NC DEQ, Division of Water Infrastructure, for the State Water Infrastructure Authority
Opening soon
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Fall 2026 round closed Sep 30, 2026; awards expected at the Feb 17, 2027 Authority meeting. Spring 2027 round expected to close around Apr 30, 2027.
- Funding
- Fall 2026: about $90M, including $10M in principal forgiveness. Up to $35M per local government per round; about $200M total CWSRF debt per local government. Rate is half the 20-year bond index (2% to 2.5% this year); 0% on the repayable part for 75% or 100% forgiveness projects, about 1% for 25% or 50% forgiveness and Green Project Reserve projects.
- Who
- Local government units: counties, cities, towns, sanitary districts, water and sewer authorities
- Pays for
- Wastewater treatment and collection, reclaimed water, stormwater control measures, stream restoration and energy efficiency.
Forgiveness comes from the Affordability Calculator (25%, 50%, 75% or 100%), from consolidating a nonviable system (up to $3M), or from serving a disadvantaged area (50%, up to $500K). DWI does not contact applicants after the deadline, so state on the application the minimum grant or forgiveness you would accept. Septic repair and septic-to-sewer projects can use the CWSRF decentralized pilot through the rolling application.
How NEER helps: Engineering reports and I/I, capacity and stormwater studies built on calibrated models.
NC DEQ, Division of Water Infrastructure, for the State Water Infrastructure Authority
Opening soon
LoanGrant (principal forgiveness)Drinking water
- Next date
- Fall 2026 round closed Sep 30, 2026; awards expected at the Feb 17, 2027 Authority meeting. Spring 2027 round expected to close around Apr 30, 2027.
- Funding
- Fall 2026: about $70M, including $19M in principal forgiveness. Up to $25M per local government per round; about $200M total DWSRF debt per local government. Rate is half the 20-year bond index (2% to 2.5% this year); 0% on the repayable part for 75% or 100% forgiveness projects, about 1% for 25% or 50%.
- Who
- Local government units, nonprofit water corporations and investor-owned drinking water companies
- Pays for
- Drinking water sources, treatment, transmission, distribution and storage.
Forgiveness rules match the CWSRF. Lead service line and PFAS money have their own terms and schedules; see those programs.
How NEER helps: Water system models for engineering reports and alternatives.
NC DEQ, Division of Water Infrastructure
Rolling
LoanGrant (principal forgiveness)Drinking water
- Next date
- Rolling. Applications in by 5 p.m. Jan 11, 2027 go to the Feb 17, 2027 Authority meeting; by Mar 1, 2027 to the Apr 21–22, 2027 meeting. 2027 dates may change when the Authority sets its calendar.
- Funding
- About $50M available, including $20M in principal forgiveness, from the FY2024 and FY2025 federal grants; FY2026 money to follow. 0% interest. Per round: $5M to replace known lead lines, $2M to verify and replace (up to $1M of it for inventory), $1M for inventory and material verification only.
- Who
- Local government units, nonprofit water corporations and investor-owned drinking water companies
- Pays for
- Lead service line inventories, find-and-replace projects and full replacement from the main to the house, for the Lead and Copper Rule Revisions and Improvements.
Half of each round's money is held for inventory projects. Forgiveness follows the Affordability Calculator or a disadvantaged-area benefit. Use the rolling application, not the fall or spring form.
How NEER helps: Lead service line material prediction to target verification and replacement.
NC DEQ, Division of Water Infrastructure
Rolling
Grant (100% principal forgiveness)Drinking waterWastewater (sewer)
- Next date
- Studies: rolling, with cut-offs Jan 11, 2027 and Mar 1, 2027 (subject to change). Construction: with the regular rounds; fall 2026 closed Sep 30, 2026, spring 2027 expected around Apr 30, 2027.
- Funding
- Studies: about $9M (drinking water) and $3.3M (clean water) for FY2026–27, up to $500K per applicant in each. Construction, fall 2026: about $2.8M (drinking water, up to $5M per applicant) and $2M (clean water, no per-applicant limit). All 100% forgiveness.
- Who
- Local government units; nonprofit water corporations; investor-owned companies for the drinking water side
- Pays for
- PFAS planning, alternatives analysis, design and pilot or bench testing; construction of PFAS treatment in drinking water, wastewater and publicly owned landfills.
Construction applications get two scores, one for EC money and one for base SRF money, so claim all eligible priority points. Spring 2026 offered more construction money (about $10M and $4M) than fall.
How NEER helps: Treatment alternatives and system models for PFAS studies.
NC DEQ, Division of Water Infrastructure
Opening soon
GrantDrinking waterWastewater (sewer)
- Next date
- Fall 2026 round closed Sep 30, 2026. Spring 2027 round expected to close around Apr 30, 2027.
- Funding
- Up to $3M per local government every three years. 100% grant, no local match. About $18.9M in fall 2026 and $10M in spring 2026.
- Who
- Non-entitlement cities (under 50,000) and counties (under 200,000) with a project area at least 51% low-to-moderate income. Water and sewer authorities take part as a subrecipient of their town or county.
- Pays for
- Public water and sewer construction that fixes public and environmental health problems in low-to-moderate income areas.
Only the highest scoring application from each local government moves forward. Federal conditions apply to the whole project if CDBG-I is combined with other money. Applications need a mailed hard copy as well as the online submission. An income survey can prove LMI where census data falls short.
How NEER helps: Engineering reports and project area mapping.
NC DEQ, Division of Water Infrastructure
Opening soon
GrantLoanDrinking waterWastewater (sewer)
- Next date
- Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
- Funding
- Fall 2026: about $10M in grants, shared with the planning grants. Up to $3M per project type (drinking water or wastewater) every three years. Grant share set by the Affordability Calculator. No State Reserve loans in fall 2026.
- Who
- Local government units, nonprofit water corporations and investor-owned drinking water companies, when other funding is not reasonably available
- Pays for
- State-funded construction for drinking water sources, treatment, distribution and storage, and wastewater treatment and collection.
DWI says State Reserve loans may return in later rounds.
How NEER helps: Engineering reports and models that size the project.
NC DEQ, Division of Water Infrastructure (State Reserve Program)
Opening soon
GrantDrinking waterWastewater (sewer)
- Next date
- Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
- Funding
- Up to $225,000 per system type every three years. 1.5% fee. Non-distressed systems pay a match based on how many economic indicators exceed state benchmarks.
- Who
- Local government units and nonprofit water corporations with no more than 10,000 residential connections
- Pays for
- Asset inventories, condition assessments, mapping, capital improvement plans, O&M plans and rate studies.
Distressed units can get AIA, rate study and merger study money through the Viable Utility Reserve in the spring round instead.
How NEER helps: Asset inventories, condition assessments and capital plans built on system models.
NC DEQ, Division of Water Infrastructure (State Reserve Program)
Opening soon
GrantDrinking waterWastewater (sewer)
- Next date
- Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
- Funding
- Up to $75,000 per system type every three years. 1.5% fee.
- Who
- Local government units and nonprofit water corporations with no more than 10,000 residential connections
- Pays for
- Studies of merging or consolidating utilities, or of interconnecting for regional treatment or supply.
A completed study can support SRF priority points and forgiveness for consolidating a nonviable system.
How NEER helps: Regionalization alternatives and the hydraulic models for the connection.
NC DEQ, Division of Water Infrastructure, Viable Utilities Unit, with the Local Government Commission
Opening soon
GrantDrinking waterWastewater (sewer)
- Next date
- Offered in the spring round. Spring 2026 closed Apr 30, 2026; spring 2027 expected around Apr 30, 2027.
- Funding
- Spring 2026: about $20M ($18M construction, $2M planning). Up to $5M per construction project and $400,000 per unit for studies each round; lifetime cap of $15M per unit, $30M for units merging. 1.5% fee. All grant.
- Who
- Units designated distressed by the Authority and the Local Government Commission, or units regionalizing with one. A council of governments or regional planning commission may apply in some cases.
- Pays for
- Interconnection, rehabilitation and decentralization projects; asset inventories, rate studies and merger studies; emergency operating grants only when the LGC controls the unit's finances.
Distressed units must complete an asset assessment and rate study, send a delegation to Best Utility Management Practices (BUMP) training, and write an action plan. ARPA VUR money counts toward the lifetime cap.
How NEER helps: Asset assessments and rate study inputs; regionalization models.
NC DEQ, Division of Water Infrastructure
Next cycle
GrantStormwater & flood
- Next date
- No current round. Check the agency.
- Funding
- About $82M in American Rescue Plan Act money
- Who
- Cities, counties, regional councils of government and nonprofit partners
- Pays for
- Construction and planning for stormwater quantity and quality infrastructure.
LASII was a one-time ARPA program; its Q&A was last updated Sep 2022. For stormwater now, look at CWSRF stormwater control measures, Water Resources Development grants and the Land and Water Fund.
How NEER helps: Stormwater models and project prioritization.
NC DEQ, Division of Water Infrastructure
Next cycle
GrantLoanDrinking waterWastewater (sewer)
- Next date
- Final deadline was Mar 2, 2026; all federal Helene SRF money was awarded by the Apr 15–16, 2026 Authority meeting.
- Funding
- EPA allocated $686M to North Carolina. About $861M in state and federal funds awarded for Helene water systems by April 2026; $655M in requested Helene needs remained unfunded.
- Who
- Local governments and nonprofit water or wastewater corporations affected by Helene; investor-owned systems for drinking water; for septic, local governments and nonprofits that finance homeowner repairs
- Pays for
- SRF-eligible projects that reduce flood risk at treatment works or make systems more resilient; septic repair and replacement, and septic-to-sewer connections.
The $22.5M septic program now runs through four nonprofits (Western Piedmont COG with High Country COG, MountainTrue, Clean Energy Fund of the Carolinas, Water Well Trust). Property owners in the 39 DR-4827 counties contact them directly; replacements may start in early 2027. Unfunded Helene projects can apply to the regular rounds.
How NEER helps: Flood exposure and resiliency analysis for plant and pump station relocation.
North Carolina Emergency Management, Hazard Mitigation Section
Check agency
GrantStormwater & flood
- Next date
- FMA Swift Current (DR-4889, Tropical Depression Chantal): state intake closed Oct 16, 2026; final sub-applications due in FEMA GO by 5 p.m. Jan 8, 2027. FY2026 FMA: state deadline not posted; check NCEM. BRIC FY2024–25 letters of interest closed Jun 12, 2026.
- Funding
- Passes through FEMA funds. Swift Current: $20M, up to 100% for severe repetitive loss, 90% repetitive loss, 75% other. BRIC FY2024–25: up to $150M to the state; 75% federal, and NCEM suggests a 70/30 split for overmatch points.
- Who
- Local governments and tribes with a FEMA-approved hazard mitigation plan; for FMA, NFIP communities in good standing. Homeowners take part through their county or city.
- Pays for
- Acquisition, elevation and mitigation reconstruction of flood-prone homes; infrastructure such as culvert replacement, stream restoration, drainage and water and wastewater protection.
Letters of interest and sub-applications go through NCEM's Salesforce portal before FEMA GO. BCAs must reach 1.0; NCEM recommends hiring someone experienced with FEMA's BCA Toolkit. Helene HMGP (DR-4827) infrastructure sub-applications went to FEMA in Mar–Apr 2026, and NCEM posts each project's status.
How NEER helps: Benefit-cost analysis inputs from flood models; hazard mitigation plan action items.
North Carolina Emergency Management
Next cycle
GrantStormwater & flood
- Next date
- 2025 round closed Nov 28, 2025. No new round posted; check the agency.
- Funding
- Initial $20M, at least $15M for the Helene area. Up to $2M per recipient and $4M per county. Up to 100% state funded, paid by reimbursement.
- Who
- Local governments and nonprofits
- Pays for
- Structural and nonstructural flood mitigation, stormwater and drainage, transportation resilience such as culverts, and engineering grants to design shovel-ready projects.
Recipients must seek insurance and federal aid first and repay state funds that duplicate them.
How NEER helps: Engineering studies that turn a flood problem into a shovel-ready design.
North Carolina Land and Water Fund
Opening soon
GrantStormwater & flood
- Next date
- Annual cycle expected to open Jan 15, 2027 and close Mar 1, 2027 at 11:59 p.m.; awards in the fall.
- Funding
- Planning grants have been capped at $75,000 in recent years; check the agency for others. Match is not required but scores points.
- Who
- State agencies, local governments and conservation nonprofits
- Pays for
- Stream and floodplain restoration that improves flood resiliency, innovative stormwater projects, and planning.
DEQ's Flood Resiliency Blueprint adds money to the Fund's cycle for flood risk reduction: $1.1M for three projects in 2025, including a pond retrofit in Smithfield. Talk to a field representative before January.
How NEER helps: Stormwater and floodplain models that show the flood benefit.
NC DEQ, Division of Water Resources
Opening soon
GrantStormwater & flood
- Next date
- Spring 2027 cycle opens Jan 1, 2027 and is expected to close Jun 30, 2027.
- Funding
- Up to 50% of non-federal project costs; DWR advises asking for no more than $200,000.
- Who
- Local governments. Nonprofits, consultants and universities can act as the primary contact for a local sponsor.
- Pays for
- Water management (stormwater control measures, flood reduction, drainage), stream restoration, water-based recreation, and feasibility or engineering studies for them.
Schedule the required 30-minute pre-application call by June 1. Nature-based designs are the most competitive. Federal money can't be match but lowers the total.
How NEER helps: Flood reduction and drainage studies.
NC DEQ, Division of Coastal Management
Next cycle
GrantStormwater & flood
- Next date
- Phase 3 and 4 applications closed Nov 10, 2026; contracts expected from April 2027. Next round not announced.
- Funding
- About $2.5M across Phases 3 and 4
- Who
- Counties, cities and tribes in the 20 CAMA counties that finished RCCP Phases 1 and 2 or an equivalent
- Pays for
- Phase 3: engineering, design and permitting of priority resilience projects. Phase 4: construction, including flood mitigation, stormwater, wetland and stream restoration and living shorelines.
The project must already be a priority in the community's resilience strategy.
How NEER helps: Flood and surge models for design.
NC Department of Commerce, Rural Economic Development Division, for the Rural Infrastructure Authority
Rolling
GrantDrinking waterWastewater (sewer)
- Next date
- Next deadlines Jan 7, Feb 22 and Apr 29, 2027 (awards Feb 18, Apr 15 and Jun 17).
- Funding
- Set case by case by location, jobs and impact. 5% cash match, not from other state or federal grants.
- Who
- Local governments in Tier 1 or Tier 2 counties, or in a rural census tract of a Tier 3 county
- Pays for
- Public water and sewer lines and treatment plants, and other public infrastructure that leads to new full-time private-sector jobs.
A named company must commit to jobs; the grant is clawed back if they aren't created and kept. Golden LEAF's Economic Catalyst and SITE programs fund similar work.
How NEER helps: Capacity checks for the new customer.
GrantDrinking waterWastewater (sewer)
- Next date
- Open Grants: year-round. Economic Catalyst: before the company announces.
- Funding
- Open Grants: most $200,000 or less, up to $500,000 for some projects. Economic Catalyst: check the agency.
- Who
- Governmental entities and 501(c)(3) nonprofits, for projects in tobacco-dependent or economically distressed areas
- Pays for
- Public water and sewer that serve job creation or an industrial site.
Economic Catalyst needs a company commitment to jobs that are at risk without the grant. Talk with Golden LEAF staff first.
How NEER helps: Utility extension sizing for sites.