Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Washington water infrastructure funding

Federal, state and local grants and loans that communities in Washington can use for drinking water, wastewater and stormwater projects.

24Grant programs
8Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 24Loans 8Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Nov 30, 2026
    Deadline
    Washington DWSRF construction and lead service line applications dueSubmit in WALT by 11:59 p.m. About $120M, up to $12M per entity. Last cycle with extra IIJA money.Drinking Water SRF construction and lead service line loans
  2. Dec 4, 2026
    Watch
    Washington Public Works Board meetingHybrid meeting, 9 a.m. to 12:30 p.m. Pre-construction and emergency applications are open until funds run out.Public Works Board pre-construction, planning and emergency loans
  3. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  4. Dec 11, 2026
    Deadline
    Washington FMA Swift Current Step 2 packages due to EMDFor invited jurisdictions: acquisition document packages or full subapplications. EMD still takes pre-applications on a rolling basis.EMD hazard mitigation intake (FMA, BRIC, HMGP)
  5. Dec 15, 2026
    Deadline
    FCAAP Notice of Intent for early reviewA Notice of Intent is required to apply. Sent before Dec 15, Ecology reviews it before the window opens.Flood Control Assistance Account Program (FCAAP)
  6. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  7. Jan 1, 2027
    Watch
    FCAAP 2027–29 planning applications openAbout $1.5M; up to $500K per county; 25% match for planning.Flood Control Assistance Account Program (FCAAP)
  8. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  9. Jan 31, 2027
    Watch
    Ecology SFY2028 draft water quality offer listCovers CWSRF, Centennial, SFAP and Section 319. A public comment period follows.Clean Water SRF loans (Water Quality Combined Funding Program)
  10. Feb 1, 2027
    Watch
    DWSRF project priority list and proposed subsidyDOH sends the list to the Legislature and Commerce. Award letters in March; subsidy final Apr 1, 2027.Drinking Water SRF construction and lead service line loans
  11. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  12. Mar 1, 2027
    Deadline
    FCAAP 2027–29 planning applications closeComprehensive flood hazard management plans, plan updates and work from existing plans.Flood Control Assistance Account Program (FCAAP)
  13. Early Mar 2027 (expected)estimate
    Expected
    Comment period on Ecology's draft offer list endsLast cycle's comment period ran Jan 30 to Mar 3, 2026.Clean Water SRF loans (Water Quality Combined Funding Program)
  14. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  15. Spring 2027 (expected)estimate
    Expected
    Public Works Board construction cycle opensThe Board expects to open the next construction cycle in spring 2027, depending on appropriations. The FY27 cycle ran Jun 1 to Jul 31, 2026.Public Works Board construction loans
  16. Apr 2027 (expected)estimate
    Expected
    King County flood reduction grant round opensBased on the 2026 round, which ran Apr 2 to Jun 5, 2026.Steve Bleifuhs Memorial Flood Reduction Grants
  17. Apr–May 2027
    Watch
    Legislature decides Floodplains by Design 2027–29 fundingApplicants are notified in June 2027; agreements start about Jul 1, 2027.Floodplains by Design grants
  18. Jun 30, 2027
    Deadline
    Last day for FCAAP 2025–27 emergency applications2027–29 emergency applications open Jul 1, 2027. 20% match.Flood Control Assistance Account Program (FCAAP)
  19. Jul 1, 2027 (expected)estimate
    Expected
    Ecology SFY2028 final water quality offer listThe SFY2027 final list came out in June 2026.Clean Water SRF loans (Water Quality Combined Funding Program)
  20. Sep 30, 2027 (expected)estimate
    Expected
    Ecology SFY2029 water quality applications dueBased on the SFY2028 window of Aug 11 to Sep 30, 2026. One application for CWSRF, Centennial, SFAP and Section 319.Clean Water SRF loans (Water Quality Combined Funding Program)
  21. Nov 30, 2027 (expected)estimate
    Expected
    Washington DWSRF construction applications dueDOH sets Nov 30 each year. Funding is expected to be much lower once the extra IIJA money ends.Drinking Water SRF construction and lead service line loans

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Washington: Apply through EMD (HMA@mil.wa.gov). EMD's FY2024 Amended FMA round, with pre-applications due Jun 12, 2026, has been submitted to FEMA. EMD expects new rounds each fall.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Washington: Open in Washington after the December 2025 storms and flooding. Pre-applications were due Oct 2, 2026 and EMD still takes properties on a rolling basis; Step 2 packages are due Dec 11, 2026. The state pays the full non-federal share for acquisitions.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Washington: Apply through EMD. DR-4906 (storms, flooding and landslides, Dec 5 to 19, 2025; 24 counties and 25 tribal areas) was declared Apr 7, 2026. FEMA's declaration data don't show HMGP for it, so ask EMD. EMD's last disaster-specific HMGP round was for DR-4759 and DR-4775 (2024).

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Washington: EMD has submitted Washington's BRIC 2024/25 applications to FEMA.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Washington: Ecology awards it through the Water Quality Combined Funding Program; $945K was offered on the SFY2027 list. There is no separate application.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Washington: DOH runs it with the DWSRF for small (under 10,000) or disadvantaged Group A systems, with PFAS as the top priority. Short-term mitigation is available; innovative technology awards are up to $500K.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In Washington: Washington is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

Washington Department of Ecology (Water Quality Combined Funding: Clean Water SRF, Centennial, Stormwater Financial Assistance; Floodplains by Design; Flood Control Assistance Account Program), Department of Health (Drinking Water SRF), Department of Commerce (Public Works Board, CDBG, CERB), the Military Department's Emergency Management Division (FMA, BRIC, HMGP), and the King County Flood Control District.

Clean Water SRF loans (Water Quality Combined Funding Program)

Washington State Department of Ecology, Water Quality Program
Next cycle
LoanGrant (forgivable principal)Wastewater (sewer)Stormwater & flood
Next date
SFY2028 applications closed Sep 30, 2026 (172 applications, $664.5M requested). Draft offer list by Jan 31, 2027, then a public comment period. Next application window expected Aug to Sep 2027.
Funding
SFY2027: $99.0M in loans, including about $30.0M forgivable principal (incl. $3.8M for emerging contaminants). SFY2027 standard rates: 1.2% (5 yr), 2.5% (20 yr), 3.3% (30 yr). Hardship wastewater construction: 50% to 100% forgivable principal or Centennial grant, up to $5M per project.
Who
Public bodies such as cities, counties, and sewer and water districts; tribes; nonprofits for some nonpoint source work
Pays for
Planning, design and construction of wastewater and stormwater facilities, large onsite systems, onsite sewage repair loan programs and nonpoint source projects.

One application covers CWSRF, Centennial, SFAP and Section 319. Construction hardship needs a service area of 25,000 or fewer and sewer fees of 2% or more of MHI. Preconstruction hardship (up to 50% subsidy) needs 25,000 or fewer and MHI under 80% of the state's. Ecology scores readiness to start within 10 months of the final list. Emergency loans may be available for public wastewater systems serving 10,000 or fewer with a declared local emergency. The SFY2027 list also included $8.0M in Puget Sound Nutrient Reduction grants (up to $350K per plant) and $945K in OSG grants. Terms shown are from SFY2027; confirm in the SFY2028 list.

How NEER helps: General sewer plans and facility plans built on calibrated sewer models; I/I and capacity studies.

Centennial Clean Water Program grants

Washington State Department of Ecology, Water Quality Program
Next cycle
GrantWastewater (sewer)Stormwater & flood
Next date
Applied for through the Water Quality Combined Funding cycle. SFY2028 applications closed Sep 30, 2026; draft offer list by Jan 31, 2027.
Funding
SFY2027: $20.4M. One-third for wastewater construction in hardship communities, one-third for nonpoint source work, the rest competitive.
Who
Public bodies; wastewater grants go to financially distressed (hardship) communities
Pays for
Wastewater preconstruction and construction in hardship communities, a limited range of stormwater activities, and nonpoint source projects such as stream buffers and onsite sewage repair.

Centennial is usually paired with a CWSRF loan. The combined hardship forgivable principal and Centennial grant is capped at $5M per project ($10M when an application covers both a collection system and a treatment plant).

How NEER helps: Facility plans and alternatives analysis for small wastewater systems.

Stormwater Financial Assistance Program (SFAP)

Washington State Department of Ecology, Water Quality Program
Next cycle
GrantStormwater & flood
Next date
Applied for through the Water Quality Combined Funding cycle. SFY2028 applications closed Sep 30, 2026; draft offer list by Jan 31, 2027. Next window expected Aug to Sep 2027.
Funding
SFY2027: $26.8M. Up to $10M per city, county or port per cycle. 15% match; 5% for hardship cities and counties.
Who
Cities, counties and ports
Pays for
Stormwater facilities and some stormwater activities that cut pollution from existing development.

Hardship match needs a population of 25,000 or fewer and MHI under 80% of the state's; ports can't get hardship. A Step 4 design and construction project is capped at $300K total cost. A project can't take hardship from both SFAP and CWSRF.

How NEER helps: Stormwater models and retrofit prioritization to build the application.

Floodplains by Design grants

Washington State Department of Ecology
Awaiting NOFO
GrantStormwater & flood
Next date
2027–29 applications closed May 13, 2026, and the ranked list was due in August 2026. The Legislature decides in April or May 2027; offers in June 2027; agreements start about Jul 1, 2027.
Funding
Set by the Legislature. 2025–27: $75.7M for nine projects. Soft cap of $10M per grant. No match required.
Who
Counties, cities, towns, special purpose districts such as flood control districts, tribes, conservation districts, ports and nonprofits
Pays for
Projects that combine flood hazard reduction with ecosystem restoration: planning, studies and modeling, design, permitting, construction, acquisitions, and home elevation or relocation.

For 2027–29 the pre-application opened Nov 1, 2025, about 20 months before grants started. Check the agency for 2029–31 dates.

How NEER helps: Floodplain and hydraulic models for pre-construction studies and alternatives.

Flood Control Assistance Account Program (FCAAP)

Washington State Department of Ecology
Opening soon
GrantStormwater & flood
Next date
2027–29 competitive planning applications open Jan 1 and close Mar 1, 2027. A Notice of Intent is required; send it before Dec 15, 2026 for early review. Emergency applications are taken through Jun 30, 2027, and the 2027–29 emergency window opens Jul 1, 2027.
Funding
About $1.5M total. Up to $500K per county. Match 25% for planning, 20% for emergency projects.
Who
Cities and towns, counties, conservation districts, special purpose districts such as flood control districts, and tribes (tribes are not listed for emergency projects)
Pays for
New or updated comprehensive flood hazard management plans (chapter 173-145 WAC), work from an existing plan, feasibility studies, mapping including channel migration zones, and emergency flood response.

Planning projects in underserved communities get priority. Ecology held application workshops Nov 18 and 19, 2026.

How NEER helps: Flood models and mapping for comprehensive flood hazard management plans.

Drinking Water SRF construction and lead service line loans

Washington State Department of Health, Office of Drinking Water
Open now
LoanGrant (principal forgiveness)Drinking water
Next date
2026 cycle closes Nov 30, 2026 at 11:59 p.m. in WALT. Priority list and proposed subsidy by Feb 1, 2027; award letters in March; subsidy final Apr 1, 2027. Next deadline expected Nov 30, 2027.
Funding
About $120M; up to $12M per entity. $28.7M for lead service lines (49% as forgiveness for disadvantaged communities). $17.5M for emerging contaminants with up to 100% forgiveness. $3M for water mains replaced alongside other projects (up to $1.5M each). Rates: 2.25% standard, 1.75% for disadvantaged communities; 20 years, up to 30 for disadvantaged.
Who
Publicly and privately owned Group A water systems and tribally owned systems
Pays for
Treatment, storage, mains, consolidation, lead service line inventories and full replacement (public and private sides), and PFAS work.

This is the last cycle with extra IIJA money, and DOH expects much less later. Applicants need an approved water system plan or small water system management program by Nov 30, 2026 (not needed for lead line loans). Disadvantaged subsidy starts at 25% to 50% by affordability index and can reach 75%. 1% loan fee, waived with subsidy. Bids must be done within 18 months of contract.

How NEER helps: Water system models for planning documents; lead service line material prediction.

DWSRF planning and engineering loans and grants

Washington State Department of Health, Office of Drinking Water
Rolling
LoanGrantDrinking water
Next date
Year-round, first come until funds run out
Funding
Up to $500K per jurisdiction per state fiscal year ($200K for water rights test wells). 0% loans over 10 years, 2% fee. Planning grants for disadvantaged systems from 25% (up to $125K) to 100% (up to $500K).
Who
Group A community water systems, nonprofit noncommunity systems, and tribally owned community systems
Pays for
Water system plans, small water system management programs, engineering and other preconstruction work.

A current approved plan is required for a construction loan, so this is the way into the Nov 30 cycle. Plans submitted after Apr 1 aren't prioritized for approval by that year's Nov 30 deadline. Free technical help is available for systems under 10,000 people.

How NEER helps: Water system plans and hydraulic models.

Public Works Board construction loans

Washington State Public Works Board (Department of Commerce)
Next cycle
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY27 cycle ran Jun 1 to Jul 31, 2026; awards approved Oct 2, 2026. Next cycle expected to open spring 2027, depending on appropriations.
Funding
FY27: up to $202M offered; $205M awarded to 47 projects. Example: Okanogan got an $8M loan and $2M grant for its wastewater plant. Check the agency for rates and limits.
Who
Cities, counties, special purpose districts and quasi-municipal organizations. Tribes, school districts and ports are not eligible.
Pays for
Construction of domestic water, sanitary sewer, stormwater, roads, bridges and solid waste systems.

An adopted capital facilities plan (within 10 years) is required by the application deadline. Distressed areas can get reduced interest rates.

How NEER helps: Capital facilities plans and the models behind water, sewer and stormwater projects.

Public Works Board pre-construction, planning and emergency loans

Washington State Public Works Board (Department of Commerce)
Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Open until funds run out. Pre-construction applications are pooled and awarded quarterly. Next Board meeting Dec 4, 2026.
Funding
FY27: up to $20M for pre-construction and planning (about $15.4M left after Oct 2026) and about $7.5M for emergencies ($5.1M left). Emergency help can be low-interest or interest-free loans or grants.
Who
Cities, counties, special purpose districts and quasi-municipal organizations
Pays for
Design, bid documents, environmental studies, right-of-way, permits and capital facilities planning; emergency repairs to public works.

Emergency applicants must show substantial fiscal need. Example award: Long Beach got $255,051 to update its water system plan.

How NEER helps: Water system plans, general sewer plans and design studies.

CDBG General Purpose grants

Washington State Department of Commerce
Rolling
GrantDrinking waterWastewater (sewer)
Next date
Open year-round while funds last. Start with the eligibility form; selected applicants are invited to a 2-part application.
Funding
Up to $2M depending on project type. About $11M a year from HUD.
Who
Small cities, towns and rural counties that don't get CDBG directly from HUD. Districts, tribes and nonprofits can take part only as subrecipients.
Pays for
Public facilities such as water and wastewater, plus community facilities and housing infrastructure. Activities must mainly benefit low- and moderate-income people (80% of county median).

How NEER helps: Engineering support to define the project.

CERB public infrastructure for job creation

Community Economic Revitalization Board (Department of Commerce)
Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Ongoing; the Board meets every two months. Contact CERB staff first to get the application link.
Funding
Committed Private Partner: loans up to $5M per project, 20% cash match. Prospective Development (rural only): up to $3M, 50% match. Both 1% to 3%, up to 20 years, with grants up to 25% of the award.
Who
Cities, towns, counties, tribes, ports, special purpose districts and municipal corporations
Pays for
Water, sanitary sewer, stormwater and other public infrastructure that lets private business create jobs.

Committed Private Partner needs a private development that is ready and depends on CERB approval, with jobs paying above the county median wage. Not for retail, gambling or data centers.

How NEER helps: Utility capacity studies for the development site.

EMD hazard mitigation intake (FMA, BRIC, HMGP)

Washington Military Department, Emergency Management Division
Open now
GrantStormwater & flood
Next date
FMA Swift Current: pre-applications were due Oct 2, 2026 and are still taken on a rolling basis; Step 2 packages due Dec 11, 2026. EMD says new rounds are expected each fall.
Funding
Passes through FEMA funds. For Swift Current, the state pays the full non-federal share of acquisitions and half of it (up to 12.5%) for elevation and other projects.
Who
Local governments, tribes and special districts with a FEMA-approved hazard mitigation plan; NFIP communities in good standing for FMA
Pays for
Flood acquisitions, elevations, floodproofing and other mitigation. BRIC 2024/25 and FMA 2024 Amended applications are now with FEMA.

Swift Current is for NFIP-insured repetitive loss, severe repetitive loss or substantially damaged properties insured by Sep 14, 2026. Email HMA@mil.wa.gov for the list of eligible properties and to join the funding notice list.

How NEER helps: Flood models and benefit-cost support for mitigation applications.

Local and regional County and regional cost-share programs.

Steve Bleifuhs Memorial Flood Reduction Grants

King County Flood Control District
Next cycle
GrantStormwater & flood
Next date
2026 applications ran Apr 2 to Jun 5, 2026; awards announced in September. 2027 round expected about April to June 2027.
Funding
2026: $14.3M budget; 46 requests for $33.2M. No minimum or maximum; past awards $10K to $1.5M. Match encouraged, not required.
Who
Cities and towns in King County, special purpose districts, tribes, nonprofits and King County agencies; homeowner associations and schools for the original category
Pays for
Smaller flood reduction projects with construction: stormwater retrofits, urban streams, coastal erosion and flooding, and culvert replacement. Design-only phases count if they lead to construction.

Projects on the District's 6-year capital list and NPDES-required work are not eligible. Funds must be spent within 36 months.

How NEER helps: Stormwater and stream models to show the flood reduction benefit.

Subregional Opportunity Fund

King County Flood Control District
Next cycle
GrantStormwater & flood
Next date
2027 applications closed Oct 6, 2026. Allocations are final when the Board approves the 2027 work plan.
Funding
10.23% of the District levy, about $8.8M for 2027, split by assessed value with at least $10K per jurisdiction (draft: Seattle $2.95M, Bellevue $944K).
Who
The 40 King County jurisdictions in the District's allocation table
Pays for
Flood and stormwater control projects, and watershed projects whose main focus is flooding or stormwater.

A jurisdiction can bank its share for a later year. Paid by reimbursement; money must be spent within two years of the project start.

How NEER helps: Stormwater studies and models to scope the project.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. Ecology: Water quality grants and loans (SFY2028 combined funding cycle)
  23. Ecology: SFY2027 Final Water Quality Funding Offer List and Intended Use Plan (Pub. 26-10-050, June 2026)
  24. Ecology: SFY2027 Funding Guidelines, Water Quality Combined Funding Program (Pub. 25-10-043)
  25. Ecology: Floodplains by Design grants
  26. Ecology: Flood Control Assistance Account Program (FCAAP)
  27. Department of Health: Drinking Water State Revolving Fund
  28. DOH: 2026 Construction and Lead Service Line Project Funding Guidelines (331-196, rev. July 2026)
  29. DOH: DWSRF Intended Use Plan for FFY2026 capitalization grants (331-722, June 2026)
  30. DOH: DWSRF Planning and Engineering Loan Guidelines (331-537, rev. July 2026)
  31. Public Works Board: Traditional financing programs
  32. Commerce news release: Public Works Board awards $214 million for construction, planning, flood resilience and emergency projects (Oct 7, 2026)
  33. Washington FundHub: Public Works Board FY27 construction funding listing
  34. Public Works Board home page (meetings and news)
  35. Commerce: Community Development Block Grants
  36. Commerce: CDBG General Purpose grants
  37. Commerce: Community Economic Revitalization Board
  38. CERB: Committed Private Partner program
  39. CERB: Prospective Development program
  40. Washington EMD: Hazard mitigation grants
  41. Washington EMD: FMA 2026 Swift Current
  42. Washington EMD: FMA 2026 Swift Current Grant Guidance (Sep 3, 2026, via GovDelivery)
  43. Washington EMD bulletin: Notice of Funding Opportunity, FMA24 Amended (May 29, 2026)
  44. Washington EMD: DR-4759/DR-4775 HMGP
  45. OpenFEMA: Disaster Declarations Summaries, Washington, June 2025 to November 2026
  46. King County Flood Control District: Steve Bleifuhs Memorial Flood Reduction Grant Program
  47. King County Council news release: 2026 flood reduction grant awards, District 8 (Sep 2026)
  48. King County Flood Control District: Subregional Opportunity Fund