Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

North Carolina water infrastructure funding

Federal, state and local grants and loans that communities in North Carolina can use for drinking water, wastewater and stormwater projects.

28Grant programs
7Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 28Loans 7Match and other help 2
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 9, 2026
    Watch
    State Water Infrastructure Authority meetingConsiders rolling lead service line, PFAS study and septic applications received by Nov 2, 2026.DWSRF Lead Service Line Replacement (LSLR)
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. Jan 1, 2027
    Watch
    Water Resources Development grants spring 2027 cycle opensDWR cost-share for stormwater, flood reduction, drainage and stream restoration; up to 50% of non-federal costs.Water Resources Development Grants, state and local projects
  4. Jan 7, 2027
    Deadline
    NC Rural Infrastructure grant applications dueJob-creation water and sewer grants; awards Feb 18, 2027. Later deadlines Feb 22 and Apr 29, 2027.Rural Infrastructure grants (job creation)
  5. Jan 8, 2027, 5 p.m.
    Deadline
    FMA Swift Current (DR-4889) final sub-applications in FEMA GONCEM's state intake closed Oct 16, 2026. $20M for elevation, acquisition and mitigation reconstruction of NFIP-insured homes.NCEM hazard mitigation intake (HMGP, FMA, BRIC)
  6. Jan 11, 2027, 5 p.m.
    Deadline
    DWI rolling application cut-offLead service line, PFAS study and septic applications in by this date go to the Feb 17, 2027 Authority meeting. Subject to change when the 2027 calendar is set.DWSRF Lead Service Line Replacement (LSLR)
  7. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  8. Jan 15, 2027 (expected)estimate
    Expected
    NC Land and Water Fund grant cycle opensInferred from the Fund's annual timeline; 2026 forms opened Jan 15, 2026.NC Land and Water Fund restoration, innovative stormwater and planning grants
  9. Feb 17, 2027 (expected)
    Watch
    Authority meeting; fall 2026 round awards expectedFall 2025 round awards came at the Feb 18, 2026 meeting. The date is subject to change.Clean Water State Revolving Fund (CWSRF)
  10. Feb 22, 2027
    Deadline
    NC Rural Infrastructure grant applications dueAwards Apr 15, 2027.Rural Infrastructure grants (job creation)
  11. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  12. Mar 1, 2027, 5 p.m.
    Deadline
    DWI rolling application cut-offLead service line, PFAS study and septic applications in by this date go to the Apr 21–22, 2027 Authority meeting. Subject to change.SRF Emerging Contaminants (PFAS) study and construction funds
  13. Mar 1, 2027 (expected)estimate
    Expected
    NC Land and Water Fund applications dueRestoration, innovative stormwater and planning grants, 11:59 p.m. Inferred from the annual timeline; 2027 manuals not yet posted.NC Land and Water Fund restoration, innovative stormwater and planning grants
  14. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  15. Apr 29, 2027
    Deadline
    NC Rural Infrastructure grant applications dueAwards Jun 17, 2027.Rural Infrastructure grants (job creation)
  16. ~Apr 30, 2027 (expected)estimate
    Expected
    DWI spring 2027 funding applications dueCWSRF, DWSRF, CDBG-I, PFAS construction and Viable Utility Reserve. Inferred from the spring 2026 deadline of Apr 30, 2026; training ran Feb 23 to Mar 4.Clean Water State Revolving Fund (CWSRF)
  17. Jun 30, 2027 (expected)estimate
    Expected
    Water Resources Development grants spring 2027 cycle closesDWR's annual cycle runs Jan 1 to Jun 30. Request the pre-application call by Jun 1.Water Resources Development Grants, state and local projects
  18. ~Sep 30, 2027 (expected)estimate
    Expected
    DWI fall 2027 funding applications dueSRFs, CDBG-I, State Reserve construction, and AIA and MRF planning grants. Inferred from the fall 2026 deadline of Sep 30, 2026.State Reserve Program construction grants and loans

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In North Carolina: Apply through NCEM's Salesforce portal, then FEMA GO. NCEM had not posted a state deadline for the regular FY2026 FMA when checked.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In North Carolina: NCEM is running Swift Current for DR-4889 (Tropical Depression Chantal): $20M for NFIP-insured homes, state intake closed Oct 16, 2026, final sub-applications in FEMA GO by Jan 8, 2027.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In North Carolina: DR-4827 (Tropical Storm Helene, declared Sep 28, 2024) and DR-4837 (Potential Tropical Cyclone Eight, Oct 19, 2024) include HMGP. NCEM sent Helene acquisition, elevation and infrastructure sub-applications to FEMA through 2026 and posts their status. DR-4889 (Chantal, Sep 11, 2025) lists no HMGP. Ask NCEM whether any intake is open.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In North Carolina: NCEM took FY2024–25 BRIC letters of interest Apr 15 to Jun 12, 2026, with sub-applications due in FEMA GO Jul 10, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

North Carolina NC DEQ's Division of Water Infrastructure runs the Clean Water and Drinking Water SRFs, CDBG-Infrastructure, the State Reserve, Viable Utility Reserve and planning grants for the State Water Infrastructure Authority; DEQ's Division of Water Resources and Division of Coastal Management run flood and stormwater cost-share grants; NC Commerce runs Renew NC (Helene CDBG-DR) and rural infrastructure grants; the NC Land and Water Fund funds restoration and stormwater projects; North Carolina Emergency Management (NCEM) runs hazard mitigation.

Clean Water State Revolving Fund (CWSRF)

NC DEQ, Division of Water Infrastructure, for the State Water Infrastructure Authority
Opening soon
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Fall 2026 round closed Sep 30, 2026; awards expected at the Feb 17, 2027 Authority meeting. Spring 2027 round expected to close around Apr 30, 2027.
Funding
Fall 2026: about $90M, including $10M in principal forgiveness. Up to $35M per local government per round; about $200M total CWSRF debt per local government. Rate is half the 20-year bond index (2% to 2.5% this year); 0% on the repayable part for 75% or 100% forgiveness projects, about 1% for 25% or 50% forgiveness and Green Project Reserve projects.
Who
Local government units: counties, cities, towns, sanitary districts, water and sewer authorities
Pays for
Wastewater treatment and collection, reclaimed water, stormwater control measures, stream restoration and energy efficiency.

Forgiveness comes from the Affordability Calculator (25%, 50%, 75% or 100%), from consolidating a nonviable system (up to $3M), or from serving a disadvantaged area (50%, up to $500K). DWI does not contact applicants after the deadline, so state on the application the minimum grant or forgiveness you would accept. Septic repair and septic-to-sewer projects can use the CWSRF decentralized pilot through the rolling application.

How NEER helps: Engineering reports and I/I, capacity and stormwater studies built on calibrated models.

Drinking Water State Revolving Fund (DWSRF)

NC DEQ, Division of Water Infrastructure, for the State Water Infrastructure Authority
Opening soon
LoanGrant (principal forgiveness)Drinking water
Next date
Fall 2026 round closed Sep 30, 2026; awards expected at the Feb 17, 2027 Authority meeting. Spring 2027 round expected to close around Apr 30, 2027.
Funding
Fall 2026: about $70M, including $19M in principal forgiveness. Up to $25M per local government per round; about $200M total DWSRF debt per local government. Rate is half the 20-year bond index (2% to 2.5% this year); 0% on the repayable part for 75% or 100% forgiveness projects, about 1% for 25% or 50%.
Who
Local government units, nonprofit water corporations and investor-owned drinking water companies
Pays for
Drinking water sources, treatment, transmission, distribution and storage.

Forgiveness rules match the CWSRF. Lead service line and PFAS money have their own terms and schedules; see those programs.

How NEER helps: Water system models for engineering reports and alternatives.

DWSRF Lead Service Line Replacement (LSLR)

NC DEQ, Division of Water Infrastructure
Rolling
LoanGrant (principal forgiveness)Drinking water
Next date
Rolling. Applications in by 5 p.m. Jan 11, 2027 go to the Feb 17, 2027 Authority meeting; by Mar 1, 2027 to the Apr 21–22, 2027 meeting. 2027 dates may change when the Authority sets its calendar.
Funding
About $50M available, including $20M in principal forgiveness, from the FY2024 and FY2025 federal grants; FY2026 money to follow. 0% interest. Per round: $5M to replace known lead lines, $2M to verify and replace (up to $1M of it for inventory), $1M for inventory and material verification only.
Who
Local government units, nonprofit water corporations and investor-owned drinking water companies
Pays for
Lead service line inventories, find-and-replace projects and full replacement from the main to the house, for the Lead and Copper Rule Revisions and Improvements.

Half of each round's money is held for inventory projects. Forgiveness follows the Affordability Calculator or a disadvantaged-area benefit. Use the rolling application, not the fall or spring form.

How NEER helps: Lead service line material prediction to target verification and replacement.

Rolling
Grant (100% principal forgiveness)Drinking waterWastewater (sewer)
Next date
Studies: rolling, with cut-offs Jan 11, 2027 and Mar 1, 2027 (subject to change). Construction: with the regular rounds; fall 2026 closed Sep 30, 2026, spring 2027 expected around Apr 30, 2027.
Funding
Studies: about $9M (drinking water) and $3.3M (clean water) for FY2026–27, up to $500K per applicant in each. Construction, fall 2026: about $2.8M (drinking water, up to $5M per applicant) and $2M (clean water, no per-applicant limit). All 100% forgiveness.
Who
Local government units; nonprofit water corporations; investor-owned companies for the drinking water side
Pays for
PFAS planning, alternatives analysis, design and pilot or bench testing; construction of PFAS treatment in drinking water, wastewater and publicly owned landfills.

Construction applications get two scores, one for EC money and one for base SRF money, so claim all eligible priority points. Spring 2026 offered more construction money (about $10M and $4M) than fall.

How NEER helps: Treatment alternatives and system models for PFAS studies.

Community Development Block Grant-Infrastructure (CDBG-I)

NC DEQ, Division of Water Infrastructure
Opening soon
GrantDrinking waterWastewater (sewer)
Next date
Fall 2026 round closed Sep 30, 2026. Spring 2027 round expected to close around Apr 30, 2027.
Funding
Up to $3M per local government every three years. 100% grant, no local match. About $18.9M in fall 2026 and $10M in spring 2026.
Who
Non-entitlement cities (under 50,000) and counties (under 200,000) with a project area at least 51% low-to-moderate income. Water and sewer authorities take part as a subrecipient of their town or county.
Pays for
Public water and sewer construction that fixes public and environmental health problems in low-to-moderate income areas.

Only the highest scoring application from each local government moves forward. Federal conditions apply to the whole project if CDBG-I is combined with other money. Applications need a mailed hard copy as well as the online submission. An income survey can prove LMI where census data falls short.

How NEER helps: Engineering reports and project area mapping.

State Reserve Program construction grants and loans

NC DEQ, Division of Water Infrastructure
Opening soon
GrantLoanDrinking waterWastewater (sewer)
Next date
Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
Funding
Fall 2026: about $10M in grants, shared with the planning grants. Up to $3M per project type (drinking water or wastewater) every three years. Grant share set by the Affordability Calculator. No State Reserve loans in fall 2026.
Who
Local government units, nonprofit water corporations and investor-owned drinking water companies, when other funding is not reasonably available
Pays for
State-funded construction for drinking water sources, treatment, distribution and storage, and wastewater treatment and collection.

DWI says State Reserve loans may return in later rounds.

How NEER helps: Engineering reports and models that size the project.

Asset Inventory and Assessment (AIA) grants

NC DEQ, Division of Water Infrastructure (State Reserve Program)
Opening soon
GrantDrinking waterWastewater (sewer)
Next date
Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
Funding
Up to $225,000 per system type every three years. 1.5% fee. Non-distressed systems pay a match based on how many economic indicators exceed state benchmarks.
Who
Local government units and nonprofit water corporations with no more than 10,000 residential connections
Pays for
Asset inventories, condition assessments, mapping, capital improvement plans, O&M plans and rate studies.

Distressed units can get AIA, rate study and merger study money through the Viable Utility Reserve in the spring round instead.

How NEER helps: Asset inventories, condition assessments and capital plans built on system models.

Merger/Regionalization Feasibility (MRF) grants

NC DEQ, Division of Water Infrastructure (State Reserve Program)
Opening soon
GrantDrinking waterWastewater (sewer)
Next date
Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
Funding
Up to $75,000 per system type every three years. 1.5% fee.
Who
Local government units and nonprofit water corporations with no more than 10,000 residential connections
Pays for
Studies of merging or consolidating utilities, or of interconnecting for regional treatment or supply.

A completed study can support SRF priority points and forgiveness for consolidating a nonviable system.

How NEER helps: Regionalization alternatives and the hydraulic models for the connection.

Viable Utility Reserve (VUR) grants

NC DEQ, Division of Water Infrastructure, Viable Utilities Unit, with the Local Government Commission
Opening soon
GrantDrinking waterWastewater (sewer)
Next date
Offered in the spring round. Spring 2026 closed Apr 30, 2026; spring 2027 expected around Apr 30, 2027.
Funding
Spring 2026: about $20M ($18M construction, $2M planning). Up to $5M per construction project and $400,000 per unit for studies each round; lifetime cap of $15M per unit, $30M for units merging. 1.5% fee. All grant.
Who
Units designated distressed by the Authority and the Local Government Commission, or units regionalizing with one. A council of governments or regional planning commission may apply in some cases.
Pays for
Interconnection, rehabilitation and decentralization projects; asset inventories, rate studies and merger studies; emergency operating grants only when the LGC controls the unit's finances.

Distressed units must complete an asset assessment and rate study, send a delegation to Best Utility Management Practices (BUMP) training, and write an action plan. ARPA VUR money counts toward the lifetime cap.

How NEER helps: Asset assessments and rate study inputs; regionalization models.

Next cycle
GrantStormwater & flood
Next date
No current round. Check the agency.
Funding
About $82M in American Rescue Plan Act money
Who
Cities, counties, regional councils of government and nonprofit partners
Pays for
Construction and planning for stormwater quantity and quality infrastructure.

LASII was a one-time ARPA program; its Q&A was last updated Sep 2022. For stormwater now, look at CWSRF stormwater control measures, Water Resources Development grants and the Land and Water Fund.

How NEER helps: Stormwater models and project prioritization.

Next cycle
GrantLoanDrinking waterWastewater (sewer)
Next date
Final deadline was Mar 2, 2026; all federal Helene SRF money was awarded by the Apr 15–16, 2026 Authority meeting.
Funding
EPA allocated $686M to North Carolina. About $861M in state and federal funds awarded for Helene water systems by April 2026; $655M in requested Helene needs remained unfunded.
Who
Local governments and nonprofit water or wastewater corporations affected by Helene; investor-owned systems for drinking water; for septic, local governments and nonprofits that finance homeowner repairs
Pays for
SRF-eligible projects that reduce flood risk at treatment works or make systems more resilient; septic repair and replacement, and septic-to-sewer connections.

The $22.5M septic program now runs through four nonprofits (Western Piedmont COG with High Country COG, MountainTrue, Clean Energy Fund of the Carolinas, Water Well Trust). Property owners in the 39 DR-4827 counties contact them directly; replacements may start in early 2027. Unfunded Helene projects can apply to the regular rounds.

How NEER helps: Flood exposure and resiliency analysis for plant and pump station relocation.

Renew NC Community Infrastructure Program (Helene CDBG-DR)

NC Department of Commerce, Division of Community Revitalization
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Round 1 closed Sep 8, 2026. No later round announced; check the agency.
Funding
Round 1: $55M of a $193M allocation. Awards generally $500,000 to $15M per project.
Who
Local governments in the HUD and state Most Impacted and Distressed areas: 28 western counties plus ZIP code 28214 in Mecklenburg
Pays for
Helene-related infrastructure with mitigation components: water and sewer, flood control and stormwater, parks, roads and bridges, property acquisition.

Round 1 gave priority points to water and sewer, and did not fund mitigation-only projects. Shovel-ready projects, other funding sources and service to low-to-moderate income areas score higher. Free prescreening comes with technical assistance.

How NEER helps: Flood models that document the mitigation component.

NCEM hazard mitigation intake (HMGP, FMA, BRIC)

North Carolina Emergency Management, Hazard Mitigation Section
Check agency
GrantStormwater & flood
Next date
FMA Swift Current (DR-4889, Tropical Depression Chantal): state intake closed Oct 16, 2026; final sub-applications due in FEMA GO by 5 p.m. Jan 8, 2027. FY2026 FMA: state deadline not posted; check NCEM. BRIC FY2024–25 letters of interest closed Jun 12, 2026.
Funding
Passes through FEMA funds. Swift Current: $20M, up to 100% for severe repetitive loss, 90% repetitive loss, 75% other. BRIC FY2024–25: up to $150M to the state; 75% federal, and NCEM suggests a 70/30 split for overmatch points.
Who
Local governments and tribes with a FEMA-approved hazard mitigation plan; for FMA, NFIP communities in good standing. Homeowners take part through their county or city.
Pays for
Acquisition, elevation and mitigation reconstruction of flood-prone homes; infrastructure such as culvert replacement, stream restoration, drainage and water and wastewater protection.

Letters of interest and sub-applications go through NCEM's Salesforce portal before FEMA GO. BCAs must reach 1.0; NCEM recommends hiring someone experienced with FEMA's BCA Toolkit. Helene HMGP (DR-4827) infrastructure sub-applications went to FEMA in Mar–Apr 2026, and NCEM posts each project's status.

How NEER helps: Benefit-cost analysis inputs from flood models; hazard mitigation plan action items.

GrantStormwater & flood
Next date
2025 round closed Nov 28, 2025. No new round posted; check the agency.
Funding
Initial $20M, at least $15M for the Helene area. Up to $2M per recipient and $4M per county. Up to 100% state funded, paid by reimbursement.
Who
Local governments and nonprofits
Pays for
Structural and nonstructural flood mitigation, stormwater and drainage, transportation resilience such as culverts, and engineering grants to design shovel-ready projects.

Recipients must seek insurance and federal aid first and repay state funds that duplicate them.

How NEER helps: Engineering studies that turn a flood problem into a shovel-ready design.

GrantStormwater & flood
Next date
Annual cycle expected to open Jan 15, 2027 and close Mar 1, 2027 at 11:59 p.m.; awards in the fall.
Funding
Planning grants have been capped at $75,000 in recent years; check the agency for others. Match is not required but scores points.
Who
State agencies, local governments and conservation nonprofits
Pays for
Stream and floodplain restoration that improves flood resiliency, innovative stormwater projects, and planning.

DEQ's Flood Resiliency Blueprint adds money to the Fund's cycle for flood risk reduction: $1.1M for three projects in 2025, including a pond retrofit in Smithfield. Talk to a field representative before January.

How NEER helps: Stormwater and floodplain models that show the flood benefit.

Opening soon
GrantStormwater & flood
Next date
Spring 2027 cycle opens Jan 1, 2027 and is expected to close Jun 30, 2027.
Funding
Up to 50% of non-federal project costs; DWR advises asking for no more than $200,000.
Who
Local governments. Nonprofits, consultants and universities can act as the primary contact for a local sponsor.
Pays for
Water management (stormwater control measures, flood reduction, drainage), stream restoration, water-based recreation, and feasibility or engineering studies for them.

Schedule the required 30-minute pre-application call by June 1. Nature-based designs are the most competitive. Federal money can't be match but lowers the total.

How NEER helps: Flood reduction and drainage studies.

Resilient Coastal Communities Program (RCCP)

NC DEQ, Division of Coastal Management
Next cycle
GrantStormwater & flood
Next date
Phase 3 and 4 applications closed Nov 10, 2026; contracts expected from April 2027. Next round not announced.
Funding
About $2.5M across Phases 3 and 4
Who
Counties, cities and tribes in the 20 CAMA counties that finished RCCP Phases 1 and 2 or an equivalent
Pays for
Phase 3: engineering, design and permitting of priority resilience projects. Phase 4: construction, including flood mitigation, stormwater, wetland and stream restoration and living shorelines.

The project must already be a priority in the community's resilience strategy.

How NEER helps: Flood and surge models for design.

Rural Infrastructure grants (job creation)

NC Department of Commerce, Rural Economic Development Division, for the Rural Infrastructure Authority
Rolling
GrantDrinking waterWastewater (sewer)
Next date
Next deadlines Jan 7, Feb 22 and Apr 29, 2027 (awards Feb 18, Apr 15 and Jun 17).
Funding
Set case by case by location, jobs and impact. 5% cash match, not from other state or federal grants.
Who
Local governments in Tier 1 or Tier 2 counties, or in a rural census tract of a Tier 3 county
Pays for
Public water and sewer lines and treatment plants, and other public infrastructure that leads to new full-time private-sector jobs.

A named company must commit to jobs; the grant is clawed back if they aren't created and kept. Golden LEAF's Economic Catalyst and SITE programs fund similar work.

How NEER helps: Capacity checks for the new customer.

GrantDrinking waterWastewater (sewer)
Next date
Open Grants: year-round. Economic Catalyst: before the company announces.
Funding
Open Grants: most $200,000 or less, up to $500,000 for some projects. Economic Catalyst: check the agency.
Who
Governmental entities and 501(c)(3) nonprofits, for projects in tobacco-dependent or economically distressed areas
Pays for
Public water and sewer that serve job creation or an industrial site.

Economic Catalyst needs a company commitment to jobs that are at risk without the grant. Talk with Golden LEAF staff first.

How NEER helps: Utility extension sizing for sites.

Local and regional County and regional cost-share programs.

Charlotte-Mecklenburg Floodplain Buyout Program

Mecklenburg County Storm Water Services
Check agency
Match helpStormwater & flood
Next date
Properties are chosen yearly through the county's Implementation Guide
Funding
$90.5M invested since 1999 (43% federal, 2% state, 48% local); $4M in current buyouts, most fully local
Who
Owners of flood-prone property in Charlotte-Mecklenburg's regulated floodplains; buyouts are voluntary
Pays for
Buys and removes flood-prone buildings and returns the land to floodplain and open space.

The county ranks about 5,000 floodplain properties by flood risk and cost-effectiveness in its Risk Assessment, Risk Reduction Plan, and pairs local money with FEMA mitigation grants.

How NEER helps: Property-level flood risk scoring like the county's plan.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. NC DEQ DWI Fall 2026 Funding Program Highlights: CWSRF
  21. NC DEQ DWI Fall 2026: Principal Forgiveness Determination
  22. NC DEQ DWI: Funding Application Forms and Additional Resources (rolling cut-off dates)
  23. NC DEQ DWI: Fall 2026 Application Training, BUMP and WWEE Training
  24. NC DEQ DWI Spring 2026 Funding Program Highlights (one-sheets)
  25. NC DEQ DWI: Latest Funding Round Updates (Authority award lists)
  26. NC DEQ DWI Fall 2026 Funding Program Highlights: DWSRF
  27. NC DEQ DWI Fall 2026 Funding Program Highlights: DWSRF Lead Service Line Replacement
  28. NC DEQ DWI Fall 2026 Funding Program Highlights: Emerging Contaminants planning studies
  29. NC DEQ DWI Fall 2026 Funding Program Highlights: Emerging Contaminants construction
  30. NC DEQ DWI Fall 2026 Funding Program Highlights: CDBG-I
  31. NC DEQ DWI Fall 2026 Funding Program Highlights: State Reserve Program for Construction
  32. NC DEQ DWI Fall 2026 Funding Program Highlights: State Reserve Program for Planning (AIA, MRF)
  33. NC DEQ DWI: Viable Utilities and the Viable Utility Reserve
  34. NC DEQ press release: Spring 2026 funding application training (Feb 12, 2026)
  35. NC DEQ DWI: Stormwater Funding Program (LASII)
  36. NC DEQ press release: March 2 final deadline for Helene water, wastewater and septic funds (Feb 9, 2026)
  37. NC DEQ press release: $215 million for drinking water and wastewater projects (Apr 16, 2026)
  38. NC DEQ DWI: CWSRF Helene Decentralized Wastewater Treatment Systems (Septic) Program
  39. NC Commerce press release: Renew NC launches Community Infrastructure Program (Jul 6, 2026)
  40. NC DPS Emergency Management: Non-Disaster Grants (BRIC, FMA)
  41. NCEM NOFA: FY2026 Flood Mitigation Swift Current, DR-4889-NC (TS Chantal)
  42. NCEM: Notice of Funding Availability for BRIC FY24-25
  43. NCEM: Helene Hazard Mitigation Application Submissions (updated Nov 24, 2026)
  44. NCEM: Disaster Hazard Mitigation Grants
  45. OpenFEMA Disaster Declarations Summaries, North Carolina since Jun 2024
  46. NCEM NOFO: Disaster Relief and Mitigation Fund 2025
  47. NC Land and Water Fund: Apply for a Grant
  48. NC Land and Water Fund: 2026 Innovative Stormwater Funding Manual
  49. NC Land and Water Fund: 2026 Restoration Funding Manual
  50. NC Land and Water Fund: 2026 Planning Funding Manual
  51. NC DEQ press release: Flood Resiliency Blueprint awards $1.1M through the Land and Water Fund (Dec 8, 2025)
  52. NC DEQ DWR: Water Resources Development Grant Program
  53. NC DEQ DWR: State and Local Projects grant program overview (Aug 11, 2025)
  54. NC DEQ press release: Communities invited to apply for RCCP Phases 3 and 4 (Sep 1, 2026)
  55. NC Commerce: Infrastructure, State Rural Grants
  56. NC Commerce: Rural Engagement and Investment application deadlines
  57. NC Commerce: GoldenLEAF Infrastructure Grants
  58. Golden LEAF Foundation: Open Grants Program awards (award size and eligibility)
  59. Mecklenburg County Storm Water Services: Floodplain Buyout Program