Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

South Dakota water infrastructure funding

Federal, state and local grants and loans that communities in South Dakota can use for drinking water, wastewater and stormwater projects.

19Grant programs
5Loan programs
15Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 19Loans 5Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 8, 2026
    Watch
    West Dakota Water Development District board meetingRapid City, 3 p.m. Grant requests for later meetings are due 15 days before each meeting.West Dakota Water Development District grants
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  4. Jan 1, 2027
    Deadline
    South Dakota water and wastewater funding applications dueQuarterly DANR deadline for Clean Water SRF, Drinking Water SRF and CWFCP applications. Projects must be on the State Water Facilities Plan.Clean Water SRF loans and principal forgiveness
  5. Jan 7, 2027
    Watch
    Board of Water and Natural Resources meetingFirst board meeting of 2027. The board also reviews FY2027 Section 319 proposals in January.Consolidated Water Facilities Construction Program (CWFCP)
  6. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  7. Feb 1, 2027
    Deadline
    State Water Plan amendment applications dueAmendments add a project to the State Water Facilities Plan between annual cycles. Board reviews them in March.Consolidated Water Facilities Construction Program (CWFCP)
  8. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  9. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  10. Apr 1, 2027
    Deadline
    South Dakota water and wastewater funding applications dueQuarterly DANR deadline for Clean Water SRF, Drinking Water SRF and CWFCP applications.Drinking Water SRF, incl. lead service lines and emerging contaminants
  11. Apr 1, 2027estimate
    Expected
    South Dakota CDBG spring roundGOED lists Apr 1 and Oct 1 rounds. Up to $2M per grant; the planning district prepares the application.CDBG Community Projects
  12. May 1, 2027
    Deadline
    State Water Plan amendment applications dueBoard reviews amendments in June.Consolidated Water Facilities Construction Program (CWFCP)
  13. Jul 1, 2027
    Deadline
    South Dakota water and wastewater funding applications dueQuarterly DANR deadline for Clean Water SRF, Drinking Water SRF and CWFCP applications.Clean Water SRF loans and principal forgiveness
  14. Aug 1, 2027
    Deadline
    State Water Plan amendment applications dueBoard reviews amendments in September.Consolidated Water Facilities Construction Program (CWFCP)
  15. Oct 1, 2027
    Deadline
    South Dakota 2028 State Water Plan applications and quarterly funding applications dueAnnual State Water Plan applications go to the board in November. The quarterly SRF and CWFCP deadline falls the same day.Consolidated Water Facilities Construction Program (CWFCP)
  16. Oct 1, 2027estimate
    Expected
    South Dakota Section 319 applicationsBased on the FY2027 cycle, which closed Oct 1, 2026.Section 319 nonpoint source grants
  17. Oct 1, 2027estimate
    Expected
    South Dakota CDBG fall roundGOED rolls unused set-aside money into the Oct 1 round.CDBG Community Projects

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In South Dakota: Apply through the South Dakota Office of Emergency Management (OEM). No FY2026 FMA intake date was confirmed when checked; ask OEM's mitigation staff, since its deadline will come before FEMA's Feb 26, 2027 deadline.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In South Dakota: DR-4807 (June 16 to July 8, 2024 storms and flooding, declared Aug 15, 2024, 25 counties) included HMGP. For DR-4903 (December 2025 windstorm in Custer, Fall River and Pennington counties, declared Apr 7, 2026), FEMA listed HMGP as under review. DR-4938 (June 28 to July 3, 2026 storms, declared Sep 1, 2026) is Public Assistance only. Ask OEM whether HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In South Dakota: OEM is the state applicant for BRIC in South Dakota.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In South Dakota: The Board of Water and Natural Resources awards EC-SDC money as 100% grants. In 2026 it awarded $16.5M to Clay Rural Water System for Elk Point (manganese) and $7.6M to Sioux Falls, and it recommended $17.3M in spending authority for the 2025 and 2026 allotments.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

In South Dakota: The Board of Water and Natural Resources aims to keep SRF rates between USDA Rural Development's market and intermediate rates, so compare both offers.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In South Dakota: South Dakota is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

South Dakota DANR runs the Clean Water and Drinking Water SRFs, the Consolidated Water Facilities Construction Program, planning grants and Section 319 for the Board of Water and Natural Resources; GOED runs CDBG and CDBG-DR; the Office of Emergency Management (OEM) runs hazard mitigation.

Clean Water SRF loans and principal forgiveness

South Dakota DANR, for the Board of Water and Natural Resources
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Quarterly: applications postmarked or received by Jan 1, Apr 1, Jul 1 and Oct 1. The project must already be on the State Water Facilities Plan.
Funding
Loans up to 100% of project cost. Rates for loans awarded after Oct 1, 2026: 4.00% up to 10 years, 4.25% up to 20, 4.50% up to 30; 0.25% less for BABA projects; nonpoint source incentive 3.50%–4.00%; interim financing 2.50% up to 5 years. The FFY2027 plan lists about $1.1M in potential principal forgiveness.
Who
Municipalities, sanitary and other special purpose districts, counties, townships, state agencies and tribes
Pays for
Wastewater treatment, interceptors and collectors, I/I correction, sewer rehabilitation, new storm sewers, nonpoint source projects and eligible refinancing.

Principal forgiveness goes only to applicants that score at least 5 affordability points (5 points if MHI is at or below 95% of the state MHI) and charge at least $45 a month for 5,000 gallons ($70 for other applicants). The board adopted the FFY2027 plan on Nov 5, 2026. Its federal grant is estimated at $5M, against $3.5M base plus $12.1M IIJA in FFY2026.

How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies.

Drinking Water SRF, incl. lead service lines and emerging contaminants

South Dakota DANR, for the Board of Water and Natural Resources
Open now
LoanGrant (principal forgiveness)Drinking water
Next date
Quarterly: applications postmarked or received by Jan 1, Apr 1, Jul 1 and Oct 1. The project must already be on the State Water Facilities Plan.
Funding
Public entity rates for loans awarded after Oct 1, 2026: 4.00%–4.50% by term, as low as 3.00% for disadvantaged communities, 0.25% less for BABA projects; lead service line loans at 0%. The FFY2027 plan lists about $16.4M in disadvantaged principal forgiveness and $756K for others.
Who
Public water systems owned by municipalities, districts, counties, townships, tribes and nonprofit corporations (nonprofits pay 1% more)
Pays for
Wells, treatment, storage, mains, consolidation, lead service line replacement and emerging contaminant projects such as PFAS or manganese.

Disadvantaged means MHI below the state MHI and a water bill of at least $45 a month for 5,000 gallons ($70 for 7,000 gallons for rural systems). Remaining IIJA lead line and emerging contaminant money is in the FFY2027 plan: Aberdeen's $16.5M lead line loan shows $8.1M forgiven, and two emerging contaminant projects show 100% forgiveness.

How NEER helps: Lead service line material prediction; water system models.

Consolidated Water Facilities Construction Program (CWFCP)

South Dakota DANR, for the Board of Water and Natural Resources
Open now
GrantLoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Quarterly: Jan 1, Apr 1, Jul 1 and Oct 1. State Water Plan placement first: annual applications Oct 1; amendments Feb 1, May 1 and Aug 1.
Funding
Set each year by the Legislature from the Water and Environment Fund: $11.4M in 2026, and the board asked for $13M for state FY2028. 2026 grants ran from $200K to $2M. Loans at 4.00%–4.50% after Oct 1, 2026.
Who
Municipalities, counties, townships, special purpose districts, state agencies, tribes and nonprofit corporations
Pays for
Grants and loans for drinking water, wastewater, storm sewer and watershed projects on the State Water Facilities Plan. Projects of $250K or less use the Small Water Facilities application.

To be presented to the board, municipalities and sanitary districts need rates of at least $30 per 5,000 gallons for water and $30 for wastewater. Expect part of the package as an SRF loan, with SRF requirements. Projects placed on the plan on Nov 5, 2026 stay on it through December 2028.

How NEER helps: Preliminary engineering reports and system models for the application.

Rolling
GrantDrinking waterWastewater (sewer)
Next date
Anytime; first come, first served
Funding
80% of the study cost, up to $8K for water and $10K for wastewater. Paid after the report is done.
Who
Systems serving 2,500 people or fewer whose project is not yet on the State Water Plan
Pays for
The engineering study or facilities plan a small system needs before applying for construction money.

The 20% local share must be cash or other non-state grants; in-kind does not count. A South Dakota licensed engineer must write the report.

How NEER helps: Engineering reports and facilities plans.

Section 319 nonpoint source grants

South Dakota DANR, Watershed Protection Program
Next cycle
GrantStormwater & flood
Next date
FY2027 applications closed Oct 1, 2026; board review January 2027. Next round expected Oct 1, 2027.
Funding
Check the agency
Who
Conservation districts, water development districts, counties, municipalities, universities, some nonprofits and tribes
Pays for
Watershed planning and implementation, ground water, and education projects that control nonpoint source pollution.

Priority goes to projects that implement TMDLs and include EPA's nine key elements. MS4 permit activities are not eligible.

How NEER helps: Watershed models and load reduction estimates.

CDBG Community Projects

South Dakota Governor's Office of Economic Development (GOED)
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Funding rounds Apr 1 and Oct 1; next expected Apr 1, 2027. Urgent need requests accepted until funds run out.
Funding
Up to $2M per grant plus $20K for administration
Who
Counties and incorporated cities other than Sioux Falls and Rapid City; they can apply for rural water systems and sanitary districts
Pays for
Mostly water, wastewater and storm sewer projects, including street repair over replaced lines.

Your planning district prepares the application. Hold the public hearing first and have the environmental review nearly done. GOED's page lists both Apr 1 and Oct 1 but also says Oct 1 only, so confirm with your planning district.

How NEER helps: Engineering report and drainage study support.

CDBG-DR Local Infrastructure Recovery and Resiliency (2024 flood, Union County)

South Dakota Governor's Office of Economic Development (GOED)
Check agency
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
One competitive round planned after GOED publishes a notice of funding availability. Check the agency.
Funding
$14.1M of the state's $15.4M HUD allocation for DR-4807; GOED expects 2 to 5 projects
Who
Local governments and school districts in ZIP codes 57038 and 57049 in Union County, around North Sioux City
Pays for
Repair and hardening of stormwater, water and wastewater systems, lift stations and other public infrastructure tied to the June 2024 flood, with mitigation in every design.

At least 70% of the money must benefit low- and moderate-income residents. Scoring favors ready projects with completed design and permits.

How NEER helps: Flood and stormwater models to define the mitigation component.

OEM hazard mitigation intake (FMA, HMGP, BRIC)

South Dakota Office of Emergency Management, Department of Public Safety
Check agency
GrantStormwater & flood
Next date
No FY2026 FMA intake date confirmed. Ask OEM before FEMA's Feb 26, 2027 deadline.
Funding
Passes through FEMA funds
Who
South Dakota local governments and tribes with a FEMA-approved hazard mitigation plan
Pays for
OEM is the state applicant for FEMA's FMA, BRIC and post-disaster HMGP money.

DR-4807 (June 2024 storms and flooding) included HMGP. For DR-4903 (December 2025 windstorm) FEMA lists HMGP as under review, and DR-4938 (summer 2026 storms) was declared for Public Assistance only. OEM's web pages moved to sd.gov and could not be read when checked.

How NEER helps: Flood modeling and benefit-cost analysis.

Local and regional County and regional cost-share programs.

West Dakota Water Development District grants

West Dakota Water Development District
Rolling
GrantMatch helpDrinking waterStormwater & flood
Next date
Requests due 15 days before a board meeting. Next meeting Dec 8, 2026.
Funding
Case by case; recent awards ran from $18.5K to $231K
Who
Entities with water projects inside the district
Pays for
Water conservation, water management and water quality projects, including erosion control and matching money for state and federal grants.

Keep the proposal to 3 pages. Larger requests need votes at two meetings, and the board has said it does not fund planning grants. The district has paid for Rapid Creek 319 project plans.

How NEER helps: Watershed and stormwater models for Rapid Creek projects.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. DANR: Sanitary and storm sewer funding
  23. Board of Water and Natural Resources: draft minutes, Nov 5, 2026 (interest rates, FFY2027 IUPs, 2027 State Water Plan, omnibus bill)
  24. Board of Water and Natural Resources: Nov 5, 2026 board packet (draft FFY2027 CW and DW IUPs, draft 2026 annual report)
  25. DANR: South Dakota Clean Water SRF FFY2026 Intended Use Plan, Amendment 3 (Jun 25, 2026)
  26. DANR: Drinking water funding
  27. DANR: South Dakota Drinking Water SRF FFY2026 Intended Use Plan, Amendment 3 (Jun 25, 2026)
  28. DANR: Consolidated Water Facilities Construction Program
  29. DANR: State Water Plan
  30. DANR: Small Community Planning Grant
  31. DANR: FY2027 Section 319 Project Guidance and Application Requirements
  32. GOED: Community Development Block Grants
  33. South Dakota 2025 Annual Action Plan (CDBG method of distribution)
  34. GOED: CDBG Disaster Relief funds (DR-4807)
  35. GOED: CDBG-DR Action Plan for the 2024 disaster, approved by HUD
  36. OpenFEMA: South Dakota disaster declarations since 2024
  37. FEMA: South Dakota Severe Storms, Straight-line Winds, and Flooding (DR-4807)
  38. FEMA: DR-4903 South Dakota declaration map, as of Apr 7, 2026
  39. SBA notice in the Federal Register: South Dakota major disaster for Public Assistance only (DR-4938)
  40. West Dakota Water Development District: About us
  41. West Dakota Water Development District: Grant proposal guidelines
  42. West Dakota Water Development District: draft minutes, Oct 13, 2026
  43. West Dakota Water Development District: home page (next meeting)