to 3 (Jul 15, 2025)
  29. NDEP: Grants (Capital Improvements Grant Program)
  30. NDEP: Grants Program Legislative History
  31. NDEP: Capital Improvement Grant Program grant amount eligibility workshop, May 12, 2026
  32. Board for Financing Water Projects agenda, Dec 2, 2026
  33. GOED: Community Development Block Grant (CDBG)
  34. GOED: CDBG 2026 Application Handbook
  35. GOED: CDBG Method of Distribution, 2026 program year
  36. GOED press release: Governor Lombardo announces $3 million for rural community development (Jul 9, 2026)
  37. NDEP: 319(h) 2026 Grant Funding Opportunity
  38. Nevada OEM: Flood Mitigation Assistance (FMA) resources and key dates
  39. Nevada OEM: FMA 26 Kickoff slides
  40. Nevada OEM: BRIC FY2024 and FY2025 resources and key dates
  41. Nevada Hazard Mitigation Working Group draft minutes, May 5, 2026
  42. TRFMA: Vista Narrows Construction BRIC national competition presentation to the NHMWG, Jul 14, 2026
  43. OpenFEMA: Disaster Declarations Summaries, Nevada, since Jan 1, 2024 (secondary data source)
  44. Clark County Regional Flood Control District: Ten-Year Construction Program FY2027 through FY2036 (adopted Jun 11, 2026)
  45. Community Foundation of Northern Nevada: Partnership grants (Truckee River Fund)
  46. Truckee River Fund Spring 2026 application and grant priorities