Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Wyoming water infrastructure funding

Federal, state and local grants and loans that communities in Wyoming can use for drinking water, wastewater and stormwater projects.

20Grant programs
6Loan programs
12Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 20Loans 6Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 2, 2026estimate
    Expected
    Wyoming SRF applications due for the Apr 1, 2027 SLIB meeting120 days before the meeting, per the SRF application cover sheet. OSLI hasn't posted a 2027 deadline list; the same rule matched every SFY2026 deadline.Drinking Water SRF, incl. lead service lines and emerging contaminants
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. Dec 15–16, 2026
    Watch
    Water Development Commission workshop on draft billsIn Cheyenne. The Commission reviews the draft 2027 water bills, which carry Level III construction funding. The Select Water Committee meets Dec 17.Water Development Program (Level I, II and III, new development and rehabilitation)
  4. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  5. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  6. Jan 2027
    Watch
    WCDA board approves 2026 CDBG awardsApplications closed Sep 30, 2026.Community Development Block Grant (CDBG)
  7. ~Mid-Jan 2027estimate
    Expected
    Project submissions close for the next SRF Intended Use PlansLast year the 2027 plans opened Dec 1, 2025 and closed Jan 16, 2026. A project must be on the plan to get a loan or principal forgiveness.Clean Water SRF loans
  8. Feb 3, 2027estimate
    Expected
    Wyoming SRF applications due for the Jun 3, 2027 SLIB meeting120 days before the meeting, per the SRF application cover sheet. Deficiencies must be fixed 45 days before the meeting.Clean Water SRF loans
  9. Feb 4, 2027
    Watch
    SLIB meetingFirst regular State Loan and Investment Board meeting of 2027.Drinking Water SRF, incl. lead service lines and emerging contaminants
  10. Feb 18, 2027estimate
    Expected
    Mineral Royalty Grant applications due for the June meetingRegular applications have been due the third Thursday of February. A third-party listing shows Feb 18, 2027; confirm with OSLI. Awards at the Jun 17, 2027 special meeting.Mineral Royalty Grants (MRG)
  11. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  12. Mar 1, 2027
    Deadline
    Water Development Level I and II study applications dueIncludes the $1,000 fee. Preliminary recommendations at the May Commission meeting.Water Development Program (Level I, II and III, new development and rehabilitation)
  13. Mar 1, 2027
    Deadline
    Wildlife and Natural Resource Trust applications dueSecond cycle due Sep 1, 2027.Wildlife and Natural Resource Trust grants
  14. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  15. Apr 7, 2027estimate
    Expected
    Wyoming SRF applications due for the Aug 5, 2027 SLIB meeting120 days before the meeting, per the SRF application cover sheet.Drinking Water SRF, incl. lead service lines and emerging contaminants
  16. Jun 9, 2027estimate
    Expected
    Wyoming SRF applications due for the Oct 7, 2027 SLIB meeting120 days before the meeting, per the SRF application cover sheet.Clean Water SRF loans
  17. Jun 2027estimate
    Expected
    WCDA CDBG notice of funding availabilityLast cycle: notice in June, letter of intent Aug 31, application Sep 30, awards the next January.Community Development Block Grant (CDBG)
  18. Jun 17, 2027
    Watch
    SLIB special Mineral Royalty Grant meetingAwards for regular MRG applications.Mineral Royalty Grants (MRG)
  19. Aug 4, 2027estimate
    Expected
    Wyoming SRF applications due for the Dec 2, 2027 SLIB meeting120 days before the meeting, per the SRF application cover sheet.Drinking Water SRF, incl. lead service lines and emerging contaminants
  20. ~Aug 31, 2027estimate
    Expected
    WCDA CDBG letter of intentBased on the 2026 cycle. Applications followed by Sep 30.Community Development Block Grant (CDBG)
  21. Sep 1, 2027
    Deadline
    Water Development Level III construction applications duePreliminary recommendations at the November Commission meeting; funding needs legislative approval.Water Development Program (Level I, II and III, new development and rehabilitation)
  22. Sep 1, 2027
    Deadline
    Wildlife and Natural Resource Trust applications dueMoney for this cycle is released in January.Wildlife and Natural Resource Trust grants
  23. Nov 1, 2027
    Deadline
    Final lead service line inventories due to EPAEvery unknown line must be identified. DWSRF lead line loans can pay for the investigation.Drinking Water SRF, incl. lead service lines and emerging contaminants
  24. Nov 15, 2027
    Deadline
    Small Water Project applications dueConsidered at the March 2028 Commission meeting. Apply through a sponsor such as a conservation district.Small Water Project Program

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Wyoming: Apply through the Wyoming Office of Homeland Security, which takes Notices of Interest anytime. HLS hadn't posted a Wyoming deadline for the FY2026 round when checked; its date will come before FEMA's.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Wyoming: Apply through the Wyoming Office of Homeland Security. FEMA's data shows no Wyoming disaster declared in 2026 as of Nov 26. The latest major disaster with HMGP is DR-4845 (wildfires, Aug 21 to 31, 2024; Campbell and Johnson counties), declared Nov 13, 2024. The 2025 Red Canyon Fire declaration (FM-5608, Hot Springs County) shows no HMGP.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Wyoming: Apply through the Wyoming Office of Homeland Security. No Wyoming round is posted.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

In Wyoming: Apply through USDA Rural Development's Wyoming office.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In Wyoming: Wyoming is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

Wyoming The State Loan and Investment Board through the Office of State Lands and Investments (SRFs with DEQ, Mineral Royalty Grants), the Water Development Office and Commission (water supply studies, construction and small water projects), the Wyoming Community Development Authority (CDBG), the Wyoming Business Council (Building Resilient Communities) and the Office of Homeland Security (FMA, BRIC, HMGP).

Clean Water SRF loans

State Loan and Investment Board and Office of State Lands and Investments, with Wyoming DEQ
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Applications are due 120 days before the SLIB meeting that will hear them. For 2027 meetings that works out to Dec 2, 2026, Feb 3, Apr 7, Jun 9 and Aug 4, 2027. Project submissions for the next plan have opened in December and closed in mid-January.
Funding
$89.0M available for loans as of Oct 29, 2026. About $2.56M in principal forgiveness left for SFY2027 plan projects, plus FFY2025 grant money not yet received. Standard rate 2.5% with a 0.5% origination fee; terms usually up to 20 years, up to 30 in some cases.
Who
Wyoming communities and districts with a project listed on the current Intended Use Plan
Pays for
Sewage treatment and collection, stormwater control, landfill water pollution control and other water pollution control projects.

A project must be on the current year's Intended Use Plan before it can apply. Every application also needs a Certificate of Completion from OSLI's online pre-application course, and DEQ says to start 6 to 12 months before bidding. Deficiencies must be fixed 45 days before the meeting. Saratoga got 50% forgiveness on its sewer collection loan.

How NEER helps: Facility plans built on calibrated sewer models; I/I and stormwater studies.

Drinking Water SRF, incl. lead service lines and emerging contaminants

State Loan and Investment Board and Office of State Lands and Investments, with Wyoming DEQ and the Water Development Office
Open now
LoanGrant (principal forgiveness)Drinking water
Next date
Applications are due 120 days before the SLIB meeting that will hear them: Dec 2, 2026 for Apr 1, 2027, then Feb 3, Apr 7, Jun 9 and Aug 4, 2027. Lead line and emerging contaminant loans are heard at regular meetings.
Funding
$156.9M available for loans as of Oct 29, 2026. Core loans: 25%, 50% or 75% principal forgiveness for eligible systems, about $4.0M left from FFY2025 grants. Lead lines: 0% with no origination fee, 25% to 100% forgiveness, about $23.1M left. Emerging contaminants: 0% and 100% forgiven, about $15.5M left.
Who
Public water systems with a project on the current Intended Use Plan; emerging contaminant loans also reach other entities
Pays for
Treatment, wells and source protection, storage tanks, transmission and distribution lines, lead service line inventories and replacement, and PFAS and other emerging contaminant testing and fixes.

Final lead line inventories, with every unknown line identified, are due to EPA by Nov 1, 2027. OSLI pays for technical help with inventories and lead line projects through wyriskit.com. Two December 2026 borrowers took a 0% rate as equivalency projects and still got forgiveness.

How NEER helps: Lead service line material prediction; water system models for master plans and PFAS alternatives.

Mineral Royalty Grants (MRG)

State Loan and Investment Board and Office of State Lands and Investments
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Regular applications expected by Feb 18, 2027 (third Thursday of February) for the Jun 17, 2027 special MRG meeting. Emergency grants can go to any regular SLIB meeting.
Funding
BFY2027–28 allocation of $36.2M, before an estimated $11.2M coal lease bonus reduction and the $2.6M DWSRF state match. About 87.5% of awards go to grants of up to 50% of project cost; the rest can reach 75%.
Who
Cities, towns, counties, special districts and joint powers boards
Pays for
Capital projects that fix an emergency threat to health or safety, meet a federal or state mandate, or provide an essential public service. Recent awards covered water tanks, transmission lines, sewer repairs and a WWTP assessment.

Demand exceeds the money. In June 2026, 19 eligible requests totaled $9.7M against $6.2M; Rawlins got $750,000, half the cost of its booster station. Score points come from local match, a capital improvement or asset management plan, and readiness. Applications must use the forms revised in August 2026.

How NEER helps: Condition assessments and capital improvement plans that support the request.

Opening soon
GrantLoanDrinking water
Next date
Level I and II study applications due Mar 1, 2027. Level III construction applications due Sep 1, 2027. Preliminary funding recommendations at the November Commission meeting.
Funding
Level I and II studies are 100% state funded. Level III: grant typically up to 67%, up to 75% for severe hardship, rest as a loan. Loans at a 4% statutory minimum, up to 50 years. $1,000 application fee, 75% refunded if denied.
Who
Public entities that can take state money and incur debt, such as municipalities, joint powers water boards and water and sewer districts
Pays for
Master plans, feasibility studies, design and construction of water supply: wells, transmission lines, storage and rehabilitation of systems at least 15 years old. Municipal and rural domestic projects need at least 20 metered taps.

The program does not fund wastewater, distribution systems, most water treatment plants or projects that are only flood control. Level III money needs legislative approval in the omnibus water bill. Complete a current Public Water System Survey before applying.

How NEER helps: Water master plans and system models for Level I and II studies.

Small Water Project Program

Wyoming Water Development Office and Commission
Next cycle
GrantDrinking water
Next date
Applications for the March 2027 Commission meeting closed Nov 15, 2026. Next due Nov 15, 2027.
Funding
50% of construction cost, up to $35,000
Who
Public entities such as conservation districts, watershed improvement districts, water conservancy and irrigation districts, municipalities and the tribal business councils
Pays for
Small reservoirs, wells, pipelines, springs, windmills, solar platforms, wetlands, irrigation works and rural community fire suppression, with a public benefit.

Landowners apply through a sponsor, usually their conservation district. Projects in a WWDC watershed study can show public benefit more easily. Notice-to-proceed requests are due by Aug 1 to be handled before the next March meeting.

Community Development Block Grant (CDBG)

Wyoming Community Development Authority
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 round closed Sep 30, 2026; awards at the WCDA board in January 2027. Next round expected to follow the same pattern: notice in June, letter of intent by Aug 31, application by Sep 30, 2027.
Funding
$3.6M in FY26–27 CDBG plus $1.7M from earlier years. No cap per project; up to two applications per round.
Who
Non-entitlement cities, towns and counties. Cheyenne cannot apply.
Pays for
Public facilities and other community development that mostly benefits low and moderate income residents, including water, sewer and storm drainage.

The Wyoming Business Council no longer runs CDBG; WCDA does. When requests exceed the money, WCDA ranks non-water and sewer projects first, so pair CDBG with SRF or MRG money. Projects in a floodplain lose points. Applications go through ProCorem.

How NEER helps: Engineering reports and drainage studies to define the project and cost.

Next cycle
GrantLoanDrinking waterWastewater (sewer)
Next date
2026 round closed Aug 1, 2026; those applicants go to the WBC board in December 2026 and then SLIB. Next deadline not posted. Check the agency.
Funding
No cap posted. Loans at a 0% floor for non-revenue projects and 1% for revenue projects, up to 30 years.
Who
Cities, towns, counties, joint powers boards and the Northern Arapaho and Eastern Shoshone tribes
Pays for
Publicly owned infrastructure, including water and sewer, that removes a barrier to economic growth.

Formerly Business Ready Community. New program rules took effect in 2026 with a new application portal, so older guidance may not apply.

HLS hazard mitigation intake (FMA, BRIC, HMGP)

Wyoming Office of Homeland Security
Open now
GrantStormwater & flood
Next date
Notice of Interest: anytime
Funding
Passes through FEMA funds, usually 75% federal and 25% local
Who
Wyoming jurisdictions and tribes with an approved hazard mitigation plan
Pays for
HLS takes Notices of Interest, then helps with FEMA applications. HMGP opens after a presidential disaster declaration; HMGP Post-Fire opens after a Fire Management Assistance declaration; FMA opens each year, usually in the fall.

HLS says every county, community and tribe now has an approved plan. FEMA's data shows no Wyoming disaster declared in 2026 as of Nov 26. HMGP was declared for DR-4845 (2024 wildfires in Campbell and Johnson counties) and for four 2024 fire declarations; Post-Fire money can pay for flash flood and erosion control in burned areas.

How NEER helps: Flood models and benefit-cost support for detention, drainage and acquisition projects.

Wildlife and Natural Resource Trust grants

Wyoming Wildlife and Natural Resource Trust
Opening soon
GrantStormwater & flood
Next date
Due Mar 1 and Sep 1 each year; money is released in July and January
Funding
No cap posted. Projects of $400,000 or more also need legislative review.
Who
Governmental and nonprofit organizations; conservation districts sponsor the most projects
Pays for
Habitat and watershed work, including water enhancement and water quality projects that benefit fish and wildlife.

Stormwater or wastewater work needs a clear habitat or water quality benefit to fit. Ask staff before applying.

Local and regional County and regional cost-share programs.

Rolling
GrantMatch helpDrinking waterStormwater & flood
Next date
Community Enhancement Grants: no deadline posted. State applications it sponsors follow their own dates (Small Water Projects Nov 15; Trust Mar 1 and Sep 1).
Funding
Community Enhancement Grants up to $5,000
Who
Albany County landowners, groups and public bodies
Pays for
Small grants for public projects that help water quality and other natural resources, and sponsorship of Small Water Project and Wildlife and Natural Resource Trust applications.

State Small Water Project money needs a public sponsor, and in Albany County that is usually the district.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. Office of State Lands and Investments: SRF Programs (pre-application certification)
  23. Office of State Lands and Investments: Clean Water State Revolving Funds
  24. Wyoming DEQ: State Revolving Loan Fund
  25. Wyoming DEQ public notice: 2027 Intended Use Plans open for project submissions (Dec 1, 2025)
  26. Wyoming DEQ public notice: SFY2026 SRF principal forgiveness available (Oct 15, 2025; copy on pubt.io)
  27. SLIB Board Matter E-1, Oct 1, 2026: CWSRF loan increases (Gillette, Saratoga)
  28. SLIB: CWSRF status report, Oct 29, 2026
  29. SLIB Board Matter F-1, Dec 3, 2026: DWSRF core program loans (incl. application cover sheet)
  30. SLIB Board Matter I-1, Dec 3, 2026: 2027 board meeting dates
  31. Office of State Lands and Investments: Drinking Water State Revolving Funds
  32. Wyoming DEQ public notice: draft FY2027 Intended Use Plans public meeting (Mar 10, 2026; copy on pubt.io)
  33. SLIB Board Matter F-2, Dec 3, 2026: DWSRF lead service line program loan
  34. SLIB Board Matter F-3, Dec 3, 2026: DWSRF emerging contaminants program loans
  35. SLIB: DWSRF status report, Oct 29, 2026
  36. Office of State Lands and Investments: State Loan and Investment Board meetings
  37. Office of State Lands and Investments: Mineral Royalty Grants
  38. SLIB: Mineral Royalty Grant program summary, BFY2027–28, as of Oct 31, 2026
  39. SLIB Board Matter G-2, Jun 18, 2026: 19 Mineral Royalty Grant applications
  40. Bigfoot 99: Rawlins awarded SLIB mineral royalty grant for booster station project (Jun 22, 2026)
  41. OSLI bulletin: MRG and TEA applications accepted on revised forms (Aug 4, 2026)
  42. SLIB Board Matter G-1, Oct 1, 2026: emergency Mineral Royalty Grant, Goshen County
  43. GrantedAI listing (third party): Mineral Royalty Grant 2027, deadline Feb 18, 2027
  44. Wyoming Water Development Commission: Project application information
  45. Operating Criteria of the Wyoming Water Development Program (approved Aug 8, 2024)
  46. Wyoming Water Development Commission: Calendar
  47. Wyoming Water Development Commission: Small Water Projects
  48. Operating Criteria of the Small Water Project Program
  49. Wyoming Community Development Authority: 2027 CDBG Method of Distribution (board approved)
  50. Wyoming Business Council: Building Resilient Communities
  51. Wyoming Business Council: updated BRC application and resources launched (Jun 22, 2026)
  52. Wyoming Business Council: 2026 BRC deadlines combined into Aug 1, 2026
  53. Wyoming Office of Homeland Security: Hazard Mitigation Assistance grants
  54. Wyoming Office of Homeland Security: Mitigation
  55. OpenFEMA: Disaster Declarations Summaries, Wyoming since 2022 (queried Nov 26, 2026)
  56. Wyoming Wildlife and Natural Resource Trust: Funding application guidelines
  57. Laramie Rivers Conservation District
  58. Laramie Rivers Conservation District: External funding