MassDEP, with the Massachusetts Clean Water Trust
Next cycle
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Project Evaluation Forms (PEFs) for the 2027 plan closed Jul 24, 2026. Draft 2027 plan expected in December 2026, followed by a 30-day comment period and the final plan. PEFs for the 2028 plan expected mid-May to end of July 2027. Planning loans and sewer overflow (OSG) planning grants are accepted anytime with no PEF.
- Funding
- 2026 plan (the current one): about $728M, including 29 new construction projects ($413M), 12 multi-year projects and $25M for planning, septic, OSG grants and an emergency reserve. Loans are 2% for 20 years; 30-year loans have been 2.2%; nutrient reduction projects can get 0%. Disadvantaged Communities get 3.3%, 6.6% or 9.9% of principal forgiven, by affordability tier. OSG planning or design grants up to $250,000. Nov 9, 2026: $108.1M in loan forgiveness for 46 wastewater projects.
- Who
- Cities, towns, districts, counties and other public borrowers
- Pays for
- Wastewater treatment, collection systems, CSO and SSO correction, I/I and sewer rehabilitation, stormwater and nonpoint source projects. Also planning loans, community septic loans and OSG planning grants.
Projects compete once a year: file a PEF in the eSRF portal by the end of July to get on next year's plan. Projects on the 2027 plan must appropriate the full cost by Jun 30, 2027, submit a complete application with biddable plans by Oct 1, 2027 and sign construction contracts by Jun 30, 2028. The 2026 plan capped each applicant at $50M and offered no 0% PFAS loans, and MassDEP says multi-year approval for new 2027 projects depends on available funding. Interim construction loans are 0%. The Trust has posted the 2027 affordability tiers.
How NEER helps: Sewer models for CSO, I/I and capacity projects; planning studies that support the PEF.
MassDEP, with the Massachusetts Clean Water Trust
Rolling
LoanGrant (principal forgiveness)Drinking water
- Next date
- Lead service line planning and construction loans: apply anytime while funds last, no PEF needed. PEFs for other 2027 projects closed Jul 24, 2026; draft 2027 plan expected in December 2026. PEFs for the 2028 plan expected mid-May to end of July 2027.
- Funding
- 2026 plan (the current one): almost $434M, including six new construction projects ($167.1M), $103.4M for lead line planning and construction loans, $10M for planning and PFAS design loans and a $5M emergency reserve. Loans are 2% for 20 years. Lead line loans are 0%, and their forgiveness has been 40%. Disadvantaged Communities get 6.6%, 13.2% or 19.8% forgiveness by tier (3.3%, 6.6% or 9.9% for PFAS projects). Cybersecurity grants up to $50,000.
- Who
- Public water systems; cybersecurity grants are for small systems or disadvantaged communities
- Pays for
- Treatment (including PFAS), wells, storage, transmission mains, lead service line inventory and replacement, and cybersecurity fixes.
The 2026 plan offered no 0% PFAS loans; PFAS projects get the standard rate plus forgiveness paid from the federal emerging contaminants grant. For 2027, top-tier PFAS projects need finished water at or above 10 ppt PFAS6. Lead line grants ran out in 2025 and aren't expected again, and lead line loan money is federal with a limited window, so apply early. The 2026 plan capped each applicant at $15M. MassDEP told one district in 2026 to file a new PEF when its PFAS project slipped past its funding window.
How NEER helps: Lead service line material prediction; water system models for treatment and PFAS alternatives.
MassDEP, with the Massachusetts Clean Water Trust
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Paused: no applications taken for the 2027 plans. Grants from the 2026 plan and earlier are going ahead. Check the agency on the 2028 cycle.
- Funding
- When offered: up to 60% of cost or $150,000, whichever is less, with at least a 40% local match. The 2026 plan funded two clean water ($300K) and four drinking water ($443K) grants.
- Who
- Communities and utilities with wastewater, drinking water or stormwater systems
- Pays for
- Asset management plans for wastewater, drinking water or stormwater utilities, or any combination.
When the program runs, MassDEP favors systems serving under 10,000 people or with fewer than 3,330 connections, and first-time applicants. Staff time can cover part of the match.
How NEER helps: Asset inventories, condition and risk scoring built on network models.
MassDEP, Bureau of Water Resources, Watershed Planning Program
Next cycle
GrantStormwater & flood
- Next date
- FY27 rounds closed: 604(b) on Oct 7, 2026 and 319 on Oct 28, 2026. Next requests for proposals expected Aug to Sep 2027.
- Funding
- Check the agency
- Who
- Eligible entities named in each request for proposals
- Pays for
- 604(b): finding nonpoint source water quality problems, choosing solutions and preliminary design of best management practices. 319: building those practices to cut nonpoint source pollution.
A 604(b) planning grant produces the design that a later 319 implementation grant can build. Both are posted on COMMBUYS.
How NEER helps: Stormwater and pollutant load models that pick and size the practices.
Executive Office of Energy and Environmental Affairs (EEA)
Opening soon
GrantStormwater & flood
- Next date
- FY28 Expressions of Interest closed Oct 16, 2026. FY28 application expected to open early 2027 and close in spring 2027, with awards in summer 2027. The FY27 round ran Jan 20 to Mar 27, 2026.
- Funding
- Up to $3M for one community, up to $5M for regional projects; 10% match, none for Tribes and designated rural and small towns. EEA says final terms come with the FY28 request for responses.
- Who
- MVP-designated municipalities, Tribes, and districts, boards and regional agencies applying with a municipal letter of support. Communities with older MVP plans must also apply to MVP 2.0 to stay eligible.
- Pays for
- Climate adaptation projects: stormwater and green infrastructure, culvert and small bridge work, dam removal, nature-based solutions and retrofit or relocation of critical infrastructure.
MVP Action is applied for through the ECO One Stop common application with Coastal Resilience, Dam and Seawall and other EEA grants. Submit an Expression of Interest in the fall to get staff feedback. Climate action plans and FEMA hazard mitigation plans aren't funded.
How NEER helps: Flood and stormwater models that define the project and show its benefit.
Executive Office of Energy and Environmental Affairs (EEA)
Open now
GrantStormwater & flood
- Next date
- FY27 applications due Dec 11, 2026, 11:59 PM, in the EEA Grants Management System
- Funding
- $50,000 per community or regional group for the planning steps, plus $50,000 per community for a seed project; two-year grant, no match
- Who
- Massachusetts municipalities (and Devens), Tribes, and regional planning agencies applying for municipalities. 32 communities with older MVP plans must apply this round to stay eligible for MVP Action grants.
- Pays for
- A two-year process to revisit community resilience priorities and turn them into projects, with project development support.
MVP 2.0 is applied for separately, not through ECO One Stop. The request for responses on COMMBUYS was updated and an addendum added on Nov 24, 2026; read the current version.
How NEER helps: Flood risk mapping to set priorities.
Massachusetts Office of Coastal Zone Management (CZM), EEA
Opening soon
GrantStormwater & flood
- Next date
- FY28 Expressions of Interest closed Oct 16, 2026. FY28 request for responses expected early 2027 through ECO One Stop.
- Funding
- FY27: up to $2M per project; 10% match, none for Tribes and designated rural and small towns
- Who
- The 78 municipalities in the Massachusetts coastal zone, certified 501(c)(3) nonprofits and Tribes
- Pays for
- Coastal vulnerability assessments, outreach, planning and bylaws, retrofit or relocation of vulnerable facilities such as seawalls, wastewater plants, pump stations, roads and culverts, and nature-based shoreline restoration.
FY27 grants, announced Aug 13, 2026, went to 12 recipients including Chatham, Falmouth, Hull, Revere, Salem and Wareham. The whole ECO One Stop round awarded more than $45M to 97 projects.
How NEER helps: Coastal flood and drainage models to compare options.
Executive Office of Energy and Environmental Affairs (EEA)
Opening soon
GrantStormwater & flood
- Next date
- FY28 application period expected to open early 2027 through ECO One Stop; FY27 closed Mar 27, 2026
- Funding
- Design and permitting: up to $250K for dams, levees and other inland flood control, up to $500K for seawalls and coastal structures. Construction: up to $1M inland, up to $3M coastal. 10% match, none for Tribes and designated rural and small towns.
- Who
- Local government bodies and certified 501(c)(3) nonprofits
- Pays for
- Repair or removal of dams, levees, seawalls and other flood control structures.
Dams must be under DCR Office of Dam Safety jurisdiction, levees publicly owned and seawalls owned by the municipality or a nonprofit. High or significant hazard dams in poor or unsafe condition get preference. Construction applicants should have permits in hand and a MEPA filing before applying.
How NEER helps: Dam breach and flood models for design and removal studies.
Executive Office of Economic Development (EOED), with EOHLC and MassDevelopment
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FY2028 round expected to open early 2027. FY2027 Expressions of Interest opened Jan 23, 2026; full applications were due Jun 3, 2026.
- Funding
- FY2027: $330M through 403 awards in 14 programs, announced Oct 2, 2026
- Who
- Massachusetts public entities and their partners
- Pays for
- Public infrastructure tied to housing and economic development, site preparation and planning. Recent awards include well and wastewater design projects.
One application is matched to programs such as MassWorks, HousingWorks and Site Readiness. The optional Expression of Interest tells you which fit. Include a letter of support from the chief municipal officer.
How NEER helps: Water and sewer capacity studies that show the growth a project unlocks.
Executive Office of Housing and Livable Communities (EOHLC)
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FFY 2027 applications proposed to open Jan 19, 2027 and close Mar 30, 2027. Comments on the proposed changes are due Dec 10, 2026; Mini-Entitlement communities send a preliminary activity list by Dec 15, 2026.
- Funding
- Proposed FFY 2027: $24.2M for the Community Development Fund (grants of $200,000 to $1M for one town, up to $1.25M for two and $1.45M for three or more; planning or design grants from $20,000) and up to $9M for 10 Mini-Entitlement communities (up to $900,000 each)
- Who
- Municipalities that are not HUD entitlement communities. Mini-Entitlement: Amherst, Beverly, Chelsea, Gardner, Greenfield, North Adams, Southbridge, Wareham, Webster and West Springfield.
- Pays for
- Housing, infrastructure, public facilities, downtown revitalization, planning and public services that benefit low- and moderate-income residents.
To apply, a town must have spent all FFY 2022–23 funds, 80% of FFY 2024 funds and 30% of FFY 2025 funds; waiver requests are due Feb 19, 2027. Grants run 24 months, Jul 1, 2027 to Jun 30, 2029. These terms are proposed until the One-Year Action Plan is final.
How NEER helps: Engineering studies that define water, sewer or drainage projects.
Massachusetts Emergency Management Agency (MEMA)
Open now
GrantStormwater & flood
- Next date
- FY2026 FMA: Statement of Interest due Nov 30, 2026 (required); benefit-cost analysis Dec 21, 2026; subapplications to MEMA Jan 11, 2027, 11:59 PM
- Funding
- Passes through FEMA funds. FY2026 FMA: $400M nationwide, with a federal share of 75%, 90% or 100% depending on the activity and the property's repetitive loss status. BRIC pays up to 75%.
- Who
- State agencies, Tribes and local governments (the city or town, not a department). Project grants need a current FEMA-approved hazard mitigation plan.
- Pays for
- MEMA checks basic eligibility from the Statement of Interest, opens FEMA GO access and gives technical help to the projects it recommends, ranks subapplications through an interagency panel and submits them to FEMA.
There are separate Statement of Interest forms for construction projects and for capacity building, planning or advance assistance. HMGP for DR-4780 (Sep 2023 flooding in Bristol and Worcester counties) had about $984,000 statewide and closed to subapplications Mar 10, 2025. DR-4919 (Feb 2026 winter storm, declared Jun 30, 2026) covers only the Mashpee Wampanoag Tribe.
How NEER helps: Hazard mitigation plan actions and benefit-cost analysis backed by flood models.