Utah Water Quality Board, through the DEQ Division of Water Quality
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Second-round applications due Dec 31, 2026 (the Board may cancel the round if the first round used all funds). First round each year closes Jun 30.
- Funding
- FY25 federal awards: base $8.36M, general supplemental $12.98M (49%, or $6.36M, as principal forgiveness) and $1.12M for emerging contaminants. Interest starts from the 20-year market rate, cut by up to 100% for high financial burden. Extended terms to 30 years in hardship cases.
- Who
- Municipalities and other political subdivisions; nonpoint source and stormwater projects are also eligible
- Pays for
- Wastewater treatment, collection systems, municipal stormwater, decentralized systems and nonpoint source projects. The state-funded Utah Wastewater Loan Fund makes similar loans and interest buydowns.
All principal forgiveness currently goes to disadvantaged communities: the average yearly sewer bill must exceed 1.4% of the local modified MAGI. Applications made by Dec 31 go on the PPL Jan 31, are introduced at the February Water Quality Board meeting and authorized in April. Planning and design advances use the Google forms on the program page.
How NEER helps: Facility plans and capacity studies built on calibrated sewer models; I/I and stormwater studies.
Utah Water Quality Board, through the DEQ Division of Water Quality
Open now
Grant (hardship grants; advances repaid at loan closing)LoanWastewater (sewer)Stormwater & flood
- Next date
- Follows the SRF rounds: next applications due Dec 31, 2026
- Funding
- FY25 examples: planning advances $29,800 to $102,900, design advances $15,000 to $300,000, hardship construction grants $27,172 to $281,000
- Who
- Political subdivisions that can't get enough loan money because of financial hardship
- Pays for
- Planning and design advances or grants, hardship construction grants, and nonpoint source, water quality study and outreach grants.
The Board may consider a hardship construction grant when the yearly sewer bill would exceed 1.4% of local MAGI. Advances are repaid once a construction loan closes, so they fit a project headed for the SRF.
How NEER helps: Planning studies and preliminary design that support the advance request.
Utah Water Quality Board, through the DEQ Division of Water Quality
Next cycle
Grant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Last posted window ran Jan 27 to May 2, 2025. No later round posted; check the agency.
- Funding
- About $1.6M from two fiscal years, all as principal forgiveness. No match required.
- Who
- Municipalities and municipal entities
- Pays for
- Capital projects that address emerging contaminants such as PFAS, including septic-to-sewer conversions. Studies must lead to a construction project; no O&M.
Projects must start within 18 months of award and be substantially done within 3 years. Priority goes to projects with a clear water quality benefit, public health protection or financial hardship.
How NEER helps: Treatment alternatives and sewer extension models for septic-to-sewer projects.
DEQ Division of Water Quality
Opening soon
GrantStormwater & flood
- Next date
- State NPS applications January to March (expected Jan to Mar 2027), selected in April, funded in July. Federal 319(h) applications September to November.
- Funding
- State NPS: about $1M a year, $150,000 per project, 10% match recommended. 319(h): $900K to $1M a year, no per-project limit, 40% nonfederal match.
- Who
- Sponsors of voluntary nonpoint source projects; 319(h) projects must carry out an accepted 9-element watershed plan
- Pays for
- Low-impact development (bioretention, rain gardens, permeable pavement) outside stormwater permits, stormwater basin retrofits, stream and floodplain restoration, watershed plans and hardship septic repairs.
State NPS money comes from the Water Quality Board's Hardship Grant Fund. Projects in NPS priority areas, on impaired waters or carrying out a TMDL or watershed plan score higher.
How NEER helps: Green infrastructure sizing and watershed models for 9-element plans.
Utah Drinking Water Board, through the DEQ Division of Drinking Water
Open now
LoanGrant (grants and principal forgiveness for disadvantaged systems)Drinking water
- Next date
- Board meetings in 2027: Jan 5, Feb 25, Apr 27, Jun 29, Aug 31, Oct 5, Nov 9. The Nov 17, 2026 cut-off for the Jan 5 meeting has passed; 2027 cut-off dates aren't posted.
- Funding
- 2025 federal grants: base $10.9M, supplemental $24.9M, lead service line $28.65M, emerging contaminants $7.64M. Loans typically below market, 20 to 40 years. 1% origination fee, waived for subsidized disadvantaged communities.
- Who
- Federal SRF: public and private community water systems and nonprofit non-community systems. State SRF: political subdivisions only.
- Pays for
- Drinking water treatment, sources, storage and distribution, plus related planning and engineering.
Grants or principal forgiveness need an average water bill above 1.75% of local MAGI, or local MAGI at or below 80% of the state MAGI ($60,000 in 2023). The Board's moratorium on new applications ran Nov 1, 2025 to Aug 25, 2026; FY27 applications were due by Sep 15, 2026. Incomplete applications aren't reviewed, and capacity assessment worksheets are required.
How NEER helps: Water system models and master plans that define the project.
DEQ Division of Drinking Water
Rolling
LoanGrant (grants for systems meeting hardship criteria; 49% of federal lead funds as subsidy)Drinking water
- Next date
- Expedited funding uses an open-enrollment form. Larger requests go through the SRF and its Board cut-offs.
- Funding
- Expedited: up to $100,000 as 0% loans, or grants for hardship systems. SRF awards have ranged from $100,000 to $27M, 20 to 39 years.
- Who
- Community water systems. The small system contractor assistance program serves systems under 10,000 people.
- Pays for
- Service line inventories, field verification and full lead service line replacement.
Lead lines must be fully replaced; replacing only the lead portion isn't allowed. Small systems can get no-cost inventory and replacement plan help through Sunrise Engineering, but systems that used it or got expedited funding can't apply for more expedited money.
How NEER helps: Service line material prediction to target field verification.
Utah Drinking Water Board, through the DEQ Division of Drinking Water
Rolling
Grant (forgivable loans)Drinking water
- Next date
- Applied for through the SRF application; the 2025-26 moratorium did not apply to these projects
- Funding
- Utah expects $7.5M or more a year in emerging contaminant funds, all as forgivable loans. $6.7M in new EC projects approved in SFY25.
- Who
- Public water systems; at least 25% reserved for disadvantaged systems or those serving under 25,000 people
- Pays for
- Treatment and other projects for PFAS, manganese, algal toxins, unregulated disinfection by-products and other contaminants not yet regulated.
PFAS projects get priority. Projects must address a contaminant on an EPA Contaminant Candidate List.
How NEER helps: Water system models for treatment siting and source blending alternatives.
Utah Division of Housing and Community Development
Open now
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Third trimester FY2027: Feb 1, 2027 by 5 p.m., submitted by the AOG. Applicants must give it to their AOG at least two weeks earlier. Funding meeting in June.
- Funding
- Mix of loan and grant set by the Board; loan rates start from a 2.5% benchmark. Water and sewer packages on the Oct 1, 2026 funding agenda ran $1.4M to $4.1M, mostly 30-year loans at 0.5% to 1.0% with 40% to 70% grant. Planning grants under $50,000 get expedited staff review.
- Who
- Counties, cities, towns, special service and improvement districts, water conservancy districts and other subdivisions impacted by mineral development on federal lands. Tribes and nonprofits are not eligible.
- Pays for
- Planning, construction and maintenance of public facilities, including water, sewer and drainage, plus master plans and capital facility plans.
Since Jul 1, 2026 only the AOG can submit, and the project must be on the county's CIB application list from the Utah Project Portal. A Capital Asset Self-Inventory no more than two years old is required, and planning requests need a 50% cash match. In September 2026 the Board discussed limiting request size, pausing applications and moving to two cycles a year; confirm the Feb 1 deadline with CIB staff.
How NEER helps: Water and sewer master plans and capital facility plans, which CIB funds as planning grants.
Utah Division of Housing and Community Development, with the seven regional AOGs
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2027 applications due in WebGrants Jan 31, 2027, after a first public hearing. Income surveys due from AOGs Jan 15, 2027. Awards announced March or April; final resubmission by May 31, 2027.
- Funding
- About $5.5M statewide estimated for 2027, split among seven regions ($599,749 to $978,712 each). Minimum $30,000 per project; regions set their own caps.
- Who
- Cities under 50,000 and counties under 200,000, outside the entitlement cities and Davis, Salt Lake and Utah counties
- Pays for
- Water and sewer lines, water and wastewater plants, storage tanks, flood drainage and other public facilities serving mostly low- and moderate-income residents.
Attendance at a regional How to Apply workshop (Oct to Nov 2026) is required, and each AOG sets its own pre-application due date. The program page's cycle note doesn't match the 2027 Policies and Procedures; follow the manual and your AOG. Wastewater plant projects need DEQ plan approval.
How NEER helps: Engineering reports and service area maps for the application.
Utah Division of Water Resources, Board of Water Resources
Rolling
LoanGrant (limited grants for small secondary systems)Drinking waterStormwater & flood
- Next date
- Next application deadline Jan 8, 2027 for the Mar 17, 2027 Board meeting. Later 2027 deadlines: Mar 5, Apr 16, Jun 4, Jul 23, Oct 1.
- Funding
- Board share up to 85% of non-grant costs, 15 to 25 years. About 3% for culinary or secondary projects over $1M, 1% for agricultural and secondary meter projects, 0% for some projects under $1M. Small secondary systems: 50% grant cost share, limited.
- Who
- Cities, towns, water districts, water and irrigation companies and tribes. Not developers or individuals.
- Pays for
- Culinary, secondary and irrigation water projects such as pipelines, wells, storage tanks, dam safety upgrades, flood control and diversion structures, and secondary water meters.
Routine O&M and systems where fewer than half of residents live year-round aren't eligible. A project goes to the Board twice: once for authorization and again for committal after design and a water conservation plan. Most projects also need to be in the Unified Water Infrastructure Plan.
How NEER helps: Water system and flood control models for the feasibility report.
Water Development Coordinating Council, through the Utah Division of Water Resources
Rolling
LoanGrant (a pre-application step for state board funds, not a separate award)Drinking waterWastewater (sewer)Stormwater & flood
- Next date
- Portal open year-round; May 1, 2027 cutoff for projects to make the next agency plans
- Funding
- No separate award. Listing is required for most state money from the Drinking Water, Water Quality and Water Resources boards.
- Who
- Towns, cities, counties, water conservancy districts, irrigation companies and other public water suppliers. The account must be the project sponsor, not the engineer.
- Pays for
- Drinking water, wastewater, stormwater and flood control, reuse, secondary and raw water projects likely to seek state money in the next 20 years, plus reserve studies and asset management plans.
Funding from the Water Infrastructure Fund requires relevant capital asset management plans and a reserve study. Emergency and small projects and federally restricted funds are exempt. CIB and Department of Agriculture and Food funds aren't tied to the UWIP.
How NEER helps: Capital improvement plans and project cost data for portal entries.
Utah Division of Emergency Management
Check agency
GrantStormwater & flood
- Next date
- No Utah FMA or BRIC deadline posted; check the agency. DR-4948 (Oct 7, 2026) was declared for Public Assistance without HMGP.
- Funding
- Passes through FEMA funds
- Who
- State and local governments, tribes and certain nonprofits with an approved hazard mitigation plan
- Pays for
- DEM runs Utah's FMA, BRIC, HMGP and PDM applications, helps update local hazard mitigation plans and tracks projects in a mitigation project database.
Local plans are kept by the AOGs, several counties and some water districts. DR-4948 covers the Cottonwood Fire, flooding and mudslides (Jul 13 to 24, 2026) in Beaver and Piute counties. HMGP was declared for the 2023 flooding (DR-4752; Iron, Morgan, Sanpete, Utah and Wasatch counties) and for the Forsyth Fire FMAG (Washington County, 2025).
How NEER helps: Flood models that back hazard mitigation plan actions and benefit-cost analysis.