Pennsylvania Infrastructure Investment Authority (PENNVEST) with DEP
Open now
LoanGrant (principal forgiveness and grants by affordability)Wastewater (sewer)Stormwater & flood
- Next date
- Feb 3, 2027 application cut-off for the Apr 21, 2027 board meeting; next cut-off May 5, 2027 (board date not set)
- Funding
- Loans at county cap rates, 1% minimum. Standard term 20 years, up to 30 (40 for some start-up systems). Caps: $11M for one municipality, $20M for two or three, more with board approval. At least 20% of the FFY2026 base grant goes out as additional subsidy.
- Who
- Public or private entities with eligible water quality projects
- Pays for
- Wastewater treatment and collection, and stormwater: new or upgraded storm sewers, separating storm from sanitary sewers, detention basins, and other work to manage, reduce, treat or recapture stormwater.
Grants and principal forgiveness go where the resulting user rate would exceed PENNVEST's affordable target (0.5%–1.25% of adjusted MHI), are prorated across projects at each meeting, and aren't given if they'd cut the annual rate by less than $15. For stormwater, PENNVEST assumes a community can afford 0.25% of MHI for debt service. Talk to a regional project specialist before applying.
How NEER helps: Calibrated sewer and stormwater models for the project's design basis; I/I and capacity studies.
Pennsylvania Infrastructure Investment Authority (PENNVEST) with DEP
Open now
LoanGrant (principal forgiveness and grants by affordability)Drinking water
- Next date
- Feb 3, 2027 application cut-off for the Apr 21, 2027 board meeting; next cut-off May 5, 2027 (board date not set)
- Funding
- FFY2026 grants in the draft plan: $12.7M base, $82.1M general supplemental, $225.3M lead service line and $25.2M emerging contaminants. Planned additional subsidy: 49% of general supplemental and lead line funds, 100% of emerging contaminant funds. Loans at county cap rates, 1% minimum; same project caps as clean water.
- Who
- Public or private water systems; the applicant must hold the water supply permit
- Pays for
- Treatment, storage and distribution; replacing lead and galvanized service lines and lead goosenecks and connectors; PFAS treatment such as activated carbon, ion exchange and reverse osmosis.
For lead line projects in mapped high-need areas, or where a system reaches the lead action level, PENNVEST can judge affordability on that neighborhood's rates instead of the whole system's, so large systems can get subsidy. The FFY2026 drinking water plan was still a draft when checked. EPA also announced $39.25M in EC-SDC grants for Pennsylvania in May 2026; no state application process was found, so check DEP.
How NEER helps: Lead service line material prediction; water system models for treatment and main replacement planning.
Pennsylvania Infrastructure Investment Authority (PENNVEST)
Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Anytime; staff aim to decide within two weeks
- Funding
- Up to $500K including contingency; total project cost no more than $1M. Loans only, at county cap rates; interest-only up to 3 years, then 20 years.
- Who
- Public or private entities with projects serving 12,000 people or fewer or no more than 1,000 hookups, or agricultural operations
- Pays for
- Small eligible PENNVEST projects reviewed by staff instead of the board.
No grants or principal forgiveness. Permits must be in hand when you apply.
How NEER helps: Quick engineering support for small system fixes.
Pennsylvania Infrastructure Investment Authority (PENNVEST)
Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Apply anytime through the PV Portal
- Funding
- Check the agency; the page gives no amounts or terms
- Who
- Municipal start-up systems with no user rate, municipal systems denied interim financing by local lenders, and disadvantaged or Environmental Justice Area communities
- Pays for
- Design, engineering, permits and environmental review to make a project construction ready.
PENNVEST recommends talking to a project specialist before starting the application.
How NEER helps: Design-phase modeling and alternatives analysis.
Commonwealth Financing Authority (DCED)
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Listed as closed on the CFA application schedule; no new round posted. Check the agency.
- Funding
- $500K to $20M per project; multi-year grants up to six years
- Who
- Municipalities and municipal authorities
- Pays for
- Construction of drinking water, sanitary sewer and storm sewer projects. Separate H2O PA tracks cover flood control and high hazard unsafe dams.
How NEER helps: Engineering reports and models that define the project.
Commonwealth Financing Authority (DCED)
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Listed as closed on the CFA application schedule; no new round posted. Check the agency.
- Funding
- Projects costing $30K to $500K
- Who
- Municipalities and municipal authorities
- Pays for
- Construction, improvement, expansion, rehabilitation or repair of water supply, sanitary sewer, storm sewer and flood control projects.
The last awards were Jan 21, 2026: $110M for 445 small water, sewer, stormwater and flood control projects.
How NEER helps: Small system studies and cost estimates for the application.
Commonwealth Financing Authority (DCED)
Opening soon
GrantStormwater & flood
- Next date
- Applications accepted Feb 1–May 31 each year; next window Feb 1–May 31, 2027
- Funding
- Up to $500K per project; 15% match of total project cost
- Who
- Municipalities, councils of governments, authorized organizations, universities, watershed organizations and for-profit businesses
- Pays for
- Flood mitigation projects authorized by a flood protection authority, DEP, the Army Corps or NRCS, or identified by a local government.
How NEER helps: Flood models and alternatives analysis to define and justify the project.
Commonwealth Financing Authority (DCED)
Opening soon
GrantWastewater (sewer)
- Next date
- Applications accepted Feb 1–May 31 each year; next window Feb 1–May 31, 2027
- Funding
- Up to $100K; 50% match of total project cost
- Who
- Municipalities, councils of governments, authorized organizations, universities, watershed organizations and for-profit businesses
- Pays for
- Planning work required under the Pennsylvania Sewage Facilities Act (Act 537).
An Act 537 plan is often the first step before a PENNVEST sewer application.
How NEER helps: Act 537 plan support with sewer capacity models.
Commonwealth Financing Authority (DCED)
Opening soon
GrantStormwater & flood
- Next date
- Applications accepted Feb 1–May 31 each year; next window Feb 1–May 31, 2027
- Funding
- Up to $300K per project; 15% match of total project cost
- Who
- Municipalities, councils of governments, authorized organizations, universities, watershed organizations and for-profit businesses
- Pays for
- Building, repairing, maintaining or rehabilitating best management practices that reduce nonpoint source runoff in impaired streams.
How NEER helps: Runoff and load modeling to site and size BMPs.
Pennsylvania Department of Environmental Protection
Next cycle
GrantStormwater & flood
- Next date
- 2026 round ran Apr 22–Jun 22, 2026. Next round expected about the same window in 2027.
- Funding
- Check the agency; amounts are in the yearly program guidance
- Who
- Past awards went to conservation districts, counties, townships, boroughs, authorities and watershed nonprofits
- Pays for
- Three grants in one application round: Growing Greener Watershed Restoration and Protection (nonpoint source work in impaired watersheds, including stormwater BMPs and stream and floodplain restoration), Act 167 stormwater management planning (Phase 1 scoping, Phase 2 plans), and SMCRA bond forfeiture for mine drainage.
Apply through the Commonwealth's eGrants system. The DEP page doesn't name MS4 projects as a category; check the guidance for MS4 pollutant reduction work.
How NEER helps: Act 167 watershed stormwater models; BMP siting and load reduction estimates.
Pennsylvania Department of Community and Economic Development (DCED)
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Set by each county for the entitlement share; in 2026 one county took local applications by Jul 31 and sent its application to DCED by Oct 30, with awards in spring 2027
- Funding
- Entitlement amounts by Act 179 formula. Competitive: $100K minimum, no ceiling.
- Who
- Entitlement: designated counties and municipalities. Competitive: municipalities that don't get CDBG directly from HUD (excluding Act 179 entitlement municipalities under 10,000 people).
- Pays for
- Infrastructure that mainly benefits low- and moderate-income residents, including water mains, sewer lining and treatment plant upgrades.
Small towns usually apply through their county, which sets its own deadline. June 2026 awards included water and sewer work in six counties.
How NEER helps: Engineering studies that define the project and its service area.
Pennsylvania Emergency Management Agency, State Hazard Mitigation Office
Check agency
GrantStormwater & flood
- Next date
- Letter of Interest anytime, kept on an annual list. No FY2026 FMA intake posted when checked; FEMA's deadline is Feb 26, 2027.
- Funding
- Passes through FEMA funds
- Who
- Local governments and other eligible organizations with a FEMA-approved hazard mitigation plan; FMA also needs good standing in the NFIP
- Pays for
- PEMA takes Letters of Interest, approves sub-applicants, and submits their FEMA GO applications. Only the Commonwealth applies to FEMA.
For the FY2024 FMA round PEMA took LOIs until Jun 19, 2026 and applications until Jul 17, 2026, and required projects to be in the county plan by then. BRIC LOIs closed Apr 24, 2026. Pennsylvania's only major disaster declaration since 2024 is DR-4815 (Tropical Storm Debby, Sep 11, 2024), with hazard mitigation in 13 counties. Email RA-Shazmitoff@pa.gov.
How NEER helps: Flood modeling and benefit-cost analysis for FEMA applications.
Pennsylvania Emergency Management Agency
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Activated per event. Damage reports are due within days of the disaster, so contact PEMA as soon as one happens.
- Funding
- Up to $5M per local government, subject to State Disaster Assistance Fund money; paid as reimbursement
- Who
- Municipal governments in counties that meet activation thresholds, with an adopted county hazard mitigation plan, NFIP compliance and a local disaster declaration within 5 days
- Pays for
- State-funded repair of disaster damage not covered by insurance or FEMA, including stormwater systems, pump stations, drainage channels, and water and wastewater utilities.
A new pilot, first activated in November 2026 for the Sep 2–3 storms in Erie County; Philadelphia was expected to follow. Windshield surveys are due within 4 days after the disaster period and initial damage assessments within 21 days.
How NEER helps: Damage documentation and drainage assessments after a storm.